Gungnir Resources Inc.
4.1.2023 14:04:15 CET | ACCESS Newswire | Press release
SURREY, BC / ACCESSWIRE / January 4, 2023 / Gungnir Resources Inc. (TSXV:GUG)(OTC PINK:ASWRF) ("Gungnir" or the "Company") is very pleased to report the highest-grade nickel intercept drilled to date at the Company's Lappvattnet nickel deposit in northern Sweden. Hole LAP22-25 drilled 4.04% Ni over 5.76 metres within a broader interval of 1.49% Ni over 18.28 metres starting at a down-hole depth of 57.72 metres. Click link to view drill core (see photos).
Table of individual, consecutive assays for the 5.76 metre high-grade nickel interval in hole LAP22-25 (70.0 to 75.76 metres):
| From (m) | To (m) | Length (m) | Ni % |
| 70.00 | 70.51 | 0.51 | 4.93 |
| 70.51 | 71.20 | 0.69 | 3.73 |
| 71.20 | 72.00 | 0.80 | 2.87 |
| 72.00 | 72.86 | 0.86 | 3.17 |
| 72.86 | 73.20 | 0.34 | 7.18 |
| 73.20 | 73.68 | 0.48 | 3.14 |
| 73.68 | 73.86 | 0.18 | 5.17 |
| 73.86 | 74.28 | 0.42 | 1.13 |
| 74.28 | 74.91 | 0.63 | 5.52 |
| 74.91 | 75.14 | 0.23 | 5.94 |
| 75.14 | 75.52 | 0.38 | 4.15 |
| 75.52 | 75.76 | 0.24 | 5.70 |
"Another impressive nickel intercept for Gungnir at Lappvattnet, this time the highest-grade nickel interval drilled to date. All of our hits are less than 100 metres below surface and cover a strike length of 400 metres in the western and central parts of the Lappvattnet deposit. Looking ahead, our plan is to continue defining this high-grade nickel deposit, and the new footwall target, further to the east and at depth where it has been only sparsely drilled in the past," commented Jari Paakki, CEO.
Hole LAP22-25 was drilled in the central part of the Lappvattnet nickel resource on section 14E splitting a 50-metre gap between historic holes LAP74292 and LAP76008. The hole appears to have drilled into a thickened mineralized zone, possibly a fold hinge similar to LAP22-19 drilled on section 16E (80 metres to the east) which cut 2.35% Ni over 9.0 metres including 3.02% Ni over 5.66 metres starting at a down-hole depth of 66.0 metres (see news release dated October 18, 2022). The nickel intercept in LAP22-25 (1.49% Ni over 18.28 metres from 57.72 to 76.0 metres) occurs below a 4-metre jack-straw textured peridotite unit. It consists of an upper disseminated sulphide interval hosted in sedimentary gneisses from 57.72 metres and a lower, high-grade massive and semi-massive sulphide zone (4.04% Ni over 5.76 metres) from 70.0 metres down-hole.
Notable, previously reported near-surface, high-grade nickel intersections drilled by Gungnir at Lappvattnet include: 3.19% Nickel over 4.25 metres within a 10.4-metre interval grading 1.51% Nickel in hole LAP21-02 (240 metres west of LAP22-25); 2.62% Nickel over 5.65 metres within a 14.0-metre interval grading 1.40% Nickel in hole LAP21-05 (200 metres west of LAP22-25); and 1.74% Nickel over 10.00 metres in hole LAP21-13 (260 metres west of LAP22-25).
See news releases dated November 15 and December 1, 2022 for drill plan map, long section (with hole LAP22-25 highlighted), a table of all 2021/2022 drill hole co-ordinates, and details on the new footwall target.
Further results from holes drilled in the central part of Lappvattnet (12 drill holes) are expected to be reported in January and into early February 2023. Drilling is part of the systematic program at Lappvattnet with the plan of upgrading and expanding the existing resource following general recommendations outlined in the 2020 Technical Report (see reference below). Complete 2022 results will be collectively tabulated once all results are received. To date, the Company has drilled a total of 5,435 metres in 45 holes in 2021 and 2022.
Lengths noted are core length; true width has not been determined as structural interpretations are on-going. Core was logged and tagged for sampling at the Company's logging facility in Lycksele, Sweden, then shipped to ALS Minerals' Core Services Laboratory in Mala, Sweden. Core was sawed on site in Mala by ALS staff and prepped sample material was sent to ALS's Lab in Ireland. Core was analyzed for multi-elements using code ME-MS41, CuOG46 analysis for >10000 ppm Cu, NiOG46 analysis for >10000 ppm Ni, and Pt, Pd, and Au were analyzed using fire assay method PGM-ICP27. Blanks, certified standards and duplicates are routinely included in sample batches for quality assurance and control.
Nickel Resources
Gungnir's nickel sulphide resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the Company updated both resources which collectively total 177 million pounds of nickel. The properties are accessible year-round with good transportation and industrial infrastructure including shipping facilities and are located about an hour drive from Boliden's mill complex.
- Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5 million kg) of nickel.
- Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70 million kg) of nickel.
The NI 43-101 Technical Report entitled "TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET DEPOSITS, NORTHERN SWEDEN" was prepared by Reddick Consulting Inc. Qualified Persons are John Reddick, M.Sc., P.Geo., and Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November 17, 2020.
The technical information in this news release has been prepared, verified and approved by Jari Paakki, P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.
About Gungnir Resources
Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V, ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir's assets include two nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, both with updated nickel resources, and the Knaften project which hosts a developing intrusion-hosted gold system, and VMS (zinc-copper) and copper-nickel targets, all of which are open for expansion and further discovery. The Company has also recently added the Hemberget property to its Swedish Property Portfolio which covers an 11 km long gabbro-ultramafic intrusion, a greenfield copper-nickel target. Further information about the Company and its properties may be found at www.gungnirresources.com or at www.sedar.com.
On behalf of the Board,
Jari Paakki, CEO and Director
For further information contact:
Head Office/Investor Relations
Phone: +1-604-683-0484
Jari Paakki, CEO
Email: jpaakki@eastlink.ca
Chris Robbins, CFO
Email: robbinscr@shaw.ca
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Information
Certain statements in this news release may constitute "forward-looking information" within the meaning of applicable securities laws (also known as forward-looking statements). Forward-looking information involves known and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or industry results, to be materially different from any future results, performance or achievements or industry results expressed or implied by such forward-looking information. Forward-looking information generally can be identified by the use of terms and phrases such as "anticipate", "believe", "could", "estimate", "expect", "feel", "intend", "may", "plan", "predict", "project", "subject to", "will", "would", and similar terms and phrases, including references to assumptions. Some of the specific forward-looking information in this news release includes, but is not limited to, statements with respect to: plans to continue defining certain parts of the Lappvattnet deposit and the timing thereof; the possible structure of any mineralized zones; the receipt of assay results and timing of reports relating to same; and plans for advancement of its properties and the timing thereof.
Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including, without limitation: expectations of expanding and defining the existing resources are reasonable and possible; Gungnir will be able to receive and report assay results as expected; access to the resource will remain available; transportation and infrastructure will remain available as anticipated; the COVID-19 pandemic impact on the Canadian and global economy and Gungnir's business, and the extent and duration of such impact; no change to laws or regulations that negatively affect Gungnir's business; there will be a demand for Gungnir's services and products in the future; Gungnir will be able to operate its business as planned; Gungnir will be able to access capital markets on and successfully complete financings on terms it determines to be reasonable; and Gungnir's plans for future exploration and development of its properties is reasonable and will be possible within the anticipated timelines. Although the forward-looking information contained in this news release is based upon what Gungnir believes to be reasonable assumptions, it cannot assure investors that actual results will be consistent with such information.
Forward-looking information is provided for the purpose of presenting information about management's current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. Forward-looking information involves significant risks and uncertainties and should not be read as a guarantee of future performance or results as actual results may differ materially from those expressed or implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related to: expectations related to upgrading and expanding existing resources may not be accurate in part or at all; no certainty that any economically viable mineral deposit will be located on Gungnir's properties; that Gungnir may not be able to complete its planned drilling as anticipated; the impacts of the COVID-19 pandemic; the impacts of war and/or other international conflicts; ability to access capital markets and complete successful financings on terms Gungnir determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of required licenses, permits and approvals; and resource estimates may not be accurate and may differ significantly from actual mineral resources. Management believes that the expectations reflected in the forward-looking information contained herein are based upon reasonable assumptions and information currently available; however, management can give no assurance that actual results will be consistent with such forward-looking information. The forward-looking information contained this news release is expressly qualified in its entirety by this cautionary statement. Forward-looking information reflects management's current beliefs and is based on information currently available to Gungnir. The forward-looking information is stated as of the date of this news release and Gungnir assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law.
SOURCE: Gungnir Resources Inc.
View source version on accesswire.com:
https://www.accesswire.com/733879/404-Nickel-Over-576-Metres-for-Gungnir-at-Lappvattnet-Highest-Grade-Nickel-Intercept-Drilled-to-Date
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.
About ACCESS Newswire
Subscribe to releases from ACCESS Newswire
Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from ACCESS Newswire
TIS, EuroFinance Study Finds Corporate Treasurers Actively Evaluating AI, But Hesitant to Adopt It28.7.2026 15:00:00 CEST | Press release
The EuroFinance Deep Dive, supported by Treasury Intelligence Solutions (TIS), interviewed and surveyed corporate treasury leaders, finding that while they see AI as a powerful tool for cash forecasting, multiple concerns are deterring them from adopting it - for now. BERLIN, DE / ACCESS Newswire / July 28, 2026 / Treasury Intelligence Solutions (TIS), a best-in-class solution for payments and cash management, partnered with the research and trade association EuroFinance, in a research initiative that discovered nearly half of leading corporate finance teams are considering the use of artificial intelligence in cash forecasting - but just as many are holding off because of concerns over the technology. The EuroFinance Deep Dive, AI in Treasury: Accuracy, Intelligence and the Future of Cash Forecasting, brings together proprietary research, survey data, and perspectives from treasury leaders at Microsoft, Siemens Energy and other companies to assess where AI is creating value and where
CHAR Tech Provide Update on GazoTech's Bio-Methane Provence Project28.7.2026 14:00:00 CEST | Press release
TORONTO, ON / ACCESS Newswire / July 28, 2026 / (TSXV:YES)(OTC PINK:CTRNF)(FSE:68K) GazoTech's lead project, Bio-Méthane Provence ("BMP"), an industrial-scale HTP project in France developed under the CHAR Tech / GazoTech collaboration, has successfully concluded its CNDP-supervised voluntary public consultation, with a clear majority of opinions supporting the project BMP is redeveloping the site of a former 600 MW coal-fired power plant in Gardanne, France, converting legacy fossil infrastructure into renewable energy production Once operational, BMP is expected to process 115,000 tonnes of recovered wood annually, producing 230 GWh (828,000 GJ) of RNG plus 12,000 tonnes of biocarbon, targeting commercial operations in H2 2029 CHAR Technologies Ltd. ("CHAR Tech" or "the Company"), a leader in sustainable biomass energy solutions, today provided an update on the Bio-Méthane Provence ("BMP") project in Gardanne, France, an industrial-scale High-Temperature Pyrolysis ("HTP") project bei
Giatec Completes Its First International MixPilot Fleet Roll-Out with Heidelberg Materials UK28.7.2026 11:00:00 CEST | Press release
Following a successful trial validating MixPilot in a new market, across an expanded range of truck types and slump measurement standards, Giatec and Heidelberg Materials sign a binding agreement to scale MixPilot across the Heidelberg Materials UK fleet. OTTAWA, ON / ACCESS Newswire / July 28, 2026 / Giatec, a global leader in digital concrete technology platforms, today announced that Giatec and Heidelberg Materials, one of the world's largest integrated manufacturers of heavy building materials and solutions, have scaled MixPilot across Heidelberg Materials' UK concrete operations. MixPilot was selected on the strength of two factors: superior slump accuracy, validated against other systems under real operating conditions, and driver adoption, with the superior app interface becoming a key catalyst for fleet-wide buy-in. "MixPilot delivered something simple but rare: data our team could trust from day one," said Fabrice Arriordaz, Regional Operations Manager, North Concrete, Heidelb
LiberNovo Omni SE, Omni Pro and Maxis Enter Final Week of Early Bird Launch Pricing24.7.2026 09:00:00 CEST | Press release
HONG KONG, HK / ACCESS Newswire / July 24, 2026 / Seven days is what remains of LiberNovo's 2026 launch pricing. Across the EU and UK, Omni SE, Omni Pro, and the Maxis series hold their early bird prices until July 31, and the window closes there. The whole lineup is built around dynamic ergonomics: the support system links the neck support, backrest, armrests, and seat, so everything moves together as you shift, lean, and recline. The chair follows the movement; you get on with the work. A quick way to choose Omni SE: the simplest build in the lineup. No motor and no battery; you set the lumbar depth by hand and the automatic support does the rest. Solid dynamic ergonomics at the friendlier price. Better Comfort, Simplified. Omni Pro: the premium chair in the lineup. Motorized lumbar adjustment and the OmniStretch guided back stretch at the press of a button, plus Active Airflow ventilation built into the seat for long days and warm rooms, an aluminum base, and Danish Gabriel fabric.
2026 Fields Medals Awarded to Four of World's Top Mathematicians23.7.2026 16:45:00 CEST | Press release
The award, nicknamed the Nobel Prize of mathematics, recognizes outstanding achievement - and the promise of future achievement - by mathematicians under 40. PHILADELPHIA, PA / ACCESS Newswire / July 23, 2026 / During today's opening ceremony at the International Congress of Mathematicians (ICM) in Philadelphia, the International Mathematical Union (IMU) announced the recipients of the 2026 Fields Medals. This year's prizes went to four of the world's top mathematicians: Chinese mathematician Yu Deng of the University of Chicago; American mathematician John Pardon of Stony Brook University in New York; Canadian mathematician Jacob Tsimerman of the University of Toronto; and Chinese mathematician Hong Wang of New York University and France's Institut des Hautes Études Scientifiques (IHES). The Fields Medal is often described as the Nobel Prize of mathematics due to its prestige. Awarded every four years to two to four mathematicians under the age of 40, the medal recognizes outstanding
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom
