Business Wire

CA-ENERGY-VAULT-HOLDINGS

8.9.2022 14:02:20 CEST | Business Wire | Press release

Share
Energy Vault, Wellhead Electric and W Power Announce Agreement for 275 MWh Energy Storage Project in Southern California

Energy Vault Holdings Inc. (NYSE: NRGV) ("Energy Vault" or the “Company”), a leader in sustainable, grid-scale energy storage solutions, today announced the signing of the Stanton Energy Storage System (SESS) EPC contract with Wellhead Electric Company, Inc. (“Wellhead Electric”) and W Power, LLC, (“W Power”), a woman-owned business enterprise that has developed and owned power generation facilities in California. The project will be operated by Wellhead Services, Inc., one of the most experienced developers and operators of innovative energy generation and energy storage facilities in California, which is based in Sacramento, California.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20220908005421/en/

Energy Vault will begin deployment immediately in 2022 of a 275.2 MWh battery storage project at W Power’s Energy Reliability Center in Stanton, California. The project is on an accelerated timeline to meet critical power needs for southern California and is expected to be completed in mid-2023. Energy Vault will also support W Power and Wellhead with development and deployment of future energy storage projects in California representing approximately 600 MWh+ of additional capacity in the near term.

The system will be built on Energy Vault Solutions’ (EVS) proprietary integration platform and powered by EVS’ energy management software. The EVS platform, which was introduced in Q4 2021, leverages the most advanced software architecture and optimization algorithms, and enables the integration and orchestration of multiple energy assets under a multitude of use cases. Together with the Company’s existing sustainable long duration gravity energy storage technology offering, Energy Vault continues to advance the global transition to a carbon-free, resilient power grid.

"We look forward to developing this project with Wellhead and W Power that will be built on our proprietary system and reflects execution on our previously announced EVS strategy,” said Robert Piconi, Chairman and Chief Executive Officer, Energy Vault. “This exciting project reflects our broad energy storage experience and capabilities across multiple underlying storage technologies while optimizing energy density and performance requirements that was a key factor to meet Wellhead’s requirements. The demanding deployment timelines and need for surety of execution exhibit our ability to be customer focused, nimble and responsive to the rapidly-expanding needs of the global storage market.”

“Our EVS-enabled solutions are the natural complement to Energy Vault’s long-duration gravity storage capabilities which are being deployed globally in parallel, and a key component of our vision of being a leading energy storage technology partner to our customers that require innovation and creativity in dealing with the complexities of the grid,” continued Mr. Piconi. “With EVS we have been able to expand our serviceable market and we are proud to offer a broad portfolio of solutions, from short to long duration, with our EVxTM gravity-based technology, that help customers achieve their decarbonization targets while maximizing economic returns. This is fundamental to the mission of the Company.”

“The team at Energy Vault has greatly impressed us with both their extensive knowledge of energy storage solutions and their critical engineering, integration, and construction experience,” said Hal Dittmer, CEO, Wellhead Electric. “They have won our trust because of their dedication to find the optimal solution for our Stanton site. In addition, because of the EVS technological platform, with the highest energy density and safety features, we were able to fit the maximum energy storage capacity at our site, with full confidence of meeting our expected system performance and project economic return requirements.”

About Energy Vault

Energy Vault develops and deploys sustainable energy storage solutions designed to transform the world’s approach to utility-scale energy storage in realizing decarbonization while maintaining grid resiliency. The company’s proprietary gravity-based energy storage technology, battery storage technology, and energy storage management and integration platform are intended to help utilities, independent power producers and large industrial energy users significantly reduce their levelized cost of energy while maintaining power reliability. Utilizing eco-friendly materials with the ability to integrate waste materials for beneficial re-use, Energy Vault is facilitating the shift to a circular economy while accelerating the clean energy transition for its customers. For additional information, please visit: www.energyvault.com.

Forward-Looking Statements

This press release contains forward-looking statements that involve risks, uncertainties, and assumptions including statements regarding Energy Vault’s future expansion, deployments and capabilities. There are a significant number of factors that could cause actual results to differ materially from the statements made in this press release, including: risks related to the deployment of Energy Vault’s energy management software the projects announced in this press release, risks related to Energy Vault’s ability to supply equipment, engineering, procurement, construction and balance of plant services for the projects announced in this press release, the fact that the project is the first such deployment for Energy Vault and as a result, there could be unforeseen issues with the system, the ability to meet milestones in order to receive payments, unforeseen delays in the projects announced in this press release, whether these projects will be constructed on time or whether they will operate as planned, developments and changes in the general market, the continuing impact of COVID-19, political, economic, and business conditions, and the impact of competing technologies on demand for battery powered projects. Additional risks and uncertainties that could affect our financial results are included under the captions "Risk Factors" and "Management's Discussion and Analysis of Financial Condition and Results of Operations" in the Quarterly Report on Form 10-Q for the quarter ended June 30, 2022, filed with the SEC on August 8, 2022, which is available on our website at investors.energyvault.com and on the SEC's website at www.sec.gov. Additional information will also be set forth in other filings that we make with the SEC from time to time. All forward-looking statements in this press release are based on information available to us as of the date hereof, and we do not assume any obligation to update the forward-looking statements provided to reflect events that occur or circumstances that exist after the date on which they were made, except as required by applicable law.

To view this piece of content from cts.businesswire.com, please give your consent at the top of this page.

View source version on businesswire.com: https://www.businesswire.com/news/home/20220908005421/en/

About Business Wire

Business Wire
Business Wire
101 California Street, 20th Floor
CA 94111 San Francisco

http://businesswire.com
DK

Subscribe to releases from Business Wire

Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from Business Wire

Biocytogen Announces FDA IND Clearance for Partner NEOK Bio’s NEOK002 Targeting Solid Tumors27.3.2026 01:00:00 CET | Press release

Biocytogen Pharmaceuticals (Beijing) Co., Ltd. (Biocytogen, SSE: 688796; HKEX: 02315), a global biotechnology company that drives the research and development of novel antibody-based drugs with innovative technologies, today announced that its partner NEOK Bio, Inc. recently received clearance from the U.S. Food and Drug Administration (FDA) of an investigational new drug (IND) application for NEOK002, an EGFR/MUC1-targeting ADC program for solid tumors. NEOK Bio plans to initiate a Phase 1 clinical study in the second quarter of 2026 and expects to report initial data in 2027. This IND clearance marks an important milestone for NEOK002, an EGFR/MUC1-targeting ADC candidate developed by NEOK Bio and built on a bispecific antibody originally developed by Biocytogen and licensed in 2024. According to NEOK Bio, NEOK002 is being advanced for solid tumors and may offer differentiated efficacy and safety compared with monospecific ADC approaches directed at either target alone. Dr. Yuelei Sh

Spring is in Full Bloom at the Empire State Building with New Festive Experiences, Sweet Treats, and Seasonal Tower Lighting26.3.2026 21:30:00 CET | Press release

Spring is in full swing at the “World’s Most Famous Building.” The Empire State Building (ESB) today announced a vibrant lineup of spring events in NYC, which include special experiences, treat pop-ups, and an iconic tower lighting that captures the joy and color of the beautiful season. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260326216271/en/ Spring is in Full Bloom at the Empire State Building with New Festive Experiences, Sweet Treats, and Seasonal Tower Lighting “The Empire State Building Observation Deck has transformed into a celebration of the season and one of the best things to do in NYC this spring,” said Dan Rogoski, observatory general manager. “Whether it’s views beside our butterfly installation, sweet pop-ups, or a chance to spot the Easter Bunny, there is something special for every visitor.” Flutter of Color: The Empire State Building installed a brand-new photo opportunity on the 86th Floor Observati

Venture Global and Edison Announce Calcasieu Pass Arbitration Settlement26.3.2026 21:15:00 CET | Press release

Today, Venture Global and Edison jointly announced the signature of a commercial agreement for the settlement of the pending arbitration between the two companies concerning the Calcasieu Pass project. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260326559130/en/ Completion of the settlement is expected by the end of Q2 2026, at which point the arbitration will be terminated. The agreement fully resolves the arbitration in its entirety. As part of the settlement, Edison and Venture Global have also agreed to the delivery to Europe of additional cargoes beyond those envisaged under the long-term contract, to support gas supplies primarily to the Italian market. The first delivery is scheduled for May 2026, in Italy, at the Adriatic LNG Terminal. The agreement represents a significant step in strengthening commercial cooperation between the parties and it establishes a foundation for further future deliveries in the context

Reply Recognized as a Microsoft Frontier Partner for Enterprise AI Delivery26.3.2026 19:06:00 CET | Press release

Reply [EXM, STAR: REY] announces it has been recognized as a Microsoft Frontier Partner within the Microsoft AI Cloud Partner Program, earning the Frontier Partner Badge for demonstrating advanced capabilities in delivering AI-first solutions across Cloud & AI Platforms, AI Business Solutions, and Security. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260326965586/en/ The recognition reflects Reply’s capabilities across the Microsoft ecosystem, built through the work of its specialized companies – including Aim Reply, Business Elements Reply, Cluster Reply, Root16 Reply, Solidsoft Reply, Valorem Reply, WM Reply and Zest Reply – supporting enterprise organizations in designing, implementing, and operating AI solutions on Microsoft platforms across real-world business scenarios. The Frontier Partner badge recognizes partners that demonstrate advanced AI driven capabilities and meet rigorous badge requirements at the time of

SLB Announces Dates for First-Quarter 2026 Results Conference Call26.3.2026 18:00:00 CET | Press release

SLB (NYSE:SLB) will hold a conference call on April 24, 2026, to discuss the results for the first quarter ending March 31, 2026. The conference call is scheduled to begin at 11:00 a.m. US Eastern time and a press release regarding the results will be issued at 7:00 a.m. US Eastern time. To access the conference call, listeners should contact the Conference Call Operator at +1 (833) 470-1428 within North America or +1 (404) 975-4839 outside of North America approximately 10 minutes prior to the start of the call and the access code is 742955. A webcast of the conference call will be broadcast simultaneously at https://events.q4inc.com/attendee/972985185 on a listen-only basis. Listeners should log in 15 minutes prior to the start of the call to test their browsers and register for the webcast. Following the end of the conference call, a replay will be available at www.slb.com/irwebcast until May 1, 2026, and can be accessed by dialing +1 (866) 813-9403 within North America or +1 (929)

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye