ACCESS Newswire

Kingfisher Metals Corp.

9.8.2021 11:31:33 CEST | ACCESS Newswire | Press release

Share
Kingfisher Provides Update on Diamond Drilling and Regional Exploration at the Goldrange Project

VANCOUVER, BC / ACCESSWIRE / August 9, 2021 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:970) ("Kingfisher" or the "Company") is pleased to provide an update on diamond drilling and regional exploration at the Goldrange Project as the Company awaits analytical results. Goldrange is located approximately 25 km south of the town of Tatla Lake in Southwest British Columbia.

The maiden diamond drill program consists of approximately 5,000 m over ~15 holes. Diamond drilling is testing the Cloud Drifter Trend which is defined by a 3 km long gold-in-soil anomaly including 50 samples over 1 g/t Au and rock samples grading up to 128.9 g/t Au. Outside of the Cloud Drifter Trend, regional exploration consisting of rock, stream, and soil sampling is being completed across the 367 km2 project. To date, 4 drill holes have been completed totalling 1,258 m.

Highlights

  • Drilling has encountered widespread zones of quartz-carbonate-sulfide veins, quartz-carbonate-sulfide breccias, and disseminated sulfides within all drill holes completed to date.
  • Sulfide mineralogy includes arsenopyrite, pyrite, marcasite, chalcopyrite, pyrrhotite, sphalerite, boulangerite, stibnite, tennantite-tetrahedrite, and molybdenite.
  • Ongoing regional exploration has collected 2,365 soil samples and 217 rock samples across the tenure with multiple arsenic anomalies identified.

Dustin Perry, CEO of Kingfisher states "Drilling to date has furthered our belief that the Cloud Drifter Trend may host a significant hydrothermal vein system. All drill holes completed to date have intersected widespread quartz-carbonate-sulfide veins, breccias and disseminated sulfides over 300 m of strike and ~430 m of vertical extent. Diamond drilling has collaborated the styles of mineralization and alteration identified on surface in 2020. Outside of the Cloud Drifter Trend, regional grassroots exploration has been moving at an efficient pace and has outlined several areas of arsenic anomalism in soils identified with a portable XRF. Initial prospecting has identified quartz-sulfide veins at several of these locations."

The Goldrange Project covers a significant deformation zone with numerous precious metal veins across the project. Mineralization at Goldrange occurs within the orogenic Yalakom Gold Belt, which is host to the Bridge River District that includes the past producing Bralorne Mine. Several areas of historical hand mining are located within the project and date back to the 1930s.

Diamond Drilling Update

Diamond drilling at the Cloud Drifter Trend has been completed over 4 drill holes totalling 1,258 m (table 1). Figure 1 outlines the drilling progress to date and remaining planned holes.

Planned Drillhole ID

Easting (UTM NAD83)

Northing (UTM NAD83)

Elevation (masl)

Depth (m)

Azi

Dip

GR21-001

388364

5705316

1863

218

341

-45

GR21-002

388364

5705316

1863

482

341

-64

GR21-003

388544

5705532

1717

272

342

-50

GR21-004

388544

5705532

1717

286

320

-64

Table 1: 2021 Cloud Drifter Drill Collars

GR21-001 and GR21-002

The initial two drill holes at the Cloud Drifter Trend were collared from the same drill pad above a thrust fault deformation zone west of the main Cloud Drifter soil anomaly. Field work in 2020 at this location identified an array of east-dipping quartz-carbonate-sulfide veins and quartz-carbonate-sulfide breccia.

GR21-001 (341/-45) intersected a sequence of porphyritic andesite, volcaniclastic conglomerate and siltstone. The upper 44 m intersected the brittle deformation zone with poor recovery and highly oxidized rock. The deformation zone is characterized by abundant Fe-oxide minerals in and near quartz-carbonate veins, interpreted to reflect oxidized sulfide minerals. Intervals of Fe-oxide are associated with high arsenic values (1000 - >10,000 ppm As) identified by a portable XRF* device. Discreet zones of brecciation were encountered throughout the drill hole, associated with pervasive quartz-carbonate alteration and bleaching. Pyrite, arsenopyrite, chalcopyrite, sphalerite, pyrrhotite, and molybdenite were most commonly associated with the brecciated and bleached zones. The drill hole was lost at a final depth of 218 m in what is interpreted to be the principle thrust fault of the deformation zone.

GR21-002 (341/-64) intersected an upper sequence of porphyritic andesite, volcaniclastic conglomerate and siltstone to a depth of 261.1 m. The upper 39 m intersected the brittle deformation zone with poor recovery and highly oxidized rock. The deformation zone is characterized by abundant Fe-oxide minerals in and near quartz-carbonate veins, interpreted to reflect oxidized sulfide minerals. Intervals of Fe-oxide are associated with high arsenic values (1000 - >10,000 ppm As) identified by a portable XRF* device.

Below this sequence are biotite-amphibole quartz diorite and amphibole-pyroxene diorite that were intersected to a depth of 436.3 m, beneath which siltstone was cored to the end of the drill hole. Discreet zones of brecciation were encountered throughout, associated with pervasive quartz-carbonate alteration and bleaching. Zoned chlorite-epidote and biotite hornfels were present at the upper contact between the sedimentary and intrusive rocks. Pyrite, arsenopyrite, chalcopyrite, sphalerite, pyrrhotite, arsenopyrite, and molybdenite were identified within brecciated and bleached intervals in the upper volcanic-sedimentary sequence as well as quartz-carbonate veins in the intrusions. GR21-002 was terminated at a final depth of 482 m.

GR21-003 and GR21-004

The first drill holes designed to test the broad gold-in-soil anomaly at the Cloud Drifter Trend were collared from the same pad upslope of an area of mineralization outlined in 2020. 2020 sampling in this area returned a channel sample grading 2.08 g/t Au over 6 m as well as highlight grab sample up to 53.9 g/t Au.

GR21-003 (341/-50) intersected an upper sequence of biotite hornfels-altered volcaniclastic siltstone, sandstone and conglomerate to a depth of 49.8 m. Within the upper sequence, the top 30 m consisted of highly fractured and oxidized rock with poor recovery. The deformation zone is characterized by abundant Fe-oxide minerals in and near quartz-carbonate veins, interpreted to reflect oxidized sulfide minerals. Intervals of Fe-oxide are associated with high arsenic values (1000 - >10,000 ppm As) identified by a portable XRF* device.

Below the sedimentary rocks, drilling intersected biotite-amphibole quartz diorite and amphibole-pyroxene diorite to 183.4 m, below which siltstone was cored to the end of hole. Pervasive quartz-carbonate-sericite±chlorite alteration is spatially associated with quartz-carbonate-sulfide veins. Pyrite, arsenopyrite, chalcopyrite, marcasite, stibnite, boulangerite, tetrahedrite-tennantite, sphalerite and pyrrhotite were identified within and proximal to quartz-carbonate veins. Vein textures include open space growth, local quartz-carbonate-cement breccia, laminated and shear-banded. GR21-003 was terminated at a final depth of 272 m.

GR21-004 (320/-64) was drilled down dip from GR21-003 and slightly to the west. Drill core logging has not been completed at the time of this news release.

The 2021 diamond drill program is guided by detailed surface geochemical and structural data collected in 2020 in addition to the 2021 IP geophysical survey. Initial drilling is focused on a ~500 m segment of the Cloud Drifter Trend, within the Cloud Drifter Zone, and is defined by the best bedrock exposure and geological confidence. Initial results from the IP geophysical survey indicate the presence of strong chargeability anomalies associated with high-tenor soil geochemical anomalies, strongly anomalous rock chip samples, and mapped mineralization at surface. Analytical results will be released as they become available.

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Figure 1: Cloud Drifter Zone - Drill Update

Regional Exploration Update

Regional exploration at Goldrange is ongoing and has been completed across the length of the project (figure 2). As of the time of this news release, 2,356 soil and talus fine samples have been completed, primarily on grassroots targets. Additionally, 217 rock samples and 7 stream sediment samples have been collected. Backpack drilling has been completed over 13 holes for a total of 37.61 m.

Samples have been analysed daily with a portable XRF* and numerous zones of anomalous As, Sb, Zn, Pb, and Cu have been identified. Infill sampling has been completed at several of these zones. Prospecting within several of these zones has identified areas of quartz-sulfide veining. Analytical results will be released as they become available.

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Figure 2: Goldrange Project - Regional Exploration Update

Qualified Person

Dustin Perry, P.Geo., Kingfisher's CEO, is the Company's Qualified Person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects, and has prepared the technical information presented in this release.

About Kingfisher Metals Corp.

Kingfisher Metals Corp. (https://kingfishermetals.com/) is a Canadian based exploration company focused on underexplored district-scale projects in British Columbia. Kingfisher has three 100% owned district-scale projects that offer potential exposure to high-grade gold, copper, silver, and zinc. The Company currently has 78,747,101 shares outstanding.

For further information, please contact:

Dustin Perry, P.Geo.
CEO and Director
Phone: +1 236 358 0054
E-Mail: info@kingfishermetals.com

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company's property. This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. All statements, other than statements of historical fact, are forward-looking statements or information. Forward-looking statements or information in this news release relate to, among other things: formulation of plans for drill testing; and the success related to any future exploration or development programs.

These forward-looking statements and information reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include; success of the Company's projects; prices for gold remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company's projects; capital, decommissioning and reclamation estimates; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour- related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements and information involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements or information contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: risks related to the COVID-19 pandemic; fluctuations in gold prices; fluctuations in prices for energy inputs, labour, materials, supplies and services (including transportation); fluctuations in currency markets (such as the Canadian dollar versus the U.S. dollar); operational risks and hazards inherent with the business of mineral exploration; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; our ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; changes in laws, regulations and government practices, including environmental, export and import laws and regulations; legal restrictions relating to mineral exploration; increased competition in the mining industry for equipment and qualified personnel; the availability of additional capital; title matters and the additional risks identified in our filings with Canadian securities regulators on SEDAR in Canada (available at www.sedar.com). Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described, or intended. Investors are cautioned against undue reliance on forward-looking statements or information. These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances.

*Readers are cautioned that Portable XRF (X-Ray Fluorescence) spot analyses are not equivalent to laboratory assays; they simply give an indication of the presence of certain metal elements in the drill core. Spot analyses referenced here were collected using an Olympus Vanta XRF Analyzer, which cannot reliably detect Gold, but does detect the geochemical pathfinder elements such as Arsenic, Bismuth, Copper, Antimony, Molybdenum, Lead, and Zinc that are commonly associated with Gold. Assay results are pending.

SOURCE: Kingfisher Metals Corp.



View source version on accesswire.com:
https://www.accesswire.com/658753/Kingfisher-Provides-Update-on-Diamond-Drilling-and-Regional-Exploration-at-the-Goldrange-Project

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

Ore Energy Raises $43 Million to Unlock Renewable Baseload Power for the AI Era4.8.2026 09:00:00 CEST | Press release

Ore Energy is building a fully European-manufactured battery to solve one of the biggest bottlenecks in the energy transition: multi-day storage Europe already wastes an estimated 72 TWh of renewable energy due to grid bottlenecks, equivalent to Austria's annual electricity demand, with losses projected to rise to as much as 410 TWh annually by 2040, according to the European Commission's Joint Research Centre Its iron-air batteries store power for 100 hours at 10x lower cost per unit of energy capacity than lithium-ion, without the need for critical raw minerals like lithium or cobalt AMSTERDAM, NL AND DELFT, NL / ACCESS Newswire / August 4, 2026 / As demand for electricity from AI, manufacturing, and the energy transition accelerates worldwide, Ore Energy has raised $43 million in Series A funding from Plural and HV to scale its iron-air battery technology. Ore's batteries, designed to store renewable electricity for up to 100 hours, can solve one of the biggest barriers to the energ

Clean Air Metals and Fiore-Backed Springbok Ventures Announce Strategic Business Combination1.8.2026 01:15:00 CEST | Press release

Strategic Transaction to Position Thunder Bay North for Development, Strengthen Capital Markets Profile and Create a New Critical Minerals Growth Platform Not for distribution to United States newswire services or for dissemination in the United States. Highlights A strategic business combination with Springbok Ventures, a Fiore Group-backed company focused on critical minerals in Ontario Creation of a growth-oriented critical minerals platform focused on domestic critical minerals in Canada with the ability to pursue future acquisitions and strategic opportunities Minimum C$5 million concurrent financing of subscription receipts Partnership with the Fiore Group, one of Canada's leading mining groups Continued advancement of the Thunder Bay North Critical Minerals Project Addition of the Maude Lake Property in Ontario as an exploration asset THUNDER BAY, ON / ACCESS Newswire / July 31, 2026 / Clean Air Metals Inc. ("Clean Air Metals") (TSXV:AIR)(FRA:CKU)(OTCQB:CLRMF), 1602037 B.C. Ltd.

Review of 31 Studies Finds Vegan Dog Food and Vegan Cat Food Are Well Digested30.7.2026 21:00:00 CEST | Press release

LONDON, UK / ACCESS Newswire / July 30, 2026 / A new scientific review has found that nutritionally sound vegan dog food, vegan cat food and vegetarian pet diets are generally well digested and broadly comparable to conventional meat-based diets. The review, published in the journal Animals, examined 31 existing studies assessing the digestibility of vegan, vegetarian and plant-based pet diets and ingredients in dogs and cats. Twenty-two studies focused on dogs, two on cats and seven included both species. The review found that across a wide range of study designs, dietary ingredients and digestibility measures, vegan and vegetarian diets consistently showed high digestibility and were not normally significantly less digestible than conventional meat-based diets. Digestibility is an important factor because it indicates how effectively animals can absorb and utilise nutrients from food. While modern commercial plant-based pet foods are generally formulated to provide all essential nutr

Polaris Renewable Energy Announces Q2 2026 Results30.7.2026 13:50:00 CEST | Press release

TORONTO, ON / ACCESS Newswire / July 30, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris Renewable Energy" or the "Company"), is pleased to report its financial and operating results for the three and six months ended June 30, 2026. This earnings release should be read in conjunction with the Company's consolidated financial statements and management's discussion and analysis, which are available on the Company's website at www.PolarisREI.com and have been posted on SEDAR+ at www.sedarplus.ca. The dollar figures below are denominated in US Dollars unless noted otherwise. HIGHLIGHTS Second quarter consolidated energy production totaled 199,130 MWh, representing a 8% decrease from 215,797 MWh in the same quarter last year. The decrease was consistent with management's expectations and primarily reflects higher curtailment in the Dominican Republic and the return to normalized hydrological conditions in Peru and Ecuador. The comparative period benefited from exceptionally strong

Polaris Renewable Energy Declares Quarterly Dividend30.7.2026 13:50:00 CEST | Press release

TORONTO, ON / ACCESS Newswire / July 30, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris Renewable Energy" or the "Company"), is pleased to announce that its board of directors has declared a quarterly dividend of US$0.15 per common share outstanding. This dividend will be paid on August 21st, 2026, to shareholders of record at the close of business on August 10th, 2026. The dividend is an "eligible dividend" as designated for Canadian federal, provincial, and territorial income tax purposes. The board of directors of Polaris Renewable Energy remains committed to paying a quarterly dividend and will evaluate further dividend increases, as appropriate, going forward. About Polaris Renewable Energy Inc. Polaris Renewable Energy Inc. is a Canadian publicly traded company engaged in the acquisition, development, and operation of renewable energy projects in Latin America & the Caribbean. We are a high-performing and financially sound contributor to the energy transition. The Compa

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye