ACCESS Newswire

Gungnir Resources Inc.

15.11.2022 13:03:07 CET | ACCESS Newswire | Press release

Share
More Massive Sulphides for Gungnir at Lappvattnet Nickel Deposit

SURREY, BC / ACCESSWIRE / November 15, 2022 / Gungnir Resources Inc. (TSXV:GUG)(OTC PINK:ASWRF) ("Gungnir" or the "Company") is pleased to report further, near-surface massive sulphide drill intersections at the Company's Lappvattnet nickel deposit in northern Sweden. Highlighted holes include LAP22-25 and LAP22-23 which were drilled 80 metres west and east, respectively, of hole LAP22-19 which cut 9.0 metres of 2.35% Ni including 5.66 metres of 3.02% Ni in the central part of the Lappvattnet resource (news release dated October 18, 2022). Please click link for long section and drill core photos (see Figure 1).

To date, the Company has drilled 30 holes for total of 4,240 metres of our planned 2022/23 program with the goal of upgrading and expanding the existing resource, focused on defining further high-grade nickel shoots, as well as initial scout drilling north of Lappvattnet. The Company is awaiting a large number of assays (more than 500) which are expected this quarter and into the first quarter of 2023. Once results are received and geological modelling is completed, plans for more drilling will be outlined. The potential target area for drilling is shown in slide 3 in the accompanying figures (shaded in grey) plus potential future drilling further along strike and down-plunge to the east (large grey arrows).

A total of 16 holes (LAP22-16 to -31) were completed in the central part of the Lappvattnet deposit within the outlined block shown in Figure 1. Drilling was done along section lines spaced 20 metres apart (Sections 14 to 18E) with generally two holes collared at different angles from a single drill set-up to minimize our drilling footprint. Fifteen of sixteen holes intersected sulphide mineralization ranging from core lengths of less than 5 metres to 25 metres. With the exception of most of hole LAP22-19, all assays are pending in the central part of the main Lappvattnet deposit.

Hole LAP22-25 cut a 25-metre section of sulphide mineralization, mainly disseminated, from 51 to 76 metres downhole, including a 6-metre interval (70 to 76 metres) containing ten sections of massive sulphides below a variably mineralized peridotite unit (see accompanying core photos). Hole LAP22-23, located 160 metres to the east of LAP22-25, drilled a 14-metre interval of mainly disseminated sulphides starting within a peridotite unit at 39 metres and includes a one-metre slug of massive sulphide at 44.2 metres (accompanying core photo shows core ends from approximately the middle of this mineralization). LAP22-23 is the furthest hole drilled to the east by Gungnir.

Lengths noted are core length; true width has not been determined. Hole LAP22-25 was drilled at an azimuth of 335 degrees at location 1,741,733mE and 7,165,247mN (RT90-2.5 co-ordinates) on Section 14E The 111-metre-long hole was drilled at a dip of -75 degrees. LAP22-23, a 101-metre-long hole drilled at an azimuth of 335 degrees at a dip of -75 degrees, at location 1,741,880mE and 7,165,318mN on Section 18E.

Core was logged and tagged for sampling at the Company's logging facility in Lycksele, Sweden, then shipped to ALS Minerals' Core Services Laboratory in Mala, Sweden. Core was sawed on site in Mala by ALS staff and prepped sample material was sent to ALS's Lab in Ireland. Core was analyzed for multi-elements using code ME-MS41, CuOG46 analysis for >10000 ppm Cu, NiOG46 analysis for >10000 ppm Ni, and Pt, Pd, and Au were analyzed using fire assay method PGM-ICP27. Blanks, certified standards and duplicates are routinely included in sample batches for quality assurance and control.

Nickel Resources

Gungnir's nickel sulphide resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the Company updated both resources which collectively total 177 million pounds of nickel. The properties are accessible year-round with good transportation and industrial infrastructure including shipping facilities and are located about an hour drive from Boliden's mill complex.

  • Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5 million kg) of nickel.
  • Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70 million kg) of nickel.

The NI 43-101 Technical Report entitled "TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET DEPOSITS, NORTHERN SWEDEN" was prepared by Reddick Consulting Inc. Qualified Persons are John Reddick, M.Sc., P.Geo., and Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November 17, 2020.

The technical information in this news release has been prepared, verified and approved by Jari Paakki, P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V, ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir's assets include two nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, both with updated nickel resources, and the Knaften project which hosts a developing intrusion-hosted gold system, and VMS (zinc-copper) and copper-nickel targets, all of which are open for expansion and further discovery. The Company has also recently added the Hemberget property to its Swedish Property Portfolio which covers an 11 km long gabbro-ultramafic intrusion, a greenfield copper-nickel target. Further information about the Company and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,
Jari Paakki, CEO and Director

For further information contact:
Head Office/Investor Relations
Phone: +1-604-683-0484

Jari Paakki, CEO
Email: jpaakki@eastlink.ca

Chris Robbins, CFO
Email: robbinscr@shaw.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute "forward-looking information" within the meaning of applicable securities laws (also known as forward-looking statements). Forward-looking information involves known and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or industry results, to be materially different from any future results, performance or achievements or industry results expressed or implied by such forward-looking information. Forward-looking information generally can be identified by the use of terms and phrases such as "anticipate", "believe", "could", "estimate", "expect", "feel", "intend", "may", "plan", "predict", "project", "subject to", "will", "would", and similar terms and phrases, including references to assumptions. Some of the specific forward-looking information in this news release includes, but is not limited to, statements with respect to: expectations of upgrading and expanding the existing resource; expectations of additional high-grade nickel shoots; expectations of future resource upgrades and that new drilling and assays will be incorporated into any resource upgrade; the expected timing for receipt of assay results; planned drilling locations and expected targets; extent of drilling and quantity of drilling holes; planned 2022/2023 exploration program including anticipated drilling and the timing thereof; and Gungnir's plan for development of its properties and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including, without limitation: expectations of upgrading, thickening and expanding the existing resource are reasonable; access to the resources will remain available year-round; transportation and infrastructure will remain available as anticipated; the COVID-19 pandemic impact on the Canadian and global economy and Gungnir's business, and the extent and duration of such impact; no change to laws or regulations that negatively affect Gungnir's business; there will be a demand for Gungnir's services and products in the future; Gungnir will be able to operate its business as planned; Gungnir will be able to access capital markets on and successfully complete financings on terms it determines to be reasonable; and Gungnir's plans for future exploration and development of its properties is reasonable and will be possible within the anticipated timelines. Although the forward-looking information contained in this news release is based upon what Gungnir believes to be reasonable assumptions, it cannot assure investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management's current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. Forward-looking information involves significant risks and uncertainties and should not be read as a guarantee of future performance or results as actual results may differ materially from those expressed or implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related to: expectations related to upgrading, thickening and expanding existing resources may not be accurate in part or at all; no certainty that any economically viable mineral deposit will be located on Gungnir's properties; that Gungnir may not be able to complete its planned drilling as anticipated; the impacts of the COVID-19 pandemic; the impacts of war and/or other international conflicts; ability to access capital markets and complete successful financings on terms Gungnir determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of required licenses, permits and approvals; and resource estimates may not be accurate and may differ significantly from actual mineral resources. Management believes that the expectations reflected in the forward-looking information contained herein are based upon reasonable assumptions and information currently available; however, management can give no assurance that actual results will be consistent with such forward-looking information. The forward-looking information contained this news release is expressly qualified in its entirety by this cautionary statement. Forward-looking information reflects management's current beliefs and is based on information currently available to Gungnir. The forward-looking information is stated as of the date of this news release and Gungnir assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law.

SOURCE: Gungnir Resources Inc.



View source version on accesswire.com:
https://www.accesswire.com/725694/More-Massive-Sulphides-for-Gungnir-at-Lappvattnet-Nickel-Deposit

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

Freedom Holding Corp. Founder Timur Turlov Announces Candidacy for FIDE Deputy President29.6.2026 15:25:00 CEST | Press release

ALMATY, KAZAKHSTAN AND NEW YORK, NY / ACCESS Newswire / June 29, 2026 / Timur Turlov, President of the Kazakhstan Chess Federation and founder and majority shareholder of Freedom Holding Corp., has announced his candidacy for the position of Deputy President of the International Chess Federation (FIDE). According to Turlov, his decision to run reflects the work the Kazakhstan Chess Federation has undertaken in recent years to develop, digitize and popularize chess across the country. "My goal is to bring more stability, balance and mutual understanding to FIDE. Freedom Holding Corp., as one of Central Asia's leading fintech groups, can help the federation become more digital and technology-driven," said Timur Turlov. He added that his candidacy also reflects Kazakhstan's growing role in the international chess community. "In this sense, I represent not only myself, but also Kazakhstan - a country that is increasingly seen internationally as a reliable partner, capable of building calm

Polaris Renewable Energy Announces Results of Director Elections at Annual and Special Meeting27.6.2026 01:40:00 CEST | Press release

TORONTO, ON / ACCESS Newswire / June 26, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris" or the "Company"), is pleased to announce that all six director nominees proposed by management were elected as directors of the Company at its annual meeting of shareholders held via live video webcast today. Each director will hold office until the close of the next annual meeting of the Company's shareholders or until their successors are duly elected or appointed. The following are the voting results based on proxies received and a vote by online ballot: Director Number of Votes Percentage of Votes Votes For: Votes Withheld: Votes For: Votes Withheld: Jaime Guillen 9,351,125 220,821 97.69% 2.31% James V. Lawless 9,345,405 226,541 97.63% 2.37% Marc Murnaghan 9,355,472 216,474 97.74% 2.26% Marcela Paredes de Vásquez 9,383,074 188,872 98.03% 1.97% Catherine Fagnan 9,386,661 185,285 98.06% 1.94% Adarsh P. Mehta 9,394,433 177,513 98.15% 1.85% About Polaris Renewable Energy Inc. Polaris Ren

FINOS Announces Intent to Form OSERA, a Global Financial Services-Led Alliance for Open Source Supply-Chain Resiliency in the Era of AI26.6.2026 15:00:00 CEST | Press release

Spearheaded by Moderne and Piloted by FINOS Institutional Members, the Open Source Enterprise Resiliency Alliance Mutualizes Open Source 'Backpatching', Promotes Vendor-Neutral Industry-Wide Remediation Standards and Accelerates Evidence-Based, Compliant Open Source Consumption at Scale NEW YORK CITY, NY / ACCESS Newswire / June 26, 2026 / At the Open Source in Finance Forum, FINOS, the financial services arm of the Linux Foundation, announced its intent to form an Open Source Enterprise Resiliency Alliance (OSERA), a global, vendor-neutral, member-governed coalition to strengthen the industry's supply chain resiliency. OSERA will strengthen the open source components that underpin the sector by securing them through a vendor-neutral, upstream-aware approach and accelerating their compliant consumption at scale. The announcement follows a successful Member-only end-to-end pilot phase by Deutsche Bank, Goldman Sachs, Morgan Stanley, Royal Bank of Canada (RBC), and TD Bank Group, in whic

Hydrosat and Kazakhstan Gharysh Sapary Sign Agreement to Advance Satellite-Based Water Intelligence Across Kazakhstan and Central Asia25.6.2026 17:00:00 CEST | Press release

BRUSSELS, BE / ACCESS Newswire / June 25, 2026 / Hydrosat, the leading provider of thermal infrared satellite data and AI-powered analytics, and JSC "NC "Kazakhstan Gharysh Sapary" (JSC "NC "KGS"), Kazakhstan's national space company, announced the signing of a Joint Activity Agreement during a ceremony held in Brussels on 23 June 2026. The agreement establishes the framework for a national-scale program to digitize water resources management using satellite-based thermal analytics and AI, with the potential to expand across Central Asia. The agreement was signed as part of the state visit of the Head of State of the Republic of Kazakhstan to Belgium. During the visit, a number of strategic agreements were concluded to advance artificial intelligence, science, digital infrastructure, and space technologies, creating new opportunities for investment, joint research, technology deployment, and international cooperation. Representing Kazakhstan at the signing ceremonies were Deputy Prime

GA-ASI Adapts Ground Control Station to Fly MQ-9B25.6.2026 16:00:00 CEST | Press release

World Leader in UAS Invests in Upgrades That Ease MQ-9B Procurement SAN DIEGO, CA / ACCESS Newswire / June 25, 2026 / General Atomics Aeronautical Systems, Inc. (GA-ASI) is working to adapt its Block 30 Ground Control Stations (GCS) to fly the company's newer model MQ-9B SkyGuardian® and SeaGuardian® Remotely Piloted Aircraft. When these upgrades are complete, they will enable current users of the Block 30 system, originally designed to fly the MQ-9A Reaper®, to keep that equipment and use it to operate the more capable aircraft. Current users include the U.S. Air Force, U.S. Marine Corps, the Italian Air Force, the French Air Force, the United Arab Emirates Armed Forces, the Spanish Air Force, and the Royal Netherlands Air Force. GA-ASI developed the MQ-9B through its own internal research and development. The upgraded new aircraft required a new and more powerful GCS. The ongoing work with the Block 30 GCS now means that prospective users with existing stocks of equipment wouldn't ne

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye