ACCESS Newswire

Granite Creek Copper Ltd.

22.7.2021 14:03:11 CEST | ACCESS Newswire | Press release

Share
Granite Creek Copper Reports First Results from Phase 1 of 2021 Drill Program, Including 43.50 Meters of 1.40 % Copper Equivalent, at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / July 22, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX)(OTCQB:GCXXF) ("Granite Creek" or the "Company") is pleased to announce the first tranche of assays from Phase 1 of the Company's 2021 drilling program on its 100%-owned Carmacks project. This recently completed first phase consisted of nineteen diamond drill holes, totalling 6355 meters, focused on the existing resource area with the goals of strengthening confidence in the resource model, evaluating opportunities for resource expansion and/or upgrading the sulphide portion of Zones 1 and 2000S from an inferred to indicated resource, and evaluating continuity of mineralization in Zone 13 (Figure 1).

Granite Creek President & CEO, Tim Johnson, commented, "The Company is extremely pleased with the progress of 2021 exploration program at Carmacks. A Phase 3 drilling program is under development and projected to commence in mid-August of this year. The addition of this third stage would expand the overall 2021 campaign to include a total of 10,000 meters of diamond drilling as well as 3000m of reverse circulation drilling. We expect this program will significantly expand the total contained metal on the project, resulting in a substantially and form the basis for a new Preliminary Economic Assessment."

Table 1 - Highlights from first tranche of 2021 Diamond Drill Assays at the Carmacks Project

Drillhole

From

(m)

To

(m)

Length*

(m)

Cu

(%)

Mo

(%)

Au

(g/t)

Ag

(g/t)

CuEq** (%)

Zone

CRM21-004

323.50

367.00

43.50

1.12

0.03

0.20

3.41

1.40

Zone 1

Including

338.50

367.00

28.50

1.57

0.04

0.29

4.53

1.96

and including

352.00†

367.00

15.00

1.80

0.07

0.33

4.81

2.31

CRM21-007

222.52

223.70

4.08

0.91

0.01

0.19

6.32

1.13

CRM21-010

450.00

513.40

63.40

0.27

BDL

0.08

1.31

0.35

Including

450.00

482.25

32.25

0.30

BDL

0.08

1.41

0.39

Including

478.32

482.25

3.93

0.58

0.01

0.20

2.85

0.78

Including

488.90

513.40

24.50

0.30

BDL

0.09

1.47

0.39

including

502.90

509.75

6.85

0.41

0.01

0.16

1.93

0.57

2000 S

CRM21-003

146.35†

214.50

68.15

0.59

0.03

0.14

3.69

0.830

Including

161.40

179.80

18.04

0.81

0.03

0.21

4.80

1.13

CRM21-005

137.05

179.80

43.24

0.74

0.05

0.16

3.82

1.06

Including

142.05

158.40

16.35

1.20

0.03

0.26

6.11

1.58

CRM21-006

194.40

278.20

83.80

0.64

0.01

0.13

3.23

0.81

Including

229.20

278.20

49

0.87

0.02

0.17

3.88

1.10

Including

248.76

266.20

17.44

1.21

0.03

0.22

5.11

1.53

CRM21-008

195.80

228.40

32.6

0.80

0.02

0.17

3.88

1.02

Including

201.55

215.55

14

1.10

0.02

0.24

4.86

1.40

CRM21-009

190.50

243.85

53.35

0.59

0.01

0.14

2.71

0.75

Including

191.30

201.70

10.4

0.87

BDL

0.25

3.70

1.09

and including

209.00

225.95

16.95

0.62

0.01

0.13

2.76

0.77

and Including

229.90

235.25

5.35

1.21

0.06

0.28

4.88

1.68

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-sections, are estimated to be typically 60-70% of the intersected widths. † Zone has poor recovery

Figure 1 - Carmacks Copper Project Plan View

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Zone 1

Eight holes were drilled in Zone 1 with the objective of increasing confidence in the inferred portion of the sulfide resource of this zone as well as evaluating the southern down-dip continuation of the inferred resource (Figure 2). The drilling was successful in achieving its objectives of delineating the depth extent of mineralization, expanding the mineralization below the current resource model and confirming the grade and anticipated thickness in the inferred portion of the sulphide resource in this zone.

Table 2 - Zone 1 mineral resource[1]

Category

Tonnes (000's)

Cu (%)

Acid soluble Cu (%)

Sulphide Cu (%)

Au (g/t)

Ag (g/t)

Measure & Indicated

Oxide

11,980,000

1.07

0.86

0.21

0.46

4.58

Inferred Oxide

90,000

0.73

0.53

0.20

.13

1.81

Measure & Indicated

Sulfide

4,340,000

0.75

0.03

0.72

0.22

2.33

Inferred Sulfide

4,031,000

0.71

0.01

0.70

.18

1.90

1 Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

While the Preliminary Economic Assessment ("PEA") published in 2017(1,2) only looked at the oxide material in Zones 1,4 & 7, work being conducted by Sedgman and Mining Plus (see news release dated May 18, 2021) is looking at various scenarios to process the sulfide portion of Zone 1 and other sulfide zones of the deposit building a basis for an updated PEA that would include both oxide and sulfide ore.

Figure 2 - Long section of Zone 1 looking west

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Zone 2000S

Zone 2000S, originally discovered in 2006 as the result of an IP survey, has the potential to add tonnage in the sulfide domain of resource category. The mineral resource on this zone is shown in Table 3, which was based on a 0.25% total copper grade cut-off.1 Six diamond drillholes were drilled in this zone are part of the first phase of drilling with the intent of evaluating the continuation of bornite-chalcopyrite mineralization down dip. The drilling was very successful in not only confirming the continuation of the high grade bornite-chalcopyrite mineralization but also extending mineralization well below the current block model as well as encountering significant molybdenite mineralization A technical hole (CRM21-018) was drilled subparallel to the mineralization to evaluate the geological concept of a southern W-E striking fault which post-dates and offsets mineralization.

Table 3 - Zone 2000S mineral resources1

Category

Tonnes (000's)

Cu (%)

Acid soluble Cu (%)

Sulphide Cu (%)

Au (g/t)

Ag (g/t)

Measure & Indicated

Oxide

410,878

0.64

0.49

0.14

0.23

3.15

Inferred Oxide

266,894

0.57

0.34

0.24

0.14

2.66

Measure & Indicated

Sulfide

740,000

0.70

0.07

0.63

0.17

3.28

Inferred Sulfide

636,000

0.73

0.05

0.68

0.18

3.50

1Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

Figure 3 - Long section of 2000S

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

Zone 13

Three diamond drill holes were completed in Zone 13 with the intent of evaluating the northern continuity of sulfide mineralization, along strike and to infill an open area of the block model. Within 1000m of Zone 1, Zone 13 has the potential to add both oxide and sulfide resources to an updated mine plan. The sulfide portion remains open along strike and at depth. All assay results from Zone 13 are pending.

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and hold the health and safety of our workers, and the citizens of the communities in which work in the highest regard.

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada's Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company's website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/656616/Granite-Creek-Copper-Reports-First-Results-from-Phase-1-of-2021-Drill-Program-Including-4350-Meters-of-140-Copper-Equivalent-at-the-Carmacks-Copper-Gold-Silver-Project-in-Yukon-Canada

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

Polaris Renewable Energy Announces Results of Director Elections at Annual and Special Meeting27.6.2026 01:40:00 CEST | Press release

TORONTO, ON / ACCESS Newswire / June 26, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris" or the "Company"), is pleased to announce that all six director nominees proposed by management were elected as directors of the Company at its annual meeting of shareholders held via live video webcast today. Each director will hold office until the close of the next annual meeting of the Company's shareholders or until their successors are duly elected or appointed. The following are the voting results based on proxies received and a vote by online ballot: Director Number of Votes Percentage of Votes Votes For: Votes Withheld: Votes For: Votes Withheld: Jaime Guillen 9,351,125 220,821 97.69% 2.31% James V. Lawless 9,345,405 226,541 97.63% 2.37% Marc Murnaghan 9,355,472 216,474 97.74% 2.26% Marcela Paredes de Vásquez 9,383,074 188,872 98.03% 1.97% Catherine Fagnan 9,386,661 185,285 98.06% 1.94% Adarsh P. Mehta 9,394,433 177,513 98.15% 1.85% About Polaris Renewable Energy Inc. Polaris Ren

FINOS Announces Intent to Form OSERA, a Global Financial Services-Led Alliance for Open Source Supply-Chain Resiliency in the Era of AI26.6.2026 15:00:00 CEST | Press release

Spearheaded by Moderne and Piloted by FINOS Institutional Members, the Open Source Enterprise Resiliency Alliance Mutualizes Open Source 'Backpatching', Promotes Vendor-Neutral Industry-Wide Remediation Standards and Accelerates Evidence-Based, Compliant Open Source Consumption at Scale NEW YORK CITY, NY / ACCESS Newswire / June 26, 2026 / At the Open Source in Finance Forum, FINOS, the financial services arm of the Linux Foundation, announced its intent to form an Open Source Enterprise Resiliency Alliance (OSERA), a global, vendor-neutral, member-governed coalition to strengthen the industry's supply chain resiliency. OSERA will strengthen the open source components that underpin the sector by securing them through a vendor-neutral, upstream-aware approach and accelerating their compliant consumption at scale. The announcement follows a successful Member-only end-to-end pilot phase by Deutsche Bank, Goldman Sachs, Morgan Stanley, Royal Bank of Canada (RBC), and TD Bank Group, in whic

Hydrosat and Kazakhstan Gharysh Sapary Sign Agreement to Advance Satellite-Based Water Intelligence Across Kazakhstan and Central Asia25.6.2026 17:00:00 CEST | Press release

BRUSSELS, BE / ACCESS Newswire / June 25, 2026 / Hydrosat, the leading provider of thermal infrared satellite data and AI-powered analytics, and JSC "NC "Kazakhstan Gharysh Sapary" (JSC "NC "KGS"), Kazakhstan's national space company, announced the signing of a Joint Activity Agreement during a ceremony held in Brussels on 23 June 2026. The agreement establishes the framework for a national-scale program to digitize water resources management using satellite-based thermal analytics and AI, with the potential to expand across Central Asia. The agreement was signed as part of the state visit of the Head of State of the Republic of Kazakhstan to Belgium. During the visit, a number of strategic agreements were concluded to advance artificial intelligence, science, digital infrastructure, and space technologies, creating new opportunities for investment, joint research, technology deployment, and international cooperation. Representing Kazakhstan at the signing ceremonies were Deputy Prime

GA-ASI Adapts Ground Control Station to Fly MQ-9B25.6.2026 16:00:00 CEST | Press release

World Leader in UAS Invests in Upgrades That Ease MQ-9B Procurement SAN DIEGO, CA / ACCESS Newswire / June 25, 2026 / General Atomics Aeronautical Systems, Inc. (GA-ASI) is working to adapt its Block 30 Ground Control Stations (GCS) to fly the company's newer model MQ-9B SkyGuardian® and SeaGuardian® Remotely Piloted Aircraft. When these upgrades are complete, they will enable current users of the Block 30 system, originally designed to fly the MQ-9A Reaper®, to keep that equipment and use it to operate the more capable aircraft. Current users include the U.S. Air Force, U.S. Marine Corps, the Italian Air Force, the French Air Force, the United Arab Emirates Armed Forces, the Spanish Air Force, and the Royal Netherlands Air Force. GA-ASI developed the MQ-9B through its own internal research and development. The upgraded new aircraft required a new and more powerful GCS. The ongoing work with the Block 30 GCS now means that prospective users with existing stocks of equipment wouldn't ne

TIS Warns that Companies are Underprepared for Impact of ISO 20022 Financial Transaction Standard25.6.2026 15:30:00 CEST | Press release

Treasury Intelligence Solutions (TIS) reports that payment disruption is now reaching corporates as banks enforce stricter data standards under the new standard for transaction messaging, and critical gaps are appearing. BERLIN, DE / ACCESS Newswire / June 25, 2026 / TIS today announced a call to action for corporate treasury, finance, and IT teams: ISO 20022 is no longer a bank-only issue, and companies that treat it as simply a messaging upgrade may face payment delays, rejected transactions, higher manual intervention, and reconciliation problems. TIS is the creator of an award-winning cloud-based platform for managing global cash flow, liquidity, and payments. Hundreds of worldwide clients rely on the TIS platform for $80 billion in daily cash management and $2.7 trillion in annual transaction volume. The TIS call to action stems from the SWIFT global financial communication network's steps to phase in ISO 20022 as the sole standard for interbank payment instructions. The new stand

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye