MI-EATON
Power management company Eaton today announced its Vehicle Group is implementing a new 3D metal printing program as a part of its Industry 4.0 strategy to reduce development time and improve efficiency. The first metal printer system was installed at the Kings Mountain, N.C., facility, and a global deployment of 3D polymer printing technology is slated to be completed by first-quarter 2021.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20201021005571/en/
The 3D printers are being utilized to create high-quality fixtures, safety devices, automation grippers for assembly and handling, and maintenance components requiring replacement. Prototype development is following the same strategy to support faster product development trials and improve efficiency.
Improving output and efficiency
To speed up the design process, scanners are used to create 3D models of existing components. This process allows components to be reverse-engineered to better leverage 3D printing capabilities, including changing component design to use less material, the addition of different topography elements or consolidating multiple components into a single part.
As an increasing number of 3D printers are deployed across the globe, Eaton’s Vehicle Group has been realizing further operational improvements including lead-time reduction and cost savings.
The 3D printing technology adds material only where it is needed and allows more advanced designs to be developed. Together, these two factors reduce the amount of post-processing operations needed while reducing material cost.
A closer look at 3D printing
The process to print metal parts and components begins with powdered metal stored in a rod and held together by wax and a polymer binder. Similar to extrusion, the metal is melted, and the 3D printer begins to add layer after layer, based on its programmed schematics.
Once the printing process is complete, the part or component is run through a chemical bath to remove most of the polymer binder. The part then goes through a furnace to remove the remaining wax and polymer, and to fuse the metal material in a high-density structure. Depending on what the printed part or component is to be used for and which material it was printed with, an additional heat treatment process can be performed to increase part strength even further.
The total lead time to get a component printed depends on several criteria, including the size and intricacy of the part. Depending on the part or component design and required tolerances, it also can undergo post-processing. The debinding operation and heat treatment are done in batches, with several different components going through these processes together while the next components are being printed. Although the printer, debinding and furnace work in an integrated loop, there is flexibility to increase the number of printers without having to duplicate either the debinding or furnace.
Going forward, the Vehicle Group’s 3D printing capabilities will be used to further reduce production time and drive efficiency. Learn more about the Vehicle Group’s Industry 4.0 technologies and benefits.
Eaton’s mission is to improve the quality of life and the environment through the use of power management technologies and services. We provide sustainable solutions that help our customers effectively manage electrical, hydraulic, and mechanical power – more safely, more efficiently, and more reliably. Eaton’s 2019 revenues were $21.4 billion, and we sell products to customers in more than 175 countries. We have approximately 92,000 employees. For more information, visit www.eaton.com .
View source version on businesswire.com: https://www.businesswire.com/news/home/20201021005571/en/
About Business Wire
Subscribe to releases from Business Wire
Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from Business Wire
Enerin raises €15 million Series A to industrialise modular high-temperature heat pumps for global industry26.11.2025 10:00:00 CET | Press release
Norway-based technology leader in industrial heat pumps, Enerin AS, has raised €15 million in an oversubscribed Series A led by Climentum Capital, The Footprint Firm, Johnson Controls and Move Energy. The investment marks Enerin’s transition from technology pioneer to serial production. Proceeds will expand commercial and manufacturing operations, and accelerate next-generation development. Johnson Controls’ participation provides strategic validation and global reach from one of the world’s leading providers of energy systems. Enerin, a technology leader in high-temperature heat pumps, has raised €15 million (NOK 180 million) in a Series A led by Climentum Capital, The Footprint Firm, Johnson Controls and Move Energy, with participation from PSV Hafnium and Momentum. “This investment marks our shift from pioneering to full industrialisation, bringing proven high-temperature technology from Norway to industries worldwide,” said Arne Høeg, Founder and CEO of Enerin. “Industrial companie
IQM to Invest Over €40 Million to Expand Finland Production Facility, Accelerate Innovation and Fuel Growth26.11.2025 09:49:00 CET | Press release
The new facility will produce advanced quantum chips for error corrected quantum computers, almost double the cleanroom space and system assembly line capacity to produce up to 30 quantum computers per year. The integrated quantum computer production line will be one of the world’s most advanced of its kind combining fabrication of quantum chips and system assembly. The expansion is expected to be completed by the first quarter of 2026. The expansion is part of IQM’s long-term commitment to scale its infrastructure and execute the ambitious technology roadmap aiming at 1M quantum computers by 2033. IQM Quantum Computers, a global leader in superconducting quantum computers, today announced over €40 million investment to expand its state-of-the-art production facility in Finland. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20251126943986/en/ This strategic expansion will accelerate the development, fabrication and testing of
Thredd Powers Successful Migration of BigPay’s Card Portfolio to Next-Gen Platform26.11.2025 09:00:00 CET | Press release
The transition of millions of cards showcases Thredd’s superior capabilities amid a high-stakes, global trend of sunsetting legacy processing engagements Thredd, the leading next-generation global payments processor, has successfully migrated BigPay’s virtual and physical card portfolio from its previous, legacy processor to Thredd’s next-generation platform, underscoring Thredd’s leadership in complex card portfolio migrations. The migration project, one of several in recent years, included over 2.5 million cards and highlights Thredd’s unique combination of deep migration experience, robust processes, and advanced technology—qualities increasingly critical as the industry faces a wave of modernisation and replatforming. This achievement comes at a pivotal moment for the industry. Industry analysts estimate that retail banks failing to modernise could see 10% to 15% of their payments revenue at risk annually as legacy platforms struggle to keep pace with demands for hyperpersonalizati
With Two in Five Employees Undergoing Fertility Treatment Leaving Their Jobs or Considering Quitting, Are Companies Doing Enough?26.11.2025 08:00:00 CET | Press release
An international survey, spanning Australia, France, Japan, Poland and the UK, has found that many employees experiencing fertility challenges lack support in the workplace, with almost two in five (39%) leaving or considering leaving their roles while undergoing treatment.1 ‘The Impact of Fertility Challenges at Work: International Insights’ survey by Ferring Pharmaceuticals, Fertility Matters at Work and This Can Happen shows that, despite growing awareness of reproductive health, two thirds (67%) who have experienced fertility challenges say that their workplaces do not offer support for employees undergoing fertility treatment, with France the least likely to provide it (88%).1 60% said they were not clearly entitled to time off for fertility appointments, with time recorded as paid leave, unpaid leave or annual leave (26%), and some also reported taking sick leave due to a lack of flexibility (17%).1 With assisted reproduction therapy, including IVF, already accounting for up to 1
Venture Global and Tokyo Gas Announce 20-Year LNG Sales and Purchase Agreement26.11.2025 01:00:00 CET | Press release
Venture Global’s fourth long-term contract with a Japanese company7.75 MTPA of long-term contracts signed by Venture Global to date in 2025 Today, Venture Global, Inc. (NYSE: VG) and Tokyo Gas Co., Ltd announced the execution of a new, long-term liquefied natural gas (LNG) Sales and Purchase Agreement (SPA). Under the SPA, Tokyo Gas will procure 1 million tonnes per annum (MTPA) of LNG from Venture Global for 20 years, starting in 2030. This deal marks 7.75MTPA of SPAs signed by Venture Global in the last six months. “With nearly 8 MTPA of new long-term commitments signed this year, Venture Global is pleased to build on our commercial momentum through this new partnership with Tokyo Gas,” said Venture Global CEO Mike Sabel. “Tokyo Gas is a pioneer in the LNG industry and leading provider of natural gas to Japan, and we look forward to working with them as we grow our position as a top LNG supplier to Japan. This agreement will contribute significantly to the US-Japan balance of trade o
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom
