Ximen Mining Corp.
29.7.2021 09:07:07 CEST | ACCESS Newswire | Press release
Kenville Gold Mine; Nelson, BC
VANCOUVER, BC / ACCESSWIRE / July 29, 2021 / Ximen Mining Corp. (TSXV:XIM)(FRA:1XMA)(OTCQB:XXMMF) (the "Company" or "Ximen") is pleased to announce a summary of the results of a hydrogeology assessment completed for the Company's 100% owned Kenville Gold Mine project at Nelson in southeastern British Columbia.
The Company recently engaged Ecoscape Environmental Consultants Ltd. ("Ecoscape") to conduct a hydrogeology assessment of the Company's plan to construct a new underground decline at the Kenville Gold mine. The objective of the study was to provide an assessment of the likelihood of hydraulic connectivity between an underlying aquifer that the proposed decline that will pass through it.
The report concluded that the 113 domestic wells currently accessing the aquifer only demand 13,6 % of the annual recharge. The proposed portal at Kenville Gold Mine would have a negligible effect on groundwater supply in the aquifer. Further, the report concluded that it's not likely that there is any connection between the aquifer 511 IIB and Eagle Creek.
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.Photo showing access to the new portal site.
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.Photo of New portal site at Kenville Gold Mine.
Highlights of the report include:
- The Water Resource Atlas identifies aquifer 511 IIB as underlying the Kenville site. This domestic use aquifer is a fractured crystalline bedrock aquifer. The aquifer fact sheet lists it as not likely connected to surface water sources.
- Ecoscape's hydrogeology model indicates the top of bedrock Aquifer 511 is at a minimum of 30 metres below Eagle Creek and that Eagle Creek is perched above this aquifer and separated from it by unsaturated, low-permeability bedrock. Ecoscape concluded that it is quite unlikely that groundwater from Aquifer 511 upwells through the bedrock and overlying glacial till into Eagle Creek near the proposed site. As such, the bedrock aquifer is not likely hydraulically connected to Eagle Creek.
- Given the inferred deep depth to Aquifer 511 and the massive, low permeability nature of local bedrock, Ecoscape expects that nearby springs and drainages are fed by shallow groundwater that daylights in areas where the bedrock-overburden interface is exposed. As such Aquifer 511 is not likely hydraulically connected to these features.
- The proposed decline is away from nearby wells and will intercept groundwater at a distance greater than 520 metres from the nearest well. Along with a relatively low anticipated dewatering rate from the portal, Ecoscape expects a negligible effect on downslope water users.
- Portal dewatering is unlikely to significantly affect groundwater supply in the aquifer. The average annual groundwater recharge to the aquifer may be as high as 805,020 m3/year. Based on conservative estimates from 113 domestic wells, users would require aquifer demands of approximately 103,169 m3/year or 13.6% of estimated annual recharge.
West to East Conceptual Schematic Cross Section
(from a report by Ecoscape Environmental Consultants Ltd.)
A technical video outlining the report can be found on Ximen's Youtube channel
https://www.youtube.com/c/XimenMiningCorp
Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.
On behalf of the Board of Directors,
"Christopher R. Anderson"
Christopher R. Anderson,
President, CEO and Director
604 488-3900
Investor Relations:
Sophy Cesar
604-488-3900
ir@XimenMiningCorp.com
About Ximen Mining Corp.
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.Ximen Mining Corp. owns 100% interest in three of its precious metal projects located in southern BC. Ximen`s two Gold projects, The Amelia Gold Mine and The Brett Epithermal Gold Project. Ximen also owns the Treasure Mountain Silver Project adjacent to the past producing Huldra Silver Mine. Currently, the Treasure Mountain Silver Project is under an option agreement. The option partner is making annual staged cash and stocks payments as well as funding the development of the project. The company has also acquired control of the Kenville Gold mine near Nelson British Columbia which comes with surface and underground rights, buildings and equipment.
Ximen is a publicly listed company trading on the TSX Venture Exchange under the symbol XIM, in the USA under the symbol XXMMF, and in Frankfurt, Munich, and Berlin Stock Exchanges in Germany under the symbol 1XMA and WKN with the number as A2JBKL.
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.This press release contains certain "forward-looking statements" within the meaning of Canadian securities This press release contains certain "forward-looking statements" within the meaning of Canadian securities legislation, including statements regarding the receipt of TSX Venture Exchange approval and the exercise of the Option by Ximen. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "aims," "potential," "goal," "objective," "prospective," and similar expressions, or that events or conditions "will," "would," "may," "can," "could" or "should" occur, or are those statements, which, by their nature, refer to future events. The Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Except to the extent required by applicable securities laws and the policies of the TSX Venture Exchange, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include the possibility that the TSX Venture Exchange may not accept the proposed transaction in a timely manner, if at all. The reader is urged to refer to the Company's reports, publicly available through the Canadian Securities Administrators' System for Electronic Document Analysis and Retrieval (SEDAR) at www.sedar.com for a more complete discussion of such risk factors and their potential effects.
This press release shall not constitute an offer to sell or the solicitation of an offer to buy any securities, nor shall there be any sale of securities in any state in the United States in which such offer, solicitation or sale would be unlawful.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Ximen Mining Corp
888 Dunsmuir Street - Suite 888, Vancouver, B.C., V6C 3K4 Tel: 604-488-3900
SOURCE: Ximen Mining Corp.
View source version on accesswire.com:
https://www.accesswire.com/657528/Ximen-Mining-Advancing-Its-ESG-Mandate-Completes-Hydrogeology-Study-and-Video-Outlining-Water-Usage
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.
About ACCESS Newswire
Subscribe to releases from ACCESS Newswire
Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from ACCESS Newswire
Chervon Appoints Stephen Sarnocinski to President - End User Research, Sales and Service - OPE Commercial Landscaping Market Global21.10.2026 16:00:00 CEST | Press release
NAPERVILLE, IL / ACCESS Newswire / October 21, 2026 / Stephen (Sarno) Sarnocinski is named President - End User Research, Sales and Service - OPE Commercial Landscaping Market Global, effective October 20, 2026, reporting to Joe Galli, CEO. Sarnocinski brings 21+ years of extraordinary experience, performance and leadership to Chervon. He is a high-potential senior executive with an exciting future ahead at Chervon. Sarno will now assume a new role at Chervon focused on pioneering and developing the OPE Commercial Landscaper User Vertical. Sarno was most recently a Senior Vice President - Job Site Solutions for TTI/Milwaukee, leading the Utility, Energy, Communications and Mining Verticals. Over the past 10 years he has held increasingly responsible JSS positions in the Eastern USA. Before his JSS role, he was responsible for Milwaukee East Coast Service Operations. He started his TTI/Milwaukee career rising through a series of store coverage and territory management positions. Before
DataTracks Launches Nova, Filing Software that Takes UK Micro-Entities Through HMRC and Companies House on One Set of Figures21.10.2026 15:45:00 CEST | Press release
LONDON, UK / ACCESS Newswire / October 21, 2026 / DataTracks, the regulatory reporting software and services provider, has launched DataTracks Nova, software that prepares a UK micro-entity's accounts and Corporation Tax return from a single set of figures, produces the iXBRL that HMRC requires now and Companies House will require from 1 April 2028, and files the CT600 with HMRC. Companies House accounts filing runs from the same data in the same product. Until 31 March 2026, many smaller UK companies with straightforward affairs had a free way to do this themselves. CATO (Company Accounts and Tax Online) was a free HMRC online service, run jointly with Companies House, that let a company prepare and submit its own Corporation Tax return and accounts through a simple web form, with no software to buy and no accountant needed. It was only open to companies filing without an agent. HMRC closed it on 31 March 2026. Since 1 April 2026, companies have generally had to use commercial softwar
Fermi Provides Letter to Shareholders from CEO Lee McIntire on Financing Fermi's Next Chapter21.10.2026 14:30:00 CEST | Press release
DALLAS, TX / ACCESS Newswire / October 21, 2026 / Fermi Inc. (NASDAQ:FRMI)(LSE:FRMI), operating as Fermi America™ ("Fermi" or the "Company") today provided the following letter to shareholders from CEO Lee McIntire: Dear Fellow Shareholders, We are living through an extraordinary moment in the development of American infrastructure. As artificial intelligence reshapes industries and economies, reliable power has become one of the most strategically important and sought-after assets in the world. Fermi was founded with this opportunity in mind. At Fermi's Project Matador, we are pursuing one of the most ambitious power and infrastructure developments in the country, designed to deliver the scale and reliability required by the next generation of computing. Throughout my decades in global infrastructure and construction, I have learned that creating a successful infrastructure business requires more than assembling valuable assets. It requires judgment and financial discipline to turn th
PFN and Tenstorrent Selected for NEDO Project on "xPU Design and Development Incorporating Photonics Electronics Integration Technology"21.10.2026 14:00:00 CEST | Press release
TOKYO, JP / ACCESS Newswire / October 21, 2026 / Preferred Networks, Inc. (PFN) and Tenstorrent USA, Inc. (Tenstorrent) have announced today that their joint proposal has been selected by Japan's New Energy and Industrial Technology Development Organization (NEDO) for the theme "xPU Design and Development Incorporating Photonics-Electronics Integration Technology" (*1) under the NEDO-sponsored "Research and Development Project of the Enhanced Infrastructures for Post-5G Information and Communication Systems / Development of manufacturing technologies for advanced semiconductors." AI models and workloads continue to increase in size and computational complexity, and are being adopted across a wide range of industries. This rapid growth has further increased the compute needed for model training and inference, driving demand for more scalable and efficient AI infrastructure. Through a joint research and development project, PFN and Tenstorrent aim to develop a system-level integration of
Polaris Renewable Energy Awards Key Supply Contract and Issues Notice to Proceed on Punta Lima Battery Storage Investment20.10.2026 23:10:00 CEST | Press release
TORONTO, ON / ACCESS Newswire / October 20, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris" or the "Company") is pleased to announce that it has awarded and executed a contract with Trina Energy Storage Solutions (Singapore) Pte. Ltd. ("Trina Storage") for the supply of battery energy storage systems ("BESS") for the Company's Punta Lima project in Puerto Rico. Trina Storage is a global utility-scale energy storage provider with 30 GWh of BESS projects commissioned and under execution worldwide, including more than 6 GWh across Latin America and the Caribbean. The Punta Lima BESS project is being advanced under Puerto Rico's Accelerated Storage Addition Program ("ASAP"), a strategic initiative designed to strengthen grid reliability through the deployment of utility-scale battery energy storage systems co-located with existing generation facilities. As background, on June 5, 2026, Polaris Power US, Inc. ("PPUS") fully executed the BESS Standard Offer Agreement (the "SO1 Agree
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom
