Nexa Resources S.A.
21.7.2021 23:52:19 CEST | ACCESS Newswire | Press release
Nexa Resources S.A. ("Nexa Resources", "Nexa", or "Company") is pleased to provide today the drilling and assay results from the second quarter of 2021. This document contains forward-looking statements
LUXEMBOURG / ACCESSWIRE / July 21, 2021 / Nexa's Mineral Exploration program for 2021 comprises a total of 111,000 meters of exploratory drilling, of which 26,533 meters were executed in the second quarter of 2021 through 21 operating drill rigs, totaling 44,404 meters of exploratory drilling in 1H21. The program in Peru accounts for 69,000 meters, in Brazil for 30,000 meters and in Namibia for 12,000 meters.
In Peru, 23,131 meters were drilled in 2Q21 with 14 rigs, totaling 33,998 meters in 1H21. At the Pasco Complex, the exploration was focused at the Sara Sur target in El Porvenir with thick and high grade new intersections. At Cerro Lindo, drilling in 2Q21 has remained focused at the Pucasalla target, aiming to expand the new VMS discovery at the site and near mine underground ore body expansion at orebody 9 and 5B.
In Brazil, 2,785 meters of exploratory drilling was executed with 5 rigs in 2Q21, totaling 7,555 meters in 1H21. At Aripuanã, exploratory drilling has been focused on northwest extension at Babaçu and new drilling continues to confirm a high-grade mineralization area.
In Namibia, 617 meters were drilled in 2Q21 with 2 rigs, totaling 2,851 meters in 1H21. Exploratory drilling was focused on exploratory targets at the Otavi and Namibia North projects.
2Q21 Mineral Exploration Highlights
- In Cerro Lindo, drilling results continue to confirm continuity of orebody 9 after 1,332 meters drilled with thick intersections such as 23 meters with 13.38% ZnEq and 17 meters with 7.79% ZnEq.
- The new discovery of VMS mineralization at the Pucasalla target located 4.5 kilometers northwest of the Cerro Lindo mine revealed thick intersections such as 24.9 meters with 5.66% ZnEq and 19.7 meters with 12.85% ZnEq.
- In El Porvenir, drilling activities continue to confirm lateral extensions of the Sara orebody. At Sara Sur, target thick intersections up to 42 meters @ 17.30% ZnEq were confirmed as a result of drilling.
- At Vazante Extremo Norte, the continuity of willemite mineralization was confirmed in a northwest Varginha parallel trend to the main orebody.
- In Morro Agudo, we have confirmed that the Bonsucesso mineralized zone extends at depth along a parallel southwestern trend.
- At Aripuanã, exploratory drilling continued at the deep northwest extension of Babaçu, confirming massive sulfide VMS mineralization. Highlight to drill hole BRAPD000080 along with a broad 400 meters interval including 147,1 meters with 5.61% ZnEq.
- At Hilarión, drilling confirmed two major orebodies at Hilarión Sur target, the southern extension of the Hilarion deposit. Continuity was confirmed over 180 meters in length, 500 meters in height and 6 to 25 meters in width after 7,218 meters drilled in 2Q21.
"During 2Q21, we have continued to produce significant results in all our brownfield exploration programs," commented Jones Belther, Senior Vice-President Mineral Exploration & Technology. "We continue extending the Cerro Lindo ore bodies to the southeast with thick and high grade intersections in orebody 9 opening up a promising mineralized body extension and discovering new mineralized zones like Pucasalla. Pucasalla is the first relevant discovery north of Topará Creek and it opens up a new ground for resource definition and possible reserve increase and life of mine extension for Cerro Lindo. This mineralized body is completely blind at 400 meters vertical depth and it was spotted by geophysics (Quantec Titan electromagnetics survey). It is being outlined in one drill section hosted in a horizontal volcaniclastic rocks layer with a width greater than 250 meters with variable thickness of 5 meters up to 25 meters. The first assay results for Pucasalla are very encouraging, indicating a high-grade mineralized zone.
At the Pasco complex, the Sara orebody continues to be extended to the north and south, with thick and high grade drill intersection in Sara Sur, and in San Gerardo open pit, we obtained several new positive drill intersections. In Vazante, the Varginha Norte trend is being extended to the north and at Morro Agudo/Bonsucesso, the parallel trend continues revealing positive results along strike and at depth.
In Aripuanã, the Babaçu NW confirmed thick intersections with good grades. In Hilarión, new drilling results are confirming thick and continuous bodies in the southern extension of the Hilarión deposit.
These results confirm Nexa is on the right path to grow and extend the mine life of our operations and increment resources of our project portfolio."
For a full version of this document, please go to our Investor Relations website at: http://ir.nexaresources.com
About Nexa
Nexa is a large-scale, low-cost integrated zinc producer with over 60 years of experience developing and operating mining and smelting assets in Latin America. Nexa currently owns and operates five long-life underground mines - three located in the Central Andes of Peru and two located in the state of Minas Gerais in Brazil - and is developing the Aripuanã Project as its sixth underground mine in Mato Grosso, Brazil. Nexa was among the top five producers of mined zinc globally in 2020 and also one of the top five metallic zinc producers worldwide in 2020, according to Wood Mackenzie.
CONTACT:
Roberta Varella
Head of Investor Relations
ir@nexaresources.com
+55 11 3405-5601
SOURCE: Nexa Resources S.A.
View source version on accesswire.com:
https://www.accesswire.com/656545/Nexa-Reports-Second-Quarter-Exploration-Results
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.
About ACCESS Newswire
Subscribe to releases from ACCESS Newswire
Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from ACCESS Newswire
ePropelled to Increase Manufacturing Footprint with $60 Million in U.S. Government Funding to Strengthen U.S. Drone Propulsion Supply Chain11.8.2026 13:00:00 CEST | Press release
Expansion Increases Manufacturing Capacity by 4X and Positions ePropelled as a Leading Domestic Supplier of Advanced Dual-Use Electric Propulsion Systems COVENTRY, UK / ACCESS Newswire / August 11, 2026 / ePropelled, a leading U.S. manufacturer of advanced electric propulsion systems for uncrewed aerial vehicles, aerospace, defense, and commercial applications, today announced a major expansion of its manufacturing operations, increasing its production footprint from 20,000 square feet to 80,000 square feet. The expansion is supported by $60 million in government funding through the Department of War's Industrial Base Analysis and Sustainment program, reinforcing the nation's commitment to strengthening domestic manufacturing of mission-critical drone technologies and advanced dual-use propulsion systems. The expanded facility will increase ePropelled's propulsion system production capacity by more than 4X, enabling the company to meet rapidly growing demand from U.S. government progra
ePropelled to Increase Manufacturing Footprint with $60 Million in U.S. Government Funding to Strengthen U.S. Drone Propulsion Supply Chain11.8.2026 13:00:00 CEST | Press release
Expansion Increases Manufacturing Capacity by 4X and Positions ePropelled as a Leading Domestic Supplier of Advanced Dual-Use Electric Propulsion Systems COVENTRY, UK / ACCESS Newswire / August 11, 2026 / ePropelled, a leading U.S. manufacturer of advanced electric propulsion systems for uncrewed aerial vehicles, aerospace, defense, and commercial applications, today announced a major expansion of its manufacturing operations, increasing its production footprint from 20,000 square feet to 80,000 square feet. The expansion is supported by $60 million in government funding through the Department of War's Industrial Base Analysis and Sustainment program, reinforcing the nation's commitment to strengthening domestic manufacturing of mission-critical drone technologies and advanced dual-use propulsion systems. The expanded facility will increase ePropelled's propulsion system production capacity by more than 4X, enabling the company to meet rapidly growing demand from U.S. government progra
AI/ML Innovations' Subsidiary NeuralCloud Achieves ISO 13485:2016 (MDSAP) Certification11.8.2026 13:00:00 CEST | Press release
Quality Management System Certification Strengthens NeuralCloud's Regulatory Readiness for ECG Software-as-a-Medical-Device Platform TORONTO, ON / ACCESS Newswire / August 11, 2026 / AI/ML Innovations Inc. ("AIML" or the "Company") (CSE:AIML)(OTCQB:AIMLF)(FWB:42FB), a company advancing artificial intelligence and neural-network-based technologies for digital health, is pleased to announce that its wholly owned subsidiary, NeuralCloud Solutions Inc. ("NeuralCloud"), has achieved ISO 13485:2016 certification under the Medical Device Single Audit Program ("MDSAP") for its quality management system. The certification, issued by TÜV USA, Inc., applies to NeuralCloud's quality management system for the design, development, production, and distribution of Software as a Medical Device ("SaMD") for ECG analysis, including advanced PQRST waveform delineation, interval computation, arrhythmia analytics, signal quality scoring, and artifact reporting. ISO 13485 is the internationally recognized qu
RollerAds Launches a Full-Cycle Ad Platform with Traffic, Offers, and Monetization in One Workspace11.8.2026 11:30:00 CEST | Press release
The updated platform unifies campaign management, CPA offers, and website monetization within a single dashboard to help users manage affiliate marketing activities more efficiently from one place. LIMASSOL, CY / ACCESS Newswire / August 11, 2026 / RollerAds announced the official launch of its new full-cycle advertising platform, designed to simplify digital advertising workflows by bringing the entire process into a single workspace. The new platform is now live at my.rollerads.com following several months of open beta testing and product refinement based on user feedback. "Our goal was to make affiliate marketing management simpler and more efficient," said Pierre Bertin, Head of International Business Development at RollerAds. "With the new platform, users can work with campaigns, CPA offers, and monetization tools in one dashboard without switching between multiple accounts or services." One dashboard for the entire advertising workflow The new RollerAds platform allows users to m
Power to Hydrogen Delivers First-of-a-Kind Industrial-Scale AEM Electrolyzer to the Port of Antwerp-Bruges11.8.2026 08:00:00 CEST | Press release
Half-Megawatt System Uses 250-Kilowatt Stacks for Efficient Hydrogen Production At Scale; Installation Now Underway with Commissioning in September ANTWERPEN, BELGIUM / ACCESS Newswire / August 11, 2026 / Power to Hydrogen (P2H2), a developer of anion exchange membrane (AEM) electrolyzer systems, today announced it has delivered and begun installation of a first-of-a-kind half-megawatt AEM electrolyzer at the Port of Antwerp-Bruges in Belgium. The project is the world's first to utilize 250-kilowatt AEM electrolyzer stacks and, once commissioned, will be the first AEM system to demonstrate renewable hydrogen production in a high-throughput industrial port environment under real operating conditions. The milestone marks a major step forward in delivering cost-competitive hydrogen at scale and sets the stage for its public launch, planned for September. The Port of Antwerp-Bruges system is Power to Hydrogen's first commercial deployment of its M-Class hybrid AEM electrolyzers, designed t
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom
