ACCESS Newswire

Gungnir Resources Inc.

4.1.2023 14:04:15 CET | ACCESS Newswire | Press release

Share
4.04% Nickel Over 5.76 Metres for Gungnir at Lappvattnet; Highest Grade Nickel Intercept Drilled to Date

SURREY, BC / ACCESSWIRE / January 4, 2023 / Gungnir Resources Inc. (TSXV:GUG)(OTC PINK:ASWRF) ("Gungnir" or the "Company") is very pleased to report the highest-grade nickel intercept drilled to date at the Company's Lappvattnet nickel deposit in northern Sweden. Hole LAP22-25 drilled 4.04% Ni over 5.76 metres within a broader interval of 1.49% Ni over 18.28 metres starting at a down-hole depth of 57.72 metres. Click link to view drill core (see photos).

Table of individual, consecutive assays for the 5.76 metre high-grade nickel interval in hole LAP22-25 (70.0 to 75.76 metres):

From (m)To (m)Length (m)Ni %
70.0070.510.514.93
70.5171.200.693.73
71.2072.000.802.87
72.0072.860.863.17
72.8673.200.347.18
73.2073.680.483.14
73.6873.860.185.17
73.8674.280.421.13
74.2874.910.635.52
74.9175.140.235.94
75.1475.520.384.15
75.5275.760.245.70

"Another impressive nickel intercept for Gungnir at Lappvattnet, this time the highest-grade nickel interval drilled to date. All of our hits are less than 100 metres below surface and cover a strike length of 400 metres in the western and central parts of the Lappvattnet deposit. Looking ahead, our plan is to continue defining this high-grade nickel deposit, and the new footwall target, further to the east and at depth where it has been only sparsely drilled in the past," commented Jari Paakki, CEO.

Hole LAP22-25 was drilled in the central part of the Lappvattnet nickel resource on section 14E splitting a 50-metre gap between historic holes LAP74292 and LAP76008. The hole appears to have drilled into a thickened mineralized zone, possibly a fold hinge similar to LAP22-19 drilled on section 16E (80 metres to the east) which cut 2.35% Ni over 9.0 metres including 3.02% Ni over 5.66 metres starting at a down-hole depth of 66.0 metres (see news release dated October 18, 2022). The nickel intercept in LAP22-25 (1.49% Ni over 18.28 metres from 57.72 to 76.0 metres) occurs below a 4-metre jack-straw textured peridotite unit. It consists of an upper disseminated sulphide interval hosted in sedimentary gneisses from 57.72 metres and a lower, high-grade massive and semi-massive sulphide zone (4.04% Ni over 5.76 metres) from 70.0 metres down-hole.

Notable, previously reported near-surface, high-grade nickel intersections drilled by Gungnir at Lappvattnet include: 3.19% Nickel over 4.25 metres within a 10.4-metre interval grading 1.51% Nickel in hole LAP21-02 (240 metres west of LAP22-25); 2.62% Nickel over 5.65 metres within a 14.0-metre interval grading 1.40% Nickel in hole LAP21-05 (200 metres west of LAP22-25); and 1.74% Nickel over 10.00 metres in hole LAP21-13 (260 metres west of LAP22-25).

See news releases dated November 15 and December 1, 2022 for drill plan map, long section (with hole LAP22-25 highlighted), a table of all 2021/2022 drill hole co-ordinates, and details on the new footwall target.

Further results from holes drilled in the central part of Lappvattnet (12 drill holes) are expected to be reported in January and into early February 2023. Drilling is part of the systematic program at Lappvattnet with the plan of upgrading and expanding the existing resource following general recommendations outlined in the 2020 Technical Report (see reference below). Complete 2022 results will be collectively tabulated once all results are received. To date, the Company has drilled a total of 5,435 metres in 45 holes in 2021 and 2022.

Lengths noted are core length; true width has not been determined as structural interpretations are on-going. Core was logged and tagged for sampling at the Company's logging facility in Lycksele, Sweden, then shipped to ALS Minerals' Core Services Laboratory in Mala, Sweden. Core was sawed on site in Mala by ALS staff and prepped sample material was sent to ALS's Lab in Ireland. Core was analyzed for multi-elements using code ME-MS41, CuOG46 analysis for >10000 ppm Cu, NiOG46 analysis for >10000 ppm Ni, and Pt, Pd, and Au were analyzed using fire assay method PGM-ICP27. Blanks, certified standards and duplicates are routinely included in sample batches for quality assurance and control.

Nickel Resources
Gungnir's nickel sulphide resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the Company updated both resources which collectively total 177 million pounds of nickel. The properties are accessible year-round with good transportation and industrial infrastructure including shipping facilities and are located about an hour drive from Boliden's mill complex.

  • Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5 million kg) of nickel.
  • Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70 million kg) of nickel.

The NI 43-101 Technical Report entitled "TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET DEPOSITS, NORTHERN SWEDEN" was prepared by Reddick Consulting Inc. Qualified Persons are John Reddick, M.Sc., P.Geo., and Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November 17, 2020.

The technical information in this news release has been prepared, verified and approved by Jari Paakki, P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.

About Gungnir Resources
Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V, ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir's assets include two nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, both with updated nickel resources, and the Knaften project which hosts a developing intrusion-hosted gold system, and VMS (zinc-copper) and copper-nickel targets, all of which are open for expansion and further discovery. The Company has also recently added the Hemberget property to its Swedish Property Portfolio which covers an 11 km long gabbro-ultramafic intrusion, a greenfield copper-nickel target. Further information about the Company and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,
Jari Paakki, CEO and Director

For further information contact:
Head Office/Investor Relations
Phone: +1-604-683-0484

Jari Paakki, CEO
Email: jpaakki@eastlink.ca

Chris Robbins, CFO
Email: robbinscr@shaw.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute "forward-looking information" within the meaning of applicable securities laws (also known as forward-looking statements). Forward-looking information involves known and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or industry results, to be materially different from any future results, performance or achievements or industry results expressed or implied by such forward-looking information. Forward-looking information generally can be identified by the use of terms and phrases such as "anticipate", "believe", "could", "estimate", "expect", "feel", "intend", "may", "plan", "predict", "project", "subject to", "will", "would", and similar terms and phrases, including references to assumptions. Some of the specific forward-looking information in this news release includes, but is not limited to, statements with respect to: plans to continue defining certain parts of the Lappvattnet deposit and the timing thereof; the possible structure of any mineralized zones; the receipt of assay results and timing of reports relating to same; and plans for advancement of its properties and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including, without limitation: expectations of expanding and defining the existing resources are reasonable and possible; Gungnir will be able to receive and report assay results as expected; access to the resource will remain available; transportation and infrastructure will remain available as anticipated; the COVID-19 pandemic impact on the Canadian and global economy and Gungnir's business, and the extent and duration of such impact; no change to laws or regulations that negatively affect Gungnir's business; there will be a demand for Gungnir's services and products in the future; Gungnir will be able to operate its business as planned; Gungnir will be able to access capital markets on and successfully complete financings on terms it determines to be reasonable; and Gungnir's plans for future exploration and development of its properties is reasonable and will be possible within the anticipated timelines. Although the forward-looking information contained in this news release is based upon what Gungnir believes to be reasonable assumptions, it cannot assure investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management's current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. Forward-looking information involves significant risks and uncertainties and should not be read as a guarantee of future performance or results as actual results may differ materially from those expressed or implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related to: expectations related to upgrading and expanding existing resources may not be accurate in part or at all; no certainty that any economically viable mineral deposit will be located on Gungnir's properties; that Gungnir may not be able to complete its planned drilling as anticipated; the impacts of the COVID-19 pandemic; the impacts of war and/or other international conflicts; ability to access capital markets and complete successful financings on terms Gungnir determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of required licenses, permits and approvals; and resource estimates may not be accurate and may differ significantly from actual mineral resources. Management believes that the expectations reflected in the forward-looking information contained herein are based upon reasonable assumptions and information currently available; however, management can give no assurance that actual results will be consistent with such forward-looking information. The forward-looking information contained this news release is expressly qualified in its entirety by this cautionary statement. Forward-looking information reflects management's current beliefs and is based on information currently available to Gungnir. The forward-looking information is stated as of the date of this news release and Gungnir assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law.

SOURCE: Gungnir Resources Inc.



View source version on accesswire.com:
https://www.accesswire.com/733879/404-Nickel-Over-576-Metres-for-Gungnir-at-Lappvattnet-Highest-Grade-Nickel-Intercept-Drilled-to-Date

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

Caldwell Strengthens Human Resources Practice with Addition of Ali Palmer as Partner17.9.2026 14:50:00 CEST | Press release

TORONTO, ON AND LONDON, UK / ACCESS Newswire / September 17, 2026 / Retained executive search firm Caldwell (TSX:CWL)(OTCQX:CWLPF) today announced the addition of Ali Palmer as a Partner in the firm's Human Resources Practice. Based in London, Palmer advises boards, chief executive officers and chief people officers on the recruitment of senior human resources leaders, helping organizations build leadership teams that enable growth, transformation and long-term performance. Ali Palmer, Partner in Caldwell's Human Resources Practice. With more than 20 years of executive search and leadership advisory experience, Palmer partners with listed companies, private equity-backed businesses and privately held organizations across a broad range of sectors, with particular expertise in consumer, retail, industrial, financial services, pharmaceutical and technology. She leads executive search assignments across the full human resources function, from chief people officers and chief human resources

Freedom Holding Corp. Backs the FIDE World Championship Match 2026 as General Partner17.9.2026 14:00:00 CEST | Press release

NEW YORK CITY, NY / ACCESS Newswire / September 17, 2026 / Freedom Holding Corp. (NASDAQ:FRHC) is the General Partner of the Salesforce FIDE World Championship Match 2026, the International Chess Federation (FIDE) and Freedom announced today. General Partner is the highest partnership tier of the World Championship. The Match runs from 22 November to 12 December. The Opening Ceremony takes place on 22 November at the Palais des Nations in Geneva. World Champion Gukesh Dommaraju of India defends his title against Javokhir Sindarov of Uzbekistan over 14 classical games. Both players will be twenty at the start of the Match, the youngest title contest since the series began in 1886. Freedom has been a strategic partner of FIDE since 2023. The group is a regular sponsor of the FIDE World Rapid and Blitz Championships and was the title sponsor of the 2024 FIDE World Corporate Chess Championship in New York. Under a 2026 cooperation agreement, Freedom also funds FIDE tournaments, training ce

Bayer to Present How it Rebuilt Global Planning with OMP at Gartner Supply Chain Planning Summit 202617.9.2026 13:52:00 CEST | Press release

ANTWERPEN, BE / ACCESS Newswire / September 17, 2026 / OMP, a leading provider of supply chain planning solutions, invites attendees of the Gartner Supply Chain Planning Summit 2026 in London to its joint session with multinational Bayer. Representatives of the Pharmaceutical division and the global IT department will show what it took to rebuild global planning around faster, higher-quality decisions, how Unison Planning™ supports that at scale, and where AI fits in. Rebuilding planning at Bayer's scale Bayer treated its move to Unison Planning™ as more than a system replacement, rebuilding processes, master data, and ways of working across its global manufacturing and affiliate network. During their Gartner session, Mirja Meyer, Principal Product Manager and Program Lead IT at Bayer, and Karsten Hahm, Program Lead OMP Implementation at Bayer Pharmaceuticals, will cover:What adoption actually tookWhat changed in decision speed and qualityWhere AI fits on the roadmap ahead Sign up for

U.S. Polo Assn. Celebrates New Partnership with the Historic Greenwich Polo Club at the 2026 East Coast Open Presented by Audi17.9.2026 13:00:00 CEST | Press release

WEST PALM BEACH, FL / ACCESS Newswire / September 17, 2026 / U.S. Polo Assn.®, the official sports brand of the United States Polo Association (USPA), celebrated the conclusion of the 2026 East Coast Open Presented by Audi, held August 30 through September 13 at the renowned Greenwich Polo Club in Greenwich, Connecticut, a celebrated polo destination just outside New York City. As the only high-goal tournament on the East Coast during the summer season, the historic championship once again brought together elite international competition for the sport of polo. 2026 East Coast Open Presented by Audi Winners, IGEA, celebrating with tournament trophy. Photo Credit: Greenwich Polo Club The 2026 season also marked a significant milestone as U.S. Polo Assn. served as the Official Apparel Brand Sponsor of Greenwich Polo Club for the first time. The new partnership connected one of the world's most recognized sports brands with one of polo's most iconic venues, further strengthening the brand'

GA-ASI Mojave First UAS To Complete Battlefield Short Field Ops16.9.2026 19:30:00 CEST | Press release

Short Takeoff and Landing Aircraft Validates Austere Field Capabilities SAN DIEGO, CA / ACCESS Newswire / September 16, 2026 / General Atomics Aeronautical Systems (GA-ASI) and Hanwha Aerospace have completed the first-ever flight operations from a simulated battlefield by a medium altitude, long endurance uncrewed aircraft. The partners proved that the Mojave Short Takeoff and Landing aircraft, or Mojave STOL, could land at a tank and artillery live-fire range during simulated combat conditions and then take off again to continue the mission. "This demonstration showcased Mojave's ability to perform tactical missions that are representative of real battlefield requirements and challenges," said GA-ASI CEO Linden Blue. "Whether the user needs contested and austere battlefield operations, ISR, weapons delivery, Air-Launched Effects deployment, troop resupply, counter-UAS, or missions requiring short and unimproved roads for takeoff, our aircraft answer the bell." "This demonstration mar

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye