ACCESS Newswire

Silver Spruce Resources Inc.

5.8.2021 11:46:50 CEST | ACCESS Newswire | Press release

Share
Silver Spruce Completes Phase 1 Drilling at El Mezquite Au-Ag Project, Sonora, Mexico

BEDFORD, NS / ACCESSWIRE / August 5, 2021 / Silver Spruce Resources Inc. ("Silver Spruce" or the "Company") (TSXV:SSE)(FRA:S6Q1) is pleased to announce the completion of its Phase 1 exploration drilling at the El Mezquite Au-Ag property ("El Mezquite" or the "Property"). A total of 2,485 metres were drilled in twenty (20) holes covering eight collar locations. The first seven (7) drill holes were completed on June 14th and the Company is anticipating the final results of gold, silver and multi-element analyses by mid-August. The remaining thirteen (13) holes were drilled with two RC rigs from Layne de Mexico and completed as scheduled on July 28th.

"We were pleased to expedite exploration with additional geologists and samplers, and equipped with a second drill, Silver Spruce completed over 1,500 metres during July 21st to 28th. Logging and splitting of samples are progressing quickly at our option partner Colibri Resource's office facilities in Hermosillo. Samples will be submitted to ALS Global through the first week of August and, during September, we are looking forward to assays which reflect the potential of the outcrop samples," stated Greg Davison, Silver Spruce Vice-President Exploration and Director.

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Figure 1. Pad M1 (MEZ-002, 180°, -70°) at El Mezquite showing RC rig from Layne de Mexico

"The Phase 1 RC program (see Figure 1 and Table 1) comprised 20 holes with a combined depth of 2,485 metres and utilized eight drill pad locations focused around a 400m x 600m area with elevated precious metal values to 3.41 g/t Au and 387 g/t Ag. Collars were defined by several northeast-trending veins, structural lineaments and oxide/sulphide transitions interpreted from geological mapping, precious metal assays, multi-element geochemistry, epithermal alteration assemblages and coincident 3D IP chargeability anomalies," said Mr. Davison. "New targets for Phase 2 drilling are developing from our ongoing geological, hyperspectral, LANDSAT and LiDAR compilation, and incoming drill results as available."

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Table 1. Final drill hole data for the Phase 1 El Mezquite exploration program

The Company's first-ever drilling program at El Mezquite was completed in July with samples being submitted to ALS Global in Hermosillo in daily batches of 3-4 holes. Laboratory assay results generally are expected from four to eight weeks after submittal. Laboratory workloads have impacted the projected turnaround timelines for the assays. The data will be released once the final precious metal and multi-element results are in receipt and interpreted for the first seven (7) drill holes, and for the remaining thirteen (13) drill holes, and all of which will contribute to the program design for Phase 2 drilling after the summer rainy season.

El Mezquite, a drill-ready precious metal project located 10 km northwest of the town of Tepoca, and 170 km southeast of the capital city of Hermosillo, eastern Sonora, Mexico, is very well situated in terms of logistics for exploration and is located only twelve kilometres northwest of the Nicho deposit currently under mine development by Minera Alamos (see Figure 2).

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Figure 2. Location Map for El Mezquite, Jackie and Diamante Concessions. Nicho mine development by Minera Alamos located 10 km SE of El Mezquite.

Exploration Overview

The Company undertook an exploration program including environmental permitting for drilling, geological mapping of geologic structures and lineaments, ortho-mosaic photography, rock geochemical and hyperspectral analysis, data compilation and GIS modeling, and a LiDAR survey. Ground truthing of the Au-Ag system with geological mapping and rock sampling was completed in three campaigns between July 2020 and March 2021. All aspects of the exploration program are conducted with strict adherence to COVID-19 protocols for personal safety.

All current samples from the 2020-2021 field programs were submitted to ALS Global for gold, multi-element and hyperspectral analysis. Historical samples (>400) from the 2010-2019 programs also were submitted to provide complementary multi-element and hyperspectral data over the Property database. The assays, LiDAR survey data, and satellite hyperspectral interpretation results are being updated into the project ArcGIS database.

RC Drill Program

The environmental permit, required to drill the Property, was received from SEMARNAT (see Press Release April 20, 2021) and granted to the concession holder, Yaque Minerals S.A. de C.V. ("Yaque") by the Mexican Secretariat of Environment and Natural Resources (SEMARNAT).

The permit allows for fourteen (14) drill pads over the targets in the northern area of the concession. Individual holes achieved depths of 100-200 metres to intersect the target intervals.

Land surface agreements were signed recently with three ranchers to facilitate full access to the Phase 1 collar locations.

Project Background

The 180-hectare Property is easily accessible from Mexican Highway #16 via a southerly-trending unpaved road which traverses through the centre of the known gold mineralization (see Figure 2). High voltage power lines are positioned along Highway #16.

The El Mezquite Project is located within the west-central portion of the Sierra Madre Occidental Volcanic Complex within the prominent northwest-trending "Sonora Gold Belt" of northern Mexico and parallel to the well-known, precious metals-rich Mojave-Sonora Megashear.

Geochemical Analysis, Quality Assurance and Quality Control

Drill chip sample splits are delivered to the ALS sample preparation facility in Hermosillo, Sonora, Mexico. ALS Global in North Vancouver, British Columbia, Canada, is a facility certified as ISO 9001:2008 and accredited to ISO/IEC 17025:2005 from the Standards Council of Canada.

The samples are crushed to 70% passing 2mm (PREP-31) and a split of up to 250 grams pulverized to 85% passing 75 micrometres (-200 mesh). The sample pulps and crushed splits are transferred internally to ALS Global's North Vancouver, Canada or Lima, Peru analytical facility for gold and multi-element analysis. Pulps (50gram split) are submitted for Au analysis by Fire Assay with Atomic Absorption finish (Au-AA24).

The retained pulps also will be analysed by Four Acid Digestion followed by Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) multi-element analyses (ME-ICP61m) with Hg by Aqua Regia and ICP-MS (Hg-MS42).

Over-limit Au and Ag samples will be analyzed by Fire Assay with Gravimetric Finish Ore Grade (Au-GRA21 or Au-GRA22, Ag-GRA21). Overlimit base metals will be analyzed by Four Acid Digestion followed by Ore Grade Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) for Cu, Pb and Zn (Cu-OG62, Pb-OG62, Zn-OG62).

In-house quality control samples (blanks, standards, duplicates, preparation duplicates) are inserted into the sample set. ALS Global conducts its own internal QA/QC program of blanks, standards and duplicates, and the results will be provided with the Company sample certificates. The results of the ALS control samples are reviewed by the Company's QP and evaluated for acceptable tolerances.

All sample and pulp rejects will be stored at ALS Global pending full review of the analytical data, and future selection of pulps for independent third-party check analyses, as requisite.

Qualified Person

Greg Davison, PGeo, Silver Spruce VP Exploration and Director, is the Company's internal Qualified Person for the El Mezquite Project and is responsible for approval of the technical content of this press release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), under TSX guidelines.

About Silver Spruce Resources Inc.

Silver Spruce Resources Inc. is a Canadian junior exploration company which has signed Definitive Agreements to acquire 100% of the Melchett Lake Zn-Au-Ag project in northern Ontario, and with Colibri Resource Corp. in Sonora, Mexico, to acquire 50% interest in Yaque Minerales S.A de C.V. holding the El Mezquite Au project, a drill-ready precious metal project, and up to 50% interest in each of Colibri's early stage Jackie Au and Diamante Au-Ag projects, with the three properties located from 5 kilometres to 15 kilometres northwest from Minera Alamos's Nicho deposit, respectively. The Company also is pursuing exploration of the drill-ready and fully permitted Pino de Plata Ag project, located 15 kilometres west of Coeur Mining's Palmarejo Mine, in western Chihuahua, Mexico. Silver Spruce Resources Inc. continues to investigate opportunities that Management has identified or that have been presented to the Company for consideration.

Contact:

Silver Spruce Resources Inc.
Greg Davison, PGeo, Vice-President Exploration and Director
(250) 521-0444
gdavison@silverspruceresources.com

Michael Kinley, CEO and Director
(902) 402-0388
mkinley@silverspruceresources.com

info@silverspruceresources.com
www.silverspruceresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Notice Regarding Forward-Looking Statements

This news release contains "forward-looking statements," Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future, including but not limited to, statements regarding the private placement.

Actual results could differ from those projected in any forward-looking statements due to numerous factors. Such factors include, among others, the inherent uncertainties associated with mineral exploration and difficulties associated with obtaining financing on acceptable terms. We are not in control of metals prices and these could vary to make development uneconomic. These forward-looking statements are made as of the date of this news release, and we assume no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although we believe that the beliefs, plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that such beliefs, plans, expectations or intentions will prove to be accurate.

SOURCE: Silver Spruce Resources Inc.



View source version on accesswire.com:
https://www.accesswire.com/658521/Silver-Spruce-Completes-Phase-1-Drilling-at-El-Mezquite-Au-Ag-Project-Sonora-Mexico

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

DocStyle Announces DocStyle AI: Document Productivity Tools, Accessible from the AI Assistants Lawyers Already Use19.8.2026 16:00:00 CEST | Press release

The new solution connects DocStyle's document engine to Claude for Word, Microsoft Copilot, and a dedicated chat pane, available for pre-order today ahead of general availability on October 1st. MIAMI, FL / ACCESS Newswire / August 19, 2026 / DocStyle, a leading provider of legal document repair, structuring, and automation solutions, today announced DocStyle AI. Rather than embedding a general AI chat into its software, DocStyle made its full document productivity engine accessible from the AI assistants legal professionals already use, including Claude for Word and Microsoft Copilot, alongside a dedicated DocStyle AI chat pane inside the DocStyle Ribbon. Built on the Model Context Protocol (MCP), an open standard, DocStyle AI is vendor-independent by design, staying reachable as AI models change and protecting the customer's investment. "We have always known that when making substantive changes to Word documents, you have to be inside Microsoft Word," said Chris Cangero, CEO of DocSt

Europe SPAC Summit 2026 to Convene Leading SPAC Sponsors, Investors, and European Growth Companies in Zurich on December 1019.8.2026 15:00:00 CEST | Press release

One-Day, Invitation-Only Summit Maps the Path from European Innovation to U.S. Capital Markets NEW YORK, NY AND ZURICH, SWITZERLAND / ACCESS Newswire / August 19, 2026 / As a landmark year for European companies in the U.S. public markets continues to build momentum, the Europe SPAC Summit will convene the dealmakers driving the region's de-SPAC renaissance, turning its focus to deal flow, capital formation, and every stage of the path from European innovation to a thriving U.S. listing. The invitation-only Summit takes place on Thursday, December 10, 2026, at The Dolder Grand in Zurich, Switzerland, co-hosted by AUM Advisors and MBP Global. The Summit features a keynote session with Kyivstar, Ukraine's largest mobile operator, whose successful Nasdaq listing through a merger with a SPAC sponsored by Cohen Circle, the investment platform founded by fintech pioneer Betsy Cohen, demonstrates that this approach can create real value for Europe's growth companies. The program also includes

SMBs Attract Talent with AI Upskilling as Large Firms Cut Jobs and Benefits, Study Finds18.8.2026 12:00:00 CEST | Press release

General Assembly study finds role-specific AI training is the most effective approach for SMBs NEW YORK CITY, NY / ACCESS Newswire / August 18, 2026 / Small-to-medium employers (SMBs) see their human talent as a key area of investment for the AI era and are seeing strong impact from role-specific AI training, according to new research from General Assembly, a global leader in practical AI skills training. Layoff and benefit reductions at larger companies have made it easier for SMBs to recruit and retain top talent, say 81% of human resources (HR) leaders at SMBs, while nearly half (47%) of SMBs have already hired from larger firms in the past year. "Growth-stage companies see AI adoption as a catalyst, not a cost-cutting exercise," said Daniele Grassi, CEO of General Assembly. "They're able to move faster to implement AI and scale it quickly, and they're upskilling their workforces accordingly. As talent sees daily headlines around layoffs and benefit reductions, they're increasingly

LiberNovo Previews Support Week 2026, Putting Better Ergonomic Support Within Reach18.8.2026 10:00:00 CEST | Press release

Support Week starts August 25. We've got your back. HONG KONG, HK / ACCESS Newswire / August 18, 2026 / One size does not fit all. Yet most ergonomic chairs are still built around a standard frame, leaving taller, broader, and heavier users adapting to the chair instead of the chair adapting to them. LiberNovo is addressing that gap with the Maxis Series, the lead range for LiberNovo Support Week 2026, opening August 25 across the European Union and United Kingdom. Built for Bigger Builds Maxis was engineered at full scale, not adapted from a standard chair platform. A 52 cm seat depth provides greater thigh support, while a wider seat cushion gives users more room to shift naturally. Its reinforced frame supports up to 181 kg. Maxis also features a five-stage recline control system from 105° to 160°, supported by a Segmented Support System using progressive springs. This provides controlled, consistent support throughout the recline range, even under heavier loads. Three configuration

IFS Softeon Announces Successful First Go-Live with BF Global Group in Europe13.8.2026 14:00:00 CEST | Press release

First deployment marks a major milestone in strategic multi-site warehouse modernisation initiative. RESTON, VA / ACCESS Newswire / August 13, 2026 / IFS Softeon, the warehouse management system (WMS) provider delivering visibility from the boardroom to the warehouse floor, today announced the successful go-live of its warehouse management system at the first BF Global Group distribution centre, marking a significant milestone in the companies' strategic partnership announced earlier this year. The first deployment supports a leading premium stroller and baby products brand and represents the initial phase of BF Global Group's broader rollout of IFS Softeon Warehouse Management System across facilities throughout Europe in partnership with Lanark. The implementation was completed through a carefully coordinated weekend cutover, with operations transitioning successfully to the new platform. Since go-live, the facility has successfully processed and shipped both B2B and B2C customer ord

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye