NTHU
22.9.2022 11:01:35 CEST | Business Wire | Press release
On August 20, the Tsing Hua University Hospital Preparatory Office was officially opened in the Xinkong Building at the Taoyuan Metro Corporation’s Qingpu Depot, which is only one MRT station away from the site where the Hospital will be built.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20220922005421/en/
At the opening ceremony (right to left): NTHU senior vice presidents Tai Nyan-hwa and Lyu Ping-chiang, NTHU president W. John Kao, Taoyuan City mayor Cheng Wen-tsan, former NTHU president Hocheng Hong, Taoyuan Metro chairman Liu Kun-I, and Taoyuan Aerotropolis chairman Chen Si-jhen. (Photo: National Tsing Hua University)
NTHU and the Taoyuan City Government have already signed a letter of intent outlining their plan to jointly establish a world-class medical center that will serve the local community; the plan also includes assistance in the training of bilingual teachers and support for science education and experimental education at Taoyuan’s kindergartens, primary, and secondary schools.
The Preparatory Office was officially inaugurated by Taoyuan City mayor Cheng Wen-tsan and NTHU president W. John Kao.
Mayor Cheng has played a key role in the early stages of the Hospital project. He pointed out that Taiwan is good at both electronics and medical care, both of which are taught at NTHU, and that’s why he has been such a staunch supporter of NTHU through all the difficulties which have arisen in the planning stage.
Cheng emphasized that it will take only ten minutes for an ambulance to go from the Taoyuan International Airport to the emergency room at the new hospital; and that in addition to cosmetic surgery and health examinations, the Hospital will also provide critical care and boron neutron capture therapy (BNCT).
Moreover, the Hospital is expected to become a leading center for the development of advanced cell regeneration technology.
President Kao said that this is a very important day for NTHU, in that the school has long had its sights set on medical education, and now the dream has finally come true, noting that “Today is a new milestone in this 50-kilometer journey from NTHU to Taoyuan, which has been going on for some 66 years.”
Kao also noted that this year could be seen as the “year of medicine” at NTHU, since the first batch of medical students has recently been enrolled.
The Hospital will be located near the Hengshan Station (A16) of the Airport MRT line, on a parcel of land provided by Taoyuan City. The size of the parcel is 7.2 hectares, of which 5 hectares will be used for the Hospital itself, while the remaining 2.2 hectares will be used for the affiliated teaching and research facilities.
NTHU senior vice president Lyu Ping-chiang said that the BOT agreement will be finalized by the end of this year, and that construction will start next year, soon after the parcel is transferred. The Hospital is expected to be completed by the end of 2027 and opened in 2028.
The Hospital will initially have 200 general acute care beds, plus an intensive care unit, a respiratory care unit, negative pressure isolation rooms, and a psychiatric unit for both inpatients and outpatients, all of which will be gradually expanded over a number of years to reach a total capacity of 910 beds.
To view this piece of content from cts.businesswire.com, please give your consent at the top of this page.
View source version on businesswire.com: https://www.businesswire.com/news/home/20220922005421/en/
About Business Wire
Subscribe to releases from Business Wire
Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from Business Wire
Rubedo’s RLS-1496 Reduces Actinic Keratosis Pre-Cancerous Skin Lesions by 46% at Four Weeks with Minimal Irritation in Preliminary Results of Phase 1b/2a Study28.5.2026 14:30:00 CEST | Press release
RLS-1496 is an investigational, first-in-class, disease-modifying, selective glutathione peroxidase 4 (GPX4) modulator that targets pathologic senescent and other stressed, aging cells that drive chronic, age-dependent diseases, such as AK, and represents a novel drug category — Adaptive SenoTherapeutics In recognition of May as Skin Cancer Awareness Month, Rubedo is calling attention to the myths and facts surrounding AKs — and to the urgent need for a new generation of treatments that are effective without the side-effect burden of today's options Rubedo Life Sciences, Inc. (Rubedo), an AI-driven, clinical-stage biotech focused on selective cellular rejuvenation medicines targeting aging cells, today announced preliminary results from a Phase 1b/2a study of RLS-1496 in patients with actinic keratosis (AK), a common age-related condition resulting in precancerous skin lesions, that is most commonly seen after age 65.1 The open-label multi-center trial, conducted in the United States,
ExaGrid Wins 5 Industry Awards at Network Computing Awards 202628.5.2026 14:00:00 CEST | Press release
ExaGrid named “Company of the Year” for seventh year in a row ExaGrid®, the world’s largest independent backup storage vendor providing Tiered Backup Storage with the most Comprehensive Security and AI-Powered Retention Time-Lock for Ransomware Recovery, today announced that company was honored with five industry awards, including Air-gapped Ransomware Recovery Product of the Year, Bench Tested Product of the Year, Company of the Year, Data Protection Product of the Year, and the Storage Product of the Year during the Network Computing Awards ceremony, held in London on May 21, 2026. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260528849813/en/ The ExaGrid team headed to the stage five times throughout the Network Computing Awards ceremony in London to accept awards for ExaGrid Tiered Backup Storage. Photo courtesy of Network Computing Awards. The Network Computing Awards are determined by public vote. The 2026 awards mark
Ardoq Launches AI-First Enterprise Architecture Platform28.5.2026 14:00:00 CEST | Press release
Custom Agents, Omnipresent AI Assistant, and AI Import Builder Automate an Estimated 40% of Routine EA Work; Tenneco Already Achieving 292% ROI on Ardoq AI Ardoq, named a 5x Leader in the Gartner® Magic Quadrant™ for Enterprise Architecture Tools, today launched its AI-first enterprise architecture (EA) platform. The release grounds every Ardoq AI output in customers' live architecture data and introduces a new generation of AI agents capable of automating an estimated 40% of routine EA work. Architects today are being asked to defend decisions that generic AI is generating in seconds. Application rationalization choices. ERP transformation roadmaps. AI governance reviews. The questions land on the architect's desk, but the analysis underneath increasingly comes from AI assistants that do not know the architecture. Generic agents reason on whatever document is in front of them, not on the live relationships between applications, dependencies, capabilities, and risks. Ask a generic LLM
European DataWarehouse Launches DealDox®, a Next-Generation Virtual Data Room Built specifically for the Securitisation Market28.5.2026 14:00:00 CEST | Press release
European DataWarehouse (EDW) announced today the launch of DealDox®, a secure virtual data room uniquely tailored to the needs of the securitisation and structured finance market. Developed in response to long‑standing challenges around transaction data and document management, DealDox provides a single, secure environment where all parties throughout the deal lifecycle can collaborate efficiently while maintaining high standards of security, governance, and regulatory alignment. DealDox enables the centralised management of transaction data and documentation, offering robust security, granular access controls, and clear audit trails. The platform integrates seamlessly with EDW’s existing regulatory reporting ecosystem, supporting smoother workflows from deal preparation through to disclosure and compliance. “As a market infrastructure, our role is to reduce complexity and make processes simpler and more transparent for all participants,” said Dr. Christian Thun, CEO of European DataWa
SLB and Vår Energi Expand Digital Collaboration to Scale Well and Integrated Field Development Planning28.5.2026 13:47:00 CEST | Press release
Agreement supports Vår Energi’s ambition to reduce time to first oil, building on multi-discipline, collaborative well planning workflows that reduce cycle times from months to days Global energy technology company SLB (NYSE: SLB) today announced an expanded collaboration with Vår Energi to scale well planning and integrated field development planning across its Norwegian Continental Shelf operations. With collaborative well planning already reducing cycle times from months to days and integrated field development planning expected to support similar benefits, the expanded deployment is designed to support faster, more consistent decision-making as operators work to sustain production from mature offshore assets while managing increasing development complexity. As part of the expanded collaboration, Vår Energi is deploying the Delfi™ digital platform to connect exploration, subsurface evaluation, well planning, subsea design, field development planning, and production in a cloud-native
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom
