Business Wire

MORI-BUILDING

24.1.2023 03:01:40 CET | Business Wire | Press release

Share
Mori Building to Open Toranomon Hills Station Tower this Coming Autumn

Mori Building Co., Ltd., Japan’s leading urban landscape developer, announced today that the 49-story Toranomon Hills Station Tower will open this coming autumn. This project is being led by the Toranomon 1 & 2-chome District Urban Redevelopment Association, in which Mori Building is a leading participant. With the birth of Toranomon Hills Station Tower, which currently is being thoroughly integrated with Toranomon Hills Station, the entire Toranomon Hills area, which has been expanding and evolving at an unprecedented speed toward the realization of a new international hub and global business center, will be completed as a “city” boasting a scale and impact comparable to that of Roppongi Hills.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20230123005232/en/

To view this piece of content from mms.businesswire.com, please give your consent at the top of this page.

Completion image of Toranomon Hills (Note: please be sure to state the copyright “©The Boundary” when using this image.) (Graphic: Business Wire)

Toranomon Hills Station Tower is a multi-purpose 266-meter high tower with 49 floors above ground and 4 floors underground. By integrating the overall development with Toranomon Hills Station on the Tokyo Metro Hibiya Line, the tower will be complemented by a large and bustling station plaza and a pedestrian deck measuring 20 meters in width above Sakurada-dori Avenue (National Route 1), offering access to Toranomon Hills Mori Tower Oval Square. By strengthening and expanding the local multilevel transportation network on the ground, underground and the deck-level, the Station Tower will greatly enhance the Toranomon Hills as a transportation node and will enliven the entire area by significantly improving pedestrian flows.

The Station Tower will offer world-class office, as well as retail facilities integrated with the station plaza and a hotel making its debut in Tokyo. The tower‘s top-most level will be home to TOKYO NODE, an interactive communication facility consisting of halls, galleries, pool, restaurants, and other facilities fully capable of creating new values, ideas and business transcending domains, aimed at sharing creativity with the world.

The Toranomon Hills will be expanded to 7.5ha and total floor space of 800,000m2 with the opening of Toranomon Hills Station Tower in autumn, 2023. The area is steadily evolving as a mixed‐use complex integrated with urban infrastructures such as road and subway, with an impact comparable to that of Mori Building's epoch-making Roppongi Hills.

Open and Lively “Station Atrium” Created through Integrated Development of Station and Neighborhood

The Station Atrium (2,000m2) is a three-story atrium-style vaulted space combining coordinated and complementary urban and transportation functions.

The Station Atrium’s direct connections between the station plaza and nearby facilities for events and shopping keep the space bustling with a steady flow of people from morning till night.

20m-wide Large-scale Pedestrian T-Deck above Arterial Road

The 20m-wide large-scale pedestrian T-deck above Sakurada-dori Avenue (National Route 1) and connected to Toranomon Hills Mori Tower’s Oval Square. The elevated walkway, which passes through the Station Tower, is the main route for east-west pedestrian traffic, crossing districts and arterial road. It realizes safe urban spaces by separating pedestrians and vehicles in the area, and will function as a square linking people in Toranomon Hillls.

Interactive Communication Facility Connecting Tokyo with the World: TOKYO NODE

Toranomon Hills Station Tower’s top floors (45th to 49th floors, partly 8th) will be a home to TOKYO NODE, a 10,000m2 interactive communication facility.

Main hall and three galleries can be used individually or integrated as one contiguous venue. On the rooftop, sky garden, pool, and two restaurants curated by world-class chefs will open, including a grill restaurant supervised by Kei Kobayashi, the first Asian chef to earn three Michelin stars in Paris. The laboratory on the 8th floor, will further enhance the facility’s capacity as a highly functional and distinctive space for communication and knowledge-sharing, wholly unlike traditional conference and banquet facilities.

Furthermore, TOKYO NODE will serve as an information dissemination platform of for the entire Toranomon Hills area, allowing Toranomon Hills to evolve into a “communication hub” that attracts highly experienced and influential people from throughout the world for business creation and innovation to share globally.

New Office Space for Connecting People
Responding to Diverse Needs and New Workstyles

Office area located on 9th, 10th, 15-44th floors (total 32 floors), offers a total rental area measuring some 107,000 m2 and standard floors of about 3,400m2, including column-free plans with depths from core to window surface of about 18.5m, accommodate diverse workstyles and other needs of global companies.

In addition, eight "magnet zones" are equipped with atrium spaces and staircases, connecting the upper and lower floors to promote communication and collaboration among workers, and create more dynamic and creative workplaces.

Retail Facilities Support Global Players’ Work and Lives

A retail space measuring about 14,400m2 will occupy nine floors (B2-7th) with some 80 stores that support the work and lives of global players including office workers and residents.

The T‐Market (27 shops, approx. 3,000m2) will be full of life from morning till night (7am to 11pm) with restaurants, delis and stores. The restaurants will offer high-quality but reasonably priced menus, many curated by highly acclaimed chefs and pâtissiers, including some with Michelin or Bib Gourmand credentials.

Hotel Toranomon Hills: Tokyo's First Unbound Collection by Hyatt

The 1st floor and 11th to 14th floors will be home to the Hotel Toranomon Hills with 205 guest rooms including standard rooms measuring about 27m2 to 34m2. The hotel brand is “The Unbound Collection by Hyatt,” which will be making its debut in Tokyo as a part of “Independent Collection.”

It will serve as an “urban living room of Toranomon” welcoming a variety of guests with its restaurant, cafe and lounges open to the city.

All food and beverage experiences in the hotel‘s café and restaurant will be supervised by Sergio Herman,. Herman is a native of the Netherlands and longtime Michelin-starred chef and this will be his first foray into Japan.

World-leading Architects, Designers and Artists

  • Design: Shohei Shigematsu (OMA)

The Design of Toranomon Hills Station Tower is OMA’s first large-scale architectural project in Tokyo.
Its design is based on ”THE ACTIVITY BAND” concept, or urban axis running from Shintora-dori Avenue to the Akasaka/Toranomon area, creating a symbolic place for people to gather and interact along the axis.

  • Hotel Design (interior): Space Copenhagen

The hotel interior design is by Space Copenhagen, a Denmark Interior design firm, which will be their first interior design in Japan.

Multiple Global Environmental Certifications Received

Toranomon Hills area received preliminary Platinum certification, the highest rank in the LEED program’s ND category.

Station Tower’s offices and retail facilities have received preliminary Platinum certification in the BD+C:CS category and WELL preliminary certification and are expected to earn top Platinum certification once completed. It is Japan’s second largest precertified property, following the Azabudai Hills.

In addition, Station Tower will be 100% powered by RE100-compliant renewable energy from the time of its completion.

To view this piece of content from cts.businesswire.com, please give your consent at the top of this page.

View source version on businesswire.com: https://www.businesswire.com/news/home/20230123005232/en/

About Business Wire

Business Wire
Business Wire
101 California Street, 20th Floor
CA 94111 San Francisco

http://businesswire.com
DK

Subscribe to releases from Business Wire

Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from Business Wire

Venture Global Announces Final Investment Decision and Financial Close for Phase 2 of CP2 LNG13.3.2026 15:23:00 CET | Press release

$8.6 billion project financing for CP2 Phase 2 brings project’s total financing to $20.7 billionProject expected to make Venture Global the largest exporter of US LNGUnprecedented milestone of five FIDs in less than 7 years, with over $95 billion in capital markets transactions Today, Venture Global, Inc. (NYSE: VG) is announcing a final investment decision (FID) and successful closing of an $8.6 billion project financing for the second phase of the company’s third project, Venture Global CP2 LNG (CP2). When combined with the Phase One financing for CP2 announced July 2025, this milestone represents the largest standalone project financing in the U.S. bank market.The transaction garnered enormous interest from the world’s leading banks, resulting in over $19 billion of commitments for Phase Two in addition to the previous $34 billion of commitments for Phase One, and required no outside equity investment. “We are extremely proud to have taken FID on the second phase of CP2, our third g

NIQ Launches Beta of New AI-Powered Analytical Capabilities in Ask Arthur13.3.2026 12:00:00 CET | Press release

AI-guided analysis helps brands and retailers turn data into decision-ready insights NIQ (NYSE: NIQ), a global leader in consumer intelligence, has launched new AI-powered analytical capabilities in beta within Ask Arthur on the NIQ Discover platform. The expanded experience guides users through end-to-end analysis—helping them identify what matters in the data, understand why trends are occurring, and turn insights into clear, shareable narratives with recommended next steps. As organizations navigate increasing data complexity, the ability to move quickly from insight to action has become essential. Ask Arthur helps shorten analytical processes that once took days or weeks into minutes by surfacing the key drivers behind performance changes and generating decision-ready insights directly within Discover. By connecting analysis, explanation, and storytelling in a single experience, users can move seamlessly from understanding what is happening in the data to determining what to do nex

Reply at NVIDIA GTC: Digital Twins and Physical AI Driving the Next Stage of Industrial Value Creation13.3.2026 11:24:00 CET | Press release

Reply [EXM, STAR: REY] will be present at NVIDIA GTC from 16 to 19 March 2026 in San Jose, California, showcasing how companies can optimise production and logistics processes, scale robotics and sustainably increase industrial performance using digital twin technology and physical AI. The conference is regarded as the most important international meeting point for AI developers, researchers and decision makers. This year, more than 30,000 participants from over 190 countries are expected to attend. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260313000399/en/ By attending NVIDIA GTC, Reply is showcasing how digital simulation and physical automation are already being integrated in practice. Projects for the Otto Group and the industrial edge domain show how physical AI and precise digital twins work together to create new opportunities for industrial value generation. The focus will be on two concrete use cases that demon

Klarna Board Chair Michael Moritz Acquires 3.47 Million Shares for $50 Million13.3.2026 11:05:00 CET | Press release

Klarna Group plc (NYSE: KLAR) today discloses the following transactions by the Chair of its Board of Directors and Chief Product & Design Officer, filed with the U.S. Securities and Exchange Commission on Form 3. Share Purchases Michael Moritz, Chairman, through an associated entity, purchased 3,472,845 ordinary shares between March 3 and March 11, 2026, at an aggregate consideration of $49,913,138.73. David Fock, Chief Product & Design Officer, purchased 27,000 ordinary shares on March 9, 2026, for an aggregate consideration of $388,552.14. Share Sales David Sandström, Chief Marketing Officer, sold 32,703 shares on March 9, 2026, pursuant to a Rule 10b5-1 trading plan, established in 2025. David Sykes, Chief Commercial Officer, sold 23,799 shares on March 13, 2026, pursuant to a separately established Rule 10b5-1 trading plan, established in 2025. Form 3 filings for all transactions are available on the SEC's EDGAR database atwww.sec.gov. Forward-Looking Statements This press release

Intertek Launches Comprehensive Digital Product Passport Services13.3.2026 10:00:00 CET | Press release

Supporting circular economy and regulatory compliance Intertek, a leading Total Quality Assurance provider to industries worldwide, has announced the launch of its enhanced Digital Product Passport (DPP) suite of services. This includes a comprehensive advisory service designed to help manufacturers, brands and retailers navigate the fast-evolving regulatory and sustainability landscape associated with digital product passports and circular economy compliance. Mark Thomas, Executive Vice President, Global Sustainability, Assurance, Agri World and Food at Intertek, said: “With the introduction of regulatory frameworks for improving the sustainability performance of products, companies are facing mounting pressure to implement robust systems for transparency, traceability and sustainability reporting globally. This shift marks a significant regulatory milestone, requiring organisations to strengthen data governance, engage suppliers more effectively and demonstrate credible, verifiable s

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye