ACCESS Newswire

Eskay Mining Corp.

20.7.2021 14:03:23 CEST | ACCESS Newswire | Press release

Share
Eskay Mining Announces Completion of NI 43-101 Technical Report On Its 100% Owned Consolidated Precious Metal-Rich VMS Project in the Golden Triangle, British Columbia

TORONTO, ON / ACCESSWIRE / July 20, 2021 / Eskay Mining Corp. ("Eskay" or the "Company") (TSXV:ESK)(OTCQB:ESKYF)(FSE:KN7)(WKN:A0YDPM) is pleased to announce the completion of a National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report dated July 16, 2021 with an effective date of June 8, 2021 and entitled "NI 43-101Technical Report on the SIB-Corey-North Mitchell Property" (the "Technical Report") in respect of its 100% owned Consolidated Eskay precious metal-rich volcanogenic massive sulphide ("VMS") project in the Golden Triangle, British Columbia (the "Property"). The Technical Report was co-authored by Darren Lindsay, P.Geo., Neil D. Prowse, M.Sc., John DeDecker, Ph.D., Andrew J. Mitchell, B.Sc., P.Geo., and Rachel S. Y. Kim, M.Sc. The Technical Report provides a summary of the history of the Property and the work carried out on the Property in the summer of 2020 and recommends a follow up exploration program for the property. A copy of the Technical Report is available on the Company's SEDAR issuer profile at www.sedar.com.

The Property has been shown to host several VMS targets and several occurrences of vein style mineralization; it also has the potential to host nickel-copper massive sulphides. Main VMS target areas on the Property include the Lulu and the TV-Jeff zones.

Results from comprehensive lithogeochemical sampling and detailed core logging of historic and new drill core on the Property has allowed for the synthesis a new model of the tectonic architecture of the Eskay Mining District. A picture has now emerged of three anticlines, the central Eskay Anticline, the Eastern Anticline and the Western Anticline, wholly or partially underlying Eskay's property. Major ramp-type thrust faults are associated with each anticline.

This new model suggests the flanks of each of these three anticlines are prospective for Eskay Creek style VMS mineralization where favourable strata are exposed. Several newly recognized trends along these flanks are evident in recent BLEG, and multi-element geochemical anomalism. Detailed interpretations of the structural and geological elements of the Property, and specific mineralized zones investigated by Company geologists in 2020, resulted in the revised geological model.

The revised geological model is strongly supported by the underlying data resulting in a substantial increase of potential for expansion of known prospects but also for the discovery of additional mineralized zones. The Sib-Corey-Mitchell North Project is a project of merit deserving of additional evaluation of its discovery potential.

Darren Lindsay, P.Geo., the Qualified Prerson for the Technical Report and a qualified person as defined by NI 43-101, has reviewed and approved the technical contents of this news release.

About Eskay Mining Corp:
Eskay Mining Corp (TSXV:ESK) is a TSX Venture Exchange listed company, headquartered in Toronto, Ontario. Eskay is an exploration company focused on the exploration and development of precious and base metals along the Eskay rift in a highly prolific region of northwest British Columbia known as the "Golden Triangle," approximately 70km northwest of Stewart, BC. The Company currently holds mineral tenures in this area comprised of 177 claims (130,000 acres).

All material information on the Company may be found on its website at www.eskaymining.com and on SEDAR at www.sedar.com.

For further information, please contact:
Mac Balkam
President & Chief Executive Officer
T: (416) 907-4020
E: Mac@eskaymining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This Press Release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words "may", "would", "could", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.

SOURCE: Eskay Mining Corp.



View source version on accesswire.com:
https://www.accesswire.com/656189/Eskay-Mining-Announces-Completion-of-NI-43-101-Technical-Report-On-Its-100-Owned-Consolidated-Precious-Metal-Rich-VMS-Project-in-the-Golden-Triangle-British-Columbia

To view this piece of content from www.accesswire.com, please give your consent at the top of this page.

About ACCESS Newswire

DK

Subscribe to releases from ACCESS Newswire

Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from ACCESS Newswire

Tech "Talent Wars" Are Over as More Companies Prioritize Upskilling, General Assembly Report Finds25.2.2026 15:00:00 CET | Press release

83% of tech recruiters believe company success is more dependent on upskilling employees for AI versus hiring new talent, according to The State of Tech Talent 2026 NEW YORK CITY, NY / ACCESS Newswire / February 25, 2026 / Nearly all technology recruiters (96%) say technical roles are still at least a bit difficult to fill, as most (83%) believe their company's success is now more dependent on upskilling their existing employees for AI rather than hiring external talent, according to The State of Tech Talent 2026, the fourth annual report from AI training provider General Assembly, an LHH brand. "The AI skills gap is growing too fast for companies to hire their way out," said Daniele Grassi, CEO of General Assembly. "Continuous, incremental and role-specific learning is the only way to keep up with the pace of technology change. Growing investment in upskilling reflects leaders' realization that their existing employees bring the business context, institutional knowledge and cultural n

Around Half of Firms' Revenue Depends on Winning RFPs, but Many Lack Scalable Proposal Management Processes, QorusDocs Study Finds25.2.2026 15:00:00 CET | Press release

63% report higher RFP volumes - but up to 20% go unfinished due to resource constraints as proposal teams see 25 to 50% workload spikes SEATTLE, WA / ACCESS Newswire / February 25, 2026 / As B2B buying has become more structured, consensus-driven and risk-averse, proposals and RFPs have moved from a back-office task to a primary driver of revenue at professional services firms, according to new research from QorusDocs, a leader in AI-powered value and proposal management software. Once viewed as a downstream support function, proposal management, now directly shapes pipeline health, win rates and revenue outcomes. As AI disrupts the traditional billable-hour model and prompts corporate clients to question fees, proposal operations have emerged as a critical lever to protect margins and capture growth. However, growing RFP volumes have driven a 25 to 50% workload spike for proposal teams at most organizations. "Time, not intent, has become the primary constraint for modern proposal team

Assembly Chosen to Power Global Paid Media and Amazon Growth for Jabra24.2.2026 15:50:00 CET | Press release

LONDON, GB / ACCESS Newswire / February 24, 2026 / Assembly, the global omnichannel agency built to make brands perform, has been appointed by Jabra, world leading brand in audio, video, and collaboration solutions, as its global paid media agency and lead partner for Amazon services following a competitive pitch process. Assembly's remit spans full-funnel paid media across search, social, display, video, and retail media, alongside Amazon strategy and marketplace operations, to fuel Jabra's next phase of global growth. Pitch Consultants, Tuffon Hall Consultancy, commented: "This was an exceptionally competitive process, and Jabra's new move towards a direct-to-consumer model marks a major shift for the business. Assembly impressed with a powerful proposition, using their proprietary platform STAGE to create a true intelligence engine for Jabra that supports smarter, more connected growth." Why Jabra chose Assembly Assembly was selected for its ability to connect brand and performance,

GA-ASI Develops Long-Range Weapons Capabilities for MQ-9B23.2.2026 13:10:00 CET | Press release

Industry Leading UAS Expands Mission Roles To Include Naval Strike SAN DIEGO, CA / ACCESS Newswire / February 23, 2026 / General Atomics Aeronautical Systems, Inc. (GA-ASI) is developing the addition of long-range standoff weapons to its top-of-the-line MQ-9B SkyGuardian® and SeaGuardian®. Demand continues from naval and air warfighters for platforms that can hold targets at risk from great ranges, especially over the expanses of air and water in the Western Pacific. That's why GA-ASI engineers have begun the work of adapting MQ-9B's payload, stability, range and other features to accommodate the new generation of extended-range precision weapons. "MQ-9B continues to impress in the field and we keep adding to our global customer list," said GA-ASI President David R. Alexander. "We want to continue to build value in the aircraft by expanding into more missions. MQ-9B features extraordinary payload capacity, so it only makes sense to add to our mission sets with the ability to carry long

GA-ASI and USAF Demonstrate Manned-Unmanned Teaming With F-22 and MQ-20 In Joint Autonomy Exercise23.2.2026 13:05:00 CET | Press release

SAN DIEGO, CALIFORNIA / ACCESS Newswire / February 23, 2026 / In collaboration with the U.S. Air Force, General Atomics Aeronautical Systems, Inc. (GA-ASI) conducted its latest demonstration performing an autonomous mission out of Edwards Air Force Base in Southern California using its MQ-20 Avenger® unmanned jet and an F-22 Raptor equipped with the latest government reference autonomy software. The test, which showcased Manned-Unmanned Teaming between the F-22 and MQ-20, leveraged autonomy and the tactical data link to enable coordination between the platforms. The mission included a live engagement between the MQ-20 and the F-22 as the command aircraft flown by an onboard human pilot, highlighting the ability to receive and execute teaming commands. "We appreciate the flawless execution of this mission using the government's advanced autonomous systems," said GA-ASI President David R. Alexander. "This demo featured the integration of mission elements and the ability of autonomy to ut

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye