Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization
10.6.2026 12:00:00 CEST | ACCESS Newswire | Press release
VANCOUVER, BC / ACCESS Newswire / June 10, 2026 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the exploration results from Phase 2 of the recent drilling campaign at its Costa de Cobre project ("Costa de Cobre" or the "Project" (formerly known as "Los Chapitos"(1)) in Peru. Camino completed five drill holes along the Diva trend corridor, where drilling activities focused on the Adriana target with the objective of expanding the known mineralized body and improving the understanding of the scale and continuity of the mineralized system. The maximum drill hole depth was 260 metres and all five drill holes intercepted strong copper mineralization and spanned a strike length of approximately 400 metres.
Key highlights of recent Costa de Cobre drill holes:
Adriana: DCH-131:
69.8 m @ 0.47% Cu & 4.17 g/t Ag, including
32.0 m @ 0.75% Cu & 6.50 g/t Ag, and
9.75m @ 1.25% Cu & 6.46 g/t Ag, including
3.90 m @ 2.99% Cu & 15.63 g/t Ag
Adriana DCH-132:
44.0 m @ 0.38% Cu & 1.87 g/t Ag, and
77.6 m @ 0.36% Cu & 1.63 g/t Ag, and
17.6 m @ 2.49% Cu & 12.58 g/t Ag
Adriana: DCH-133:
76.2 m @ 0.88% Cu & 2.03 g/t Ag, including
16.25 m @ 2.67% Cu & 6.82 g/t Ag
Adriana: DCH-134:
53.8 m @ 0.77% Cu & 4.45 g/t Ag, including
40.8 m @ 0.96% Cu & 5.43 g/t Ag
Adriana: DCH-135:
30.6 m @ 0.45% Cu & 2.38 g/t Ag, including
9.3 m @ 0.96% Cu & 6.12 g/t Ag
Costa de Cobre is Camino's second copper project with partner Nittetsu Mining Co, Ltd. ("Nittetsu"), who is completing a 35% earn-in interest in Costa de Cobre after investing CAD $10 million and after the completion of the current drilling campaign (see news release dated June 14, 2023). Camino is also advancing its Puquios Copper Project in Chile with Nittetsu Mining toward mine construction and development (see news release dated April 17, 2025. Construction is expected to commence in the summer, subject to securing project financing and an affirmative final investment decision.
The Costa de Cobre copper project offers growth potential through both resource expansion and new discoveries, supported by established infrastructure, strategic partnerships with Denham Capital and Nittetsu Mining, and exposure to the rapidly growing global copper market.
"These results continue to demonstrate good continuity and grades along the Diva trend at Adriana, with numerous additional high priority targets on the property including along the Diva, La Estancia and Atajo trends. Subject to further exploration of such high priority targets and the delineation of a mineral resource, we envision a copper mine that would be started around an expanded Adriana zone, and possibly connecting to feeder structures at depth, and include additional expanded zones of copper mineralization such as Lourdes located 1.4 km to the north, or Katty located 1 km to the south, and potential copper discoveries along the other La Estancia and Atajo trends. Costa de Cobre is located at low elevation along Peru's southern coast, close to major infrastructure, including the recently announced construction of the San Juan de Marcona port terminal, which will enhance future logistics and development in the region. Camino is now positioned with active growth initiatives in both Peru and Chile. With construction preparations advancing at Puquios and continued exploration programs planned in both Chile and Peru, we believe 2026 will be an active and transformative year for the Company as we build a leading copper development and exploration copper platform," said Jay Chmelauskas, CEO of Camino.
Nittetsu Mining's exploration manager, Yoshikazu Fujimoto stated, "Nittetsu has completed the three year earn-in at Costa de Cobre with these results continuing to demonstrate high-grade copper intercepts. Costa de Cobre hosts many discovery targets, and we have only drilled a fraction of the property's multiple copper trends. We now plan to advance the project to establish our joint venture with Camino, where Nittetsu will maintain a 35% Project interest."
"The integration of geological, structural, and drilling information has enhanced our ability to predict and target copper mineralization across Costa de Cobre. This work has not only contributed to recent drilling success but has also highlighted multiple opportunities to expand the mineralized footprint to unlock the broader district-scale potential of the project (Figure 1)," said Paulo Rodriguez and Jheferson Alcocer, geologists at Camino in Peru.
Geological Discussion
The recently completed 990.70 metres drilling program has increased total drilling at the Costa de Cobre Copper Project to 29,650 metres, further strengthening the Project's growing exploration database. Notably, approximately 91% of all historical drilling has been focused along the highly prospective Diva trend, extending approximately 7 km, underscoring the Company's strategic emphasis on this important copper corridor.
In addition to the Diva trend, other major structural corridors, such as La Estancia and Atajo, extending approximately 18 km and 8 km, respectively, remain significant, underexplored, and present compelling targets for future drilling campaigns.
Drilling in the vicinity of the Diva trend has expanded the mineralized footprint within the Adriana zone, highlighting the growth potential of the mineralized body. Five drill holes were completed along the highly prospective Adriana zone (holes DCH-131, DCH-132, DCH-133, DCH-134, and DCH-135) (Figure 2).
Figure 1. Map Showing the three copper corridors at Costa de Cobre project, Diva, La Estancia and Atajo trends.
Figure 2. Target location and holes drilled in the 2026 drilling campaign.
HOLE ID | EAST | NORTH | AZIMUTH | DIP | DEPTH (M) | FROM | TO | WIDTH (M) | GRADE (% Cu) | GRADE (g/t Ag) | AREA |
DCH-131 | 574129.00 | 8266853.00 | 225.00 | -50.00 | 188.80 | 7.40 | 20.20 | 12.80 | 0.57 | 6.93 | Adriana |
and | 30.20 | 100.00 | 69.80 | 0.47 | 4.17 | ||||||
incl | 45.50 | 77.50 | 32.00 | 0.75 | 6.50 | ||||||
and | 107.70 | 127.50 | 19.80 | 0.41 | 2.32 | ||||||
and | 132.00 | 139.50 | 7.50 | 0.30 | 3.09 | ||||||
and | 159.45 | 169.20 | 9.75 | 1.25 | 6.46 | ||||||
incl | 161.00 | 164.90 | 3.90 | 2.99 | 15.63 | ||||||
and | 177.50 | 182.25 | 4.75 | 0.12 | 0.25 | ||||||
DCH-132 | 574205.00 | 8266841.00 | 225.00 | -51.00 | 223.70 | 7.50 | 51.50 | 44.00 | 0.38 | 1.87 | Adriana |
and | 64.50 | 80.00 | 15.50 | 0.20 | 0.98 | ||||||
and | 96.50 | 174.10 | 77.60 | 0.36 | 1.63 | ||||||
and | 188.60 | 207.30 | 18.70 | 2.35 | 11.85 | ||||||
incl | 189.70 | 207.30 | 17.60 | 2.49 | 12.58 | ||||||
DCH-133 | 574317.50 | 8266664.00 | 225.00 | -62.00 | 169.10 | 19.70 | 24.65 | 4.95 | 0.28 | 2.12 | Adriana |
and | 89.50 | 165.70 | 76.20 | 0.88 | 2.03 | ||||||
incl | 139.75 | 156.00 | 16.25 | 2.67 | 6.82 | ||||||
DCH-134 | 574386.00 | 8266570.00 | 217.00 | -51.00 | 117.20 | 0.50 | 54.30 | 53.80 | 0.77 | 4.45 | Adriana |
incl | 6.00 | 46.80 | 40.80 | 0.96 | 5.43 | ||||||
DCH-135 | 574129.00 | 8266853.00 | 225.00 | -77.00 | 291.90 | 8.70 | 27.70 | 19.00 | 0.40 | 4.72 | Adriana |
incl | 11.50 | 18.70 | 7.20 | 0.79 | 9.33 | ||||||
and | 54.10 | 84.70 | 30.60 | 0.45 | 2.38 | ||||||
incl | 66.50 | 75.80 | 9.30 | 0.96 | 6.12 | ||||||
and | 90.45 | 96.00 | 5.55 | 0.38 | 0.79 | ||||||
and | 109.50 | 118.50 | 9.00 | 0.40 | 2.26 | ||||||
and | 138.90 | 141.00 | 2.10 | 0.83 | 1.55 | ||||||
and | 151.50 | 157.40 | 5.90 | 0.32 | 1.05 | ||||||
and | 185.95 | 189.00 | 3.05 | 0.27 | 0.57 | ||||||
and | 251.30 | 267.60 | 16.30 | 0.30 | 0.44 | ||||||
incl | 254.10 | 260.10 | 6.00 | 0.46 | 0.42 | ||||||
Notes: Datum for coordinates is WGS84 Zone 18S. Widths are not true widths | |||||||||||
Table 1. Summary of the 2026-1 drilling campaign, Costa de Cobre Copper Project, Peru.
The project area within the Adriana zone is underlain by volcanic rocks of the Chocolate Formation, with pseudo-bedding displaying a strike of N250°-270° and a dip of 12°-30° to the NW. Up to three volcanic units have been identified, consisting of epiclastic sandstones, andesitic lavas, and lapilli tuffs, which are intruded by fine-grained monzodioritic hypabyssal bodies.
Mineralization is structurally controlled by the NW-SE-trending Diva fault, which traverses the drilled area and segments it into the East and West block domains. Copper mineralization is primarily hosted within the volcanic and hypabyssal rocks as breccias and mantos related to this structure. Near the surface, copper oxides are preferentially concentrated within the breccia matrix, partially penetrating the clasts along fractures and microfractures, whereas deeper zones are dominated by sulfides, specifically chalcopyrite and bornite.
Adriana Target
At the Adriana target, recent drilling has intersected significant copper and silver mineralization across multiple intervals. Drill hole DCH-131 returned several mineralized zones, highlighted by an upper intercept of 12.8 m @ 0.57% Cu & 6.93 g/t Ag, a broad zone of 69.8 m @ 0.47% Cu & 4.17 g/t Ag, and a high-grade deeper intercept of 3.90 m @ 2.99% Cu & 15.63 g/t Ag near the bottom of the hole. The system remains open at depth, indicating potential for further mineralization (Figure 3).
Drill hole DCH-132 also intersected substantial continuous mineralization, including a broad shallow interval of 44.0 m @ 0.38% Cu & 1.87 g/t Ag, another thick zone of 77.6 m @ 0.36% Cu & 1.63 g/t Ag, and a deeper high-grade intercept of 17.6 m @ 2.49% Cu & 12.58 g/t Ag (Figure 4).
Additionally, drill hole DCH-133 intercepted an upper interval of 4.95 m @ 0.28% Cu & 2.12 g/t Ag followed by a significant continuous zone of 76.2 m @ 0.88% Cu & 2.03 g/t Ag (Figure 5), while DCH-134 successfully encountered 53.8 m @ 0.77% Cu & 4.45 g/t Ag starting nearly from the surface (0.5 m) (Figure 6).
Notably, assay results for drill hole DCH-135 confirmed multiple stacked mineralized horizons throughout the entire hole, highlighted by an upper zone of 19 m @ 0.40% Cu & 4.72 g/t Ag, an intermediate interval of 9 m @ 0.40% Cu & 2.26 g/t Ag, and a deeper zone of 16.3 m @ 0.30% Cu & 0.44 g/t Ag. These recent intercepts continue to support the continuity of mineralization and indicate the potential for additional high-grade zones within the Adriana zone.
Figure 3. Cross section of copper mineralization at Adriana zone, drill holes DCH-131 and DCH-135.
Figure 4. Cross section of copper mineralization at Adriana zone, drill hole DCH-132.
Figure 5. Cross section of copper mineralization at Adriana zone, drill hole DCH-133.
Figure 6. Cross section of copper mineralization at Adriana zone, drill hole DCH-134.
The Costa de Cobre exploration and development program is designed to systematically unlock the value of a district-scale copper-silver system through resource expansion, new discoveries, and progressive de-risking of the asset.
Recent drilling supports the Company's geological model, indicating continuity of mineralization along the Diva Trend and suggesting that the system remains open both at depth and along strike. The next phases of exploration are focused on expanding known mineralized zones, testing multiple high-priority targets across the underexplored Diva, La Estancia, and Atajo structural corridors, and advancing the project toward resource delineation and future development milestones, with only a small portion of the prospective district and three copper corridors across the property systematically drill-tested to date.
Sampling and Assay Procedures
During this campaign, five drillholes were completed. Core has been logged and sampled at the Company's facilities in the town of Chala, 15 km from the project. Industry standard chain of custody and QA/QC practices are followed with samples sent to Lima where they are analyzed by ICP-MS at ALS Chemex Labs' facility, an independent laboratory. The Camino geological team complied with the written internal QA/QC procedures, where the insertion of blank samples, certified international standards (pulps) and duplicates, met the objectives and acceptable results.
(1) All previously disclosed technical and scientific information in respect of the Los Chapitos copper project remains applicable to the Costa de Cobre Project.
About Camino
Camino is a discovery and development stage copper exploration company. The Company has entered into a joint venture partnership with Nittetsu Mining Co., Ltd. to advance the construction-ready Puquios copper project in Chile toward development and production. Camino is advancing its IOCG Costa de Cobre copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.
Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data, with such verification including a review of assay certificates, QA/QC results, and drill logs.
ON BEHALF OF THE BOARD | For further information, please contact: |
/S/ "Jay Chmelauskas" | Camino Investor Relations |
President and CEO | |
Tel: (604) 493-2058 | |
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to the prospectivity of future exploration work at Costa de Cobre, future planned drilling programs in Peru and Chile, the interpretation of geological models, the potential continuity and extent of mineralized systems, the continuation of drilling with future campaigns, and the prospectivity for copper exploration in new targets. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those anticipated by management; that geological interpretations, including the continuity or extent of mineralized bodies, may change with additional drilling; that the Company may not realize the benefits of joint ventures and/or strategic partnerships; that the Company may be unable to obtain or may experience delays in obtaining required permits, authorizations and approvals; operational and technical risks inherent in exploration; risks related to third‑party infrastructure development and timing, including the proposed San Juan de Marcona Port; and risks related to the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.
SOURCE: Camino Minerals Corp
Camino Minerals Corp

Subscribe to releases from ACCESS Newswire
Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from ACCESS Newswire
Leggett & Platt Automotive Launches New Brand Identity: Leggett Dynamics10.6.2026 12:50:00 CEST | Press release
ACCELERATES INNOVATION & GROWTH IN COMFORT, MOTION & SOFTWARE INTEGRATED SYSTEMS DETROIT, MI / ACCESS Newswire / June 10, 2026 / Leggett & Platt Automotive today announced the launch of its new brand identity, "Leggett Dynamics", and tagline "eMotion & Comfort for everyone, everywhere, every day" signaling a strategic shift to accelerate innovation and growth in comfort and motion systems for automotive, adjacent and diversified markets. Megatrend & Consumer Shifts "Leggett Dynamics creates experiences where comfort and motion feel effortless, intelligent, personalized and instinctive across all aspects of life. This positions us well in the market in terms of megatrends as well as anticipating and proactively innovating for future expectations," said Marinela Cirstea, President of Leggett Dynamics. According to Cirstea, comfort and motion are at the epicenter of converging megatrends and shifting consumers' priorities toward personalized experiences, health and wellness, plus instant
From Retrofit to AI: Akkodis Strengthens Digital Innovation Through Industrial Aerospace Applications at ILA Berlin 202610.6.2026 06:45:00 CEST | Press release
At ILA Berlin 2026, Akkodis will showcase concrete applications in digital engineering, AI-driven analytics and industrial execution across the entire aerospace lifecycle - from initial digital design to real-world aerospace applications. BERLIN, DE / ACCESS Newswire / June 10, 2026 / Akkodis, a global leader in digital engineering consulting and part of the Adecco Group, demonstrates how digital development, artificial intelligence and industrial execution come together to bring new solutions into aerospace applications faster at ILA Berlin 2026. Image: Akkodis at ILA Berlin 2026. Source: AkkodisIn 2026, the aerospace and defense sector is being shaped by strong growth and sustained long-term demand, supported by continued investment in innovation and next-generation technologies. At the same time, increasing pressures on efficiency, availability and sustainability are driving a shift toward solutions that can be rapidly integrated and scaled. At the center of Akkodis' presence is a n
Northfield Announces Change of Corporate Name to Juno International Corporation9.6.2026 21:45:00 CEST | Press release
TORONTO, ON / ACCESS Newswire / June 9, 2026 / Northfield Capital Corporation (TSXV:NFD.A) (the "Corporation") today announced that it will change its corporate name to "Juno International Corporation" effective Thursday, June 11, 2026 (the "Name Change"). The trading symbol for the Corporation's class A restricted voting shares (the "Shares") will change to "JUN.A" following the completion of the Name Change. Trading of the Shares on the TSX Venture Exchange under the new name will commence at the open of markets on Thursday, June 11, 2026. There is no change in the capitalization of the Corporation in connection with the Name Change. No action is required by existing shareholders of the Corporation with respect to the Name Change. Outstanding certificates and Direct Registration Statement Advices with respect to the Shares do not need to be exchanged. Upon completion of the Name Change, the Company's new CUSIP number for the Shares will be 482045101 and its new ISIN number will be CA
WLF Energy and Farasis Energy Sign Strategic Partnership Agreement to Accelerate Next-Generation Energy Storage Solutions Globally9.6.2026 15:20:00 CEST | Press release
Partnership combines Farasis Energy's advanced battery technology leadership with WLF Energy's integrated energy platform, AI-driven optimization capabilities, and global deployment strategy STUTTGART, GERMANY / ACCESS Newswire / June 9, 2026 / WLF Energy and Farasis Energy today announced the signing of a Strategic Partnership Agreement to jointly develop, industrialize, and commercialize next-generation battery technologies and energy storage products for global markets. The partnership establishes a long-term framework for collaboration across battery cell technology, battery systems, energy management software, artificial intelligence, and large-scale deployment of energy storage solutions. Together, both companies aim to accelerate the transition toward more affordable, resilient, and sustainable energy infrastructure worldwide. The agreement combines Farasis Energy's extensive experience in advanced battery technology development and manufacturing with WLF Energy's integrated tec
WLF Energy Launches as Europe's Fast, Clean, Bold New Vertically Integrated Clean Energy Champion; Built to Power a Continent9.6.2026 13:30:00 CEST | Press release
Energy platform goes public at The Battery Show Stuttgart, targeting sub-10ct/kWh clean energy for everyone in Europe - and laying the foundation for the continent's energy independence in the decade ahead. STUTTGART, DE / ACCESS Newswire / June 9, 2026 / WLF Energy GmbH today made its public debut at The Battery Show Europe in Stuttgart, unveiling its fully integrated clean-energy platform and long-term mission to deliver affordable, intelligent and sovereign energy infrastructure at global scale. The announcement was delivered by CEO and Chairman Sebastian Wolf, marking the company's first public appearance before a global audience of battery industry leaders, technology innovators and energy investors. The debut signals the arrival of a new kind of European energy company - one designed to integrate generation, storage, intelligence and energy trading into a single platform capable of making clean power the most affordable form of energy in Europe. Founded in 2026, WLF Energy is dev
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom