ACCESS Newswire

Gungnir Resources Inc.

4.1.2023 14:04:15 CET | ACCESS Newswire | Press release

Share
4.04% Nickel Over 5.76 Metres for Gungnir at Lappvattnet; Highest Grade Nickel Intercept Drilled to Date

SURREY, BC / ACCESSWIRE / January 4, 2023 / Gungnir Resources Inc. (TSXV:GUG)(OTC PINK:ASWRF) ("Gungnir" or the "Company") is very pleased to report the highest-grade nickel intercept drilled to date at the Company's Lappvattnet nickel deposit in northern Sweden. Hole LAP22-25 drilled 4.04% Ni over 5.76 metres within a broader interval of 1.49% Ni over 18.28 metres starting at a down-hole depth of 57.72 metres. Click link to view drill core (see photos).

Table of individual, consecutive assays for the 5.76 metre high-grade nickel interval in hole LAP22-25 (70.0 to 75.76 metres):

From (m)To (m)Length (m)Ni %
70.0070.510.514.93
70.5171.200.693.73
71.2072.000.802.87
72.0072.860.863.17
72.8673.200.347.18
73.2073.680.483.14
73.6873.860.185.17
73.8674.280.421.13
74.2874.910.635.52
74.9175.140.235.94
75.1475.520.384.15
75.5275.760.245.70

"Another impressive nickel intercept for Gungnir at Lappvattnet, this time the highest-grade nickel interval drilled to date. All of our hits are less than 100 metres below surface and cover a strike length of 400 metres in the western and central parts of the Lappvattnet deposit. Looking ahead, our plan is to continue defining this high-grade nickel deposit, and the new footwall target, further to the east and at depth where it has been only sparsely drilled in the past," commented Jari Paakki, CEO.

Hole LAP22-25 was drilled in the central part of the Lappvattnet nickel resource on section 14E splitting a 50-metre gap between historic holes LAP74292 and LAP76008. The hole appears to have drilled into a thickened mineralized zone, possibly a fold hinge similar to LAP22-19 drilled on section 16E (80 metres to the east) which cut 2.35% Ni over 9.0 metres including 3.02% Ni over 5.66 metres starting at a down-hole depth of 66.0 metres (see news release dated October 18, 2022). The nickel intercept in LAP22-25 (1.49% Ni over 18.28 metres from 57.72 to 76.0 metres) occurs below a 4-metre jack-straw textured peridotite unit. It consists of an upper disseminated sulphide interval hosted in sedimentary gneisses from 57.72 metres and a lower, high-grade massive and semi-massive sulphide zone (4.04% Ni over 5.76 metres) from 70.0 metres down-hole.

Notable, previously reported near-surface, high-grade nickel intersections drilled by Gungnir at Lappvattnet include: 3.19% Nickel over 4.25 metres within a 10.4-metre interval grading 1.51% Nickel in hole LAP21-02 (240 metres west of LAP22-25); 2.62% Nickel over 5.65 metres within a 14.0-metre interval grading 1.40% Nickel in hole LAP21-05 (200 metres west of LAP22-25); and 1.74% Nickel over 10.00 metres in hole LAP21-13 (260 metres west of LAP22-25).

See news releases dated November 15 and December 1, 2022 for drill plan map, long section (with hole LAP22-25 highlighted), a table of all 2021/2022 drill hole co-ordinates, and details on the new footwall target.

Further results from holes drilled in the central part of Lappvattnet (12 drill holes) are expected to be reported in January and into early February 2023. Drilling is part of the systematic program at Lappvattnet with the plan of upgrading and expanding the existing resource following general recommendations outlined in the 2020 Technical Report (see reference below). Complete 2022 results will be collectively tabulated once all results are received. To date, the Company has drilled a total of 5,435 metres in 45 holes in 2021 and 2022.

Lengths noted are core length; true width has not been determined as structural interpretations are on-going. Core was logged and tagged for sampling at the Company's logging facility in Lycksele, Sweden, then shipped to ALS Minerals' Core Services Laboratory in Mala, Sweden. Core was sawed on site in Mala by ALS staff and prepped sample material was sent to ALS's Lab in Ireland. Core was analyzed for multi-elements using code ME-MS41, CuOG46 analysis for >10000 ppm Cu, NiOG46 analysis for >10000 ppm Ni, and Pt, Pd, and Au were analyzed using fire assay method PGM-ICP27. Blanks, certified standards and duplicates are routinely included in sample batches for quality assurance and control.

Nickel Resources
Gungnir's nickel sulphide resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the Company updated both resources which collectively total 177 million pounds of nickel. The properties are accessible year-round with good transportation and industrial infrastructure including shipping facilities and are located about an hour drive from Boliden's mill complex.

  • Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5 million kg) of nickel.
  • Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70 million kg) of nickel.

The NI 43-101 Technical Report entitled "TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET DEPOSITS, NORTHERN SWEDEN" was prepared by Reddick Consulting Inc. Qualified Persons are John Reddick, M.Sc., P.Geo., and Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November 17, 2020.

The technical information in this news release has been prepared, verified and approved by Jari Paakki, P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.

About Gungnir Resources
Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V, ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir's assets include two nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, both with updated nickel resources, and the Knaften project which hosts a developing intrusion-hosted gold system, and VMS (zinc-copper) and copper-nickel targets, all of which are open for expansion and further discovery. The Company has also recently added the Hemberget property to its Swedish Property Portfolio which covers an 11 km long gabbro-ultramafic intrusion, a greenfield copper-nickel target. Further information about the Company and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,
Jari Paakki, CEO and Director

For further information contact:
Head Office/Investor Relations
Phone: +1-604-683-0484

Jari Paakki, CEO
Email: jpaakki@eastlink.ca

Chris Robbins, CFO
Email: robbinscr@shaw.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute "forward-looking information" within the meaning of applicable securities laws (also known as forward-looking statements). Forward-looking information involves known and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or industry results, to be materially different from any future results, performance or achievements or industry results expressed or implied by such forward-looking information. Forward-looking information generally can be identified by the use of terms and phrases such as "anticipate", "believe", "could", "estimate", "expect", "feel", "intend", "may", "plan", "predict", "project", "subject to", "will", "would", and similar terms and phrases, including references to assumptions. Some of the specific forward-looking information in this news release includes, but is not limited to, statements with respect to: plans to continue defining certain parts of the Lappvattnet deposit and the timing thereof; the possible structure of any mineralized zones; the receipt of assay results and timing of reports relating to same; and plans for advancement of its properties and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including, without limitation: expectations of expanding and defining the existing resources are reasonable and possible; Gungnir will be able to receive and report assay results as expected; access to the resource will remain available; transportation and infrastructure will remain available as anticipated; the COVID-19 pandemic impact on the Canadian and global economy and Gungnir's business, and the extent and duration of such impact; no change to laws or regulations that negatively affect Gungnir's business; there will be a demand for Gungnir's services and products in the future; Gungnir will be able to operate its business as planned; Gungnir will be able to access capital markets on and successfully complete financings on terms it determines to be reasonable; and Gungnir's plans for future exploration and development of its properties is reasonable and will be possible within the anticipated timelines. Although the forward-looking information contained in this news release is based upon what Gungnir believes to be reasonable assumptions, it cannot assure investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management's current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. Forward-looking information involves significant risks and uncertainties and should not be read as a guarantee of future performance or results as actual results may differ materially from those expressed or implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related to: expectations related to upgrading and expanding existing resources may not be accurate in part or at all; no certainty that any economically viable mineral deposit will be located on Gungnir's properties; that Gungnir may not be able to complete its planned drilling as anticipated; the impacts of the COVID-19 pandemic; the impacts of war and/or other international conflicts; ability to access capital markets and complete successful financings on terms Gungnir determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of required licenses, permits and approvals; and resource estimates may not be accurate and may differ significantly from actual mineral resources. Management believes that the expectations reflected in the forward-looking information contained herein are based upon reasonable assumptions and information currently available; however, management can give no assurance that actual results will be consistent with such forward-looking information. The forward-looking information contained this news release is expressly qualified in its entirety by this cautionary statement. Forward-looking information reflects management's current beliefs and is based on information currently available to Gungnir. The forward-looking information is stated as of the date of this news release and Gungnir assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law.

SOURCE: Gungnir Resources Inc.



View source version on accesswire.com:
https://www.accesswire.com/733879/404-Nickel-Over-576-Metres-for-Gungnir-at-Lappvattnet-Highest-Grade-Nickel-Intercept-Drilled-to-Date

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

Fermi Names Lee McIntire as Chief Executive Officer12.8.2026 22:01:00 CEST | Press release

Engineering executive with more than 40 years of experience building and operating complex global industrial and governmental projects at Bechtel, CH2M Hill, and TerraPower DALLAS, TX / ACCESS Newswire / August 12, 2026 / Fermi Inc. (NASDAQ:FRMI)(LSE:FRMI), operating as Fermi America™ ("Fermi" or the "Company"), today named Lee McIntire Chief Executive Officer, effective Tuesday, August 11, 2026. McIntire has served as an independent director on Fermi's Board since September 2025. "Fermi's next chapter is a construction and power delivery story, and we believe Lee is the ideal executive to lead Fermi through that process," said Marius Haas, Chairman of the Board of Fermi Inc. "The job now is to build on schedule, on budget, and safely. Lee has spent 40 years delivering exactly this kind of large, complex project. He also knows Fermi from the inside, having served on our board through our latest period of growth, and he brings a reputation for integrity that Fermi's customers, employees

Model ML Secures Investment From HSBC Asset Management to Scale Its Agentic Operating System for Financial Services12.8.2026 18:05:00 CEST | Press release

The investment reflects growing demand for specialist AI platforms designed specifically for financial services. LONDON, UK / ACCESS Newswire / August 12, 2026 / Model ML has announced an investment from HSBC Asset Management, made through its flagship Venture Capital (VC) strategy. The funding will support Model ML's growth as the focus of enterprise AI shifts from individual models to the systems required to implement them. Model ML's platform is purpose-built for financial services. The company works with many of the world's leading banks, asset managers and advisory firms, helping to automate complex workflows across research, due diligence, financial analysis and client-ready document creation, while maintaining governance, accuracy and consistency. Its model-agnostic approach routes each task to the AI model best suited to the job, enabling firms to benefit from advances across the AI ecosystem without changing the way teams work. The company has grown rapidly since launching les

GoodData.AI Cuts BI Migration From 18 Months to Weeks for DACH Enterprises, Opening the Fastest Route to Production AI12.8.2026 16:20:00 CEST | Press release

With around 80 percent of migration functions automated, enterprises skip the multi-year consulting engagement that has kept them on aging BI platforms. SAN FRANCISCO, CA / ACCESS Newswire / August 12, 2026 / GoodData.AI today announced its AI-driven BI migration offering for enterprises across Germany, Austria, and Switzerland, delivered with German-language support and a regional team. Migration agents are able to move organizations off Tableau, Power BI, Qlik, Looker, MicroStrategy, and any other BI platform in days to weeks instead of the 12 to 18 months that a manual rebuild takes. Up to 80 percent of the migration work is automated, which cuts the cost along with the timeline, and GoodData engineers review every change before the customer approves it. It follows GoodData.AI's expansion in the region earlier this year and its work with DATEV, one of Germany's most recognized enterprise software companies. "Every migration conversation in Germany starts with the same question: will

Karbon-X and Core Energy Sign Letter of Intent to Explore Commercial EV Charging Infrastructure in South America12.8.2026 15:00:00 CEST | Press release

Collaboration provides Karbon-X with an opportunity to apply its project development and carbon market capabilities to commercial transportation infrastructure in the Southern Cone. CALGARY, AB / ACCESS Newswire / August 12, 2026 / Karbon-X Corp. (OTCQB:KARX) ("Karbon-X" or the "Company"), a vertically integrated climate solutions company, today announced that it has signed a non-binding Letter of Intent ("LOI") with Core Energy ("Core Energy"), to explore a potential commercial electric vehicle ("EV") fast-charging infrastructure project in South America. The proposed collaboration is intended to bring together Core Energy's local project development capabilities and Karbon-X's experience evaluating and developing climate projects and carbon market opportunities. During the initial exploratory phase, the companies expect to jointly assess the project's preliminary technical and commercial considerations and prepare a Concept Note outlining the proposed infrastructure model and its pot

Fermi and Hillcore Energy Capital Announce 2.6 Gigawatt Power Strategic Alliance for Project Matador11.8.2026 23:15:00 CEST | Press release

Doubles Fermi power to market to 4.8 gigawatts (GW) over the next ~30 months Build-Own-Operate-Transfer structure accelerates one of America's largest AI campus power programs - with no capital outlay by Fermi DALLAS, TX / ACCESS Newswire / August 11, 2026 / Fermi Inc. (NASDAQ:FRMI)(LSE:FRMI), operating as Fermi America™ ("Fermi" or the "Company"), announced the execution of a framework agreement with Hillcore Energy Capital Corporation ("Hillcore") under which Hillcore will finance, build, own and operate the Hillcore Power Center, an approximately 2.6 GW power complex at Fermi's Project Matador campus in Carson County, Texas, under a Build-Own-Operate-Transfer (BOOT) structure. The Hillcore Power Center will comprise approximately 2.5 GW of natural gas-fired generation, developed in phases, together with approximately 100 megawatts (MW) of solar generation and battery energy storage. Construction of the first power block, approximately 350 MW, will begin on execution of definitive ag

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye