Business Wire

Greenland Resources Welcomes Canada’s Decision to Open a Consulate in Greenland

6.12.2024 20:07:00 CET | Business Wire | Press release

Share

Greenland Resources Inc. (Cboe CA: MOLY | FSE: M0LY) (“Greenland Resources” or the “Company”) welcomes the Government of Canada’s decision announced today to appoint an Arctic ambassador and open a consulate in Nuuk, Greenland. This follows the new Canadian Arctic Foreign Policy Framework to protect, together with its allies, the economic and military challenges including mineral resources security supply in the Arctic. The Company believes this is relevant for the Project as it is in negotiations to secure Capex funding from Canadian and recently announced European financial institutions and agencies in its press releases dated October 1 and October 15, 2024.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20241206778181/en/

Greenland Resources Inc.

Greenland Resources is a Canadian public company with the Ontario Securities Commission as its principal regulator and is focused on the development of its 100% owned Climax type primary molybdenum deposit located in central east Greenland. The Project has copper and also magnesium, a market dominated 98% by China. The Malmbjerg molybdenum project is an open pit operation with an environmentally friendly mine design focused on reduced water usage, low aquatic disturbance and low footprint due to modularized infrastructure. The Malmbjerg project benefits from an NI 43-101 Definitive Feasibility Study completed by Tetra Tech in 2022, with an US$820 million capex and a levered after-tax IRR of 33.8% and payback of 2.4 years, using US$18 per pound molybdenum price. The Proven and Probable Reserves are 245 million tonnes at 0.176% MoS2, for 571 million pounds of contained molybdenum metal. As the high-grade molybdenum is mined for the first half of the mine life, the average annual production for years one to ten is 32.8 million pounds per year of contained molybdenum metal at an average grade of 0.23% MoS2, approximately 25% of EU total yearly consumption. The project had a previous exploitation license granted in 2009. With offices in Toronto, the Company is led by a management team with an extensive track record in the mining industry and capital markets. For further details, please refer to our web site (www.greenlandresources.ca) and our Canadian regulatory filings on Greenland Resources’ profile at www.sedarplus.com.

The Project is supported by the European Raw Materials Alliance (ERMA). ERMA is managed by EIT RawMaterials, an organization within the EIT, a body of the European Union.

About Molybdenum and the European Union

Molybdenum is a critical metal used mainly in steel and chemicals that is needed in all technologies in the upcoming green energy transition. When added to steel and cast iron, it enhances strength, hardenability, weldability, toughness, temperature strength, and corrosion resistance. Based on data from the International Molybdenum Association and the European Commission Steel Report, the world produced around 576 million pounds of molybdenum in 2021 where the European Union (“EU”) as the second largest steel producer in the world used approximately 24% of global molybdenum supply and has no domestic molybdenum production. To a greater degree, the EU steel dependent industries like the automotive, construction, and engineering, represent around 18% of the EU’s ≈ US$16 trillion GDP. Greenland Resources strategically located Malmbjerg molybdenum project has the potential to supply in and for the EU approximately 25% of the EU consumption, of environmentally friendly high-quality molybdenum from a responsible EU Associate country, for decades to come. The high quality of the Malmbjerg ore, having low impurity content in phosphorus, tin, antimony, and arsenic, makes it an ideal source of molybdenum for the high-performance steel industry lead worldwide by Europe, specifically the Scandinavian countries and Germany.

Forward Looking Statements

This news release contains "forward-looking information" (also referred to as "forward looking statements"), which relate to future events or future performance and reflect management’s current expectations and assumptions. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "hopes", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Such forward-looking statements reflect management’s current beliefs and are based on assumptions made by and information currently available to the Company. All statements, other than statements of historical fact, are forward-looking statements or information. Forward-looking statements or information in this news release relate to, among other things: the Company’s objectives, goals or future plans; planned capex financing and outcomes of due diligence reviews; construction and engineering initiatives for the Malmbjerg molybdenum project; statements, exploration results, potential mineralization, the estimation of mineral resources and reserves, and their valuation, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions.

These forward-looking statements and information reflect the Company’s current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: future planned development and other activities on the Project; favourable outcomes of due diligence reviews; planned energy requirements of the Project; obtaining the permitting on the Project in a timely manner; no adverse changes to the planned operations of the Project; continued favourable relationships with local communities; current EU and other initiatives remaining in place into the future; expected demand for molybdenum in the EU and abroad, including by companies that expressed an interest in purchasing molybdenum; our mineral reserve estimates and the assumptions upon which they are based, including geotechnical and metallurgical characteristics of rock confirming to sampled results and metallurgical performance; tonnage of ore to be mined and processed; ore grades and recoveries; assumptions and discount rates being appropriately applied to the technical studies; estimated valuation and probability of success of the Company’s projects, including the Malmbjerg molybdenum project; prices for molybdenum remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company’s projects; capital decommissioning and reclamation estimates; mineral reserve and resource estimates and the assumptions upon which they are based; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner or at all; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements and information include known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements or information contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the favourable results of the SIA (Social Impact Assessment) and EIA (Environmental Impact Assessment); favourable local community support for the Project’s development; the projected demand for molybdenum both in the EU and elsewhere, including by companies that expressed an interest in purchasing molybdenum; the current initiatives and programs for resource development in the EU and abroad; the projected and actual status of supply chains, labour market, currency and commodity prices interest rates and inflation; the projected and actual status of the global and Canadian capital markets, fluctuations in molybdenum and commodity prices; fluctuations in prices for energy inputs, labour, materials, supplies and services (including transportation); fluctuations in currency markets (such as the Canadian dollar versus the U.S. dollar versus the Euro); operational risks and hazards inherent with the business of mining (including environmental accidents and hazards, industrial accidents, equipment breakdown, unusual or unexpected geological or structure formations, cave-ins, flooding and severe weather); inadequate insurance, or the inability to obtain insurance, to cover these risks and hazards; our ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; changes in laws, regulations and government practices in Greenland, including environmental, export and import laws and regulations; legal restrictions relating to mining; risks relating to expropriation; increased competition in the mining industry for equipment and qualified personnel; the availability of additional capital; title matters and the additional risks identified in our filings with Canadian securities regulators on SEDAR+ in Canada (available at www.sedarplus.ca). Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described, or intended. Investors are cautioned against undue reliance on forward-looking statements or information. These forward-looking statements are made as of the date hereof and, except as required by applicable securities regulations, the Company does not intend, and does not assume any obligation, to update the forward-looking information. Neither the Cboe Canada Exchange nor its regulation services provider accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

View source version on businesswire.com: https://www.businesswire.com/news/home/20241206778181/en/

Subscribe to releases from Business Wire

Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from Business Wire

ICE Brent and ICE WTI Perpetual Futures to Launch on OKX22.5.2026 14:30:00 CEST | Press release

OKX, a blockchain technology and trading company serving more than 120 million customers globally,and Intercontinental Exchange (NYSE: ICE), one of the world's leading providers of financial market technology and data powering global capital markets including the New York Stock Exchange, today announced plans for OKX to launch perpetual futures based on ICE's Brent Crude and WTI Crude energy benchmarks. The products are expected to be available to trade on OKX’s platform in jurisdictions where OKX is licensed to offer perpetual futures products. The new OKX contracts represent a major step forward in expanding regulated access to global commodity markets through digital asset infrastructure. This first product collaboration between OKX and ICE comes after the companies established a strategic relationship in March 2026. ICE operates some of the world’s leading exchanges, clearing houses and market data services across energy, commodities, fixed income and equities markets. ICE’s future

Enhertu® Recommended for Approval in the EU by CHMP for Patients with Previously Treated HER2 Positive Metastatic Solid Tumors22.5.2026 14:00:00 CEST | Press release

Enhertu® (trastuzumab deruxtecan) has been recommended for approval in the European Union (EU) as a monotherapy for the treatment of adult patients with unresectable or metastatic HER2 positive (immunohistochemistry [IHC] 3+) solid tumors who have received prior treatment and who have no satisfactory treatment options. Enhertu is a specifically engineered HER2 directed DXd antibody drug conjugate (ADC) discovered by Daiichi Sankyo (TSE: 4568) and being jointly developed and commercialized by Daiichi Sankyo and AstraZeneca (LSE/STO/NYSE: AZN). The Committee for Medicinal Products for Human Use (CHMP) of the European Medicines Agency (EMA) based its positive opinion on results from patients with HER2 positive (IHC 3+) tumors in three phase 2 trials including DESTINY-PanTumor02,DESTINY-Lung01 andDESTINY-CRC02 where Enhertu demonstrated clinically meaningful responses across a broad range of tumors. The recommendation will now be reviewed by the European Commission, which has the authority

Future Health Challenge Awards USD 300,000 to Early Detection and Population Health Sensing Tools on Sidelines of World Health Assembly22.5.2026 13:45:00 CEST | Press release

Global teams recognised in the Future Health Challenge for solutions designed to detect health risks earlier and support faster health system decisions Future Health – A Global Initiative by Abu Dhabi and MIT Solve announce the winners of the inaugural Future Health ChallengeWinning solution equips frontline health workers in low-resource settings with mobile clinical decision-support tools, enabling earlier detection and more effective care deliveryTeams competed for a USD 200,000 grand prize and two USD 50,000 runner-up awards on the sidelines of the 79th World Health Assembly in GenevaWinners recognised for solutions advancing anticipatory, data-driven health systems Three global teams developing early detection and real-time population health monitoring solutions have secured a total of USD 300,000 on the sidelines of the 79th World Health Assembly. The winning solutions address critical challenges in early detection, continuous population insight and more timely decision making, s

Pivotal Trial Data for EP0031 (A400), a Next-Generation Selective RET Inhibitor (SRI), in RET Positive Advanced NSCLC, to be Presented at ASCO 202622.5.2026 11:18:00 CEST | Press release

Ellipses Pharma (“Ellipses”), a global oncology drug development company with a pipeline of innovative programmes, announced today that its partner, Kelun-Biotech, is presenting pivotal trial data for EP0031/A400, for the potential treatment of RET-fusion positive Non-Small Cell Lung Cancer (NSCLC), at the 2026 American Society of Clinical Oncology (ASCO) Annual Meeting Chicago, May 29 to June 2. Efficacy and safety of lunbotinib (A400/EP0031), a next-generation selective RET inhibitor (SRI), from a pivotal phase Ⅱ study in patients with advanced RET-fusion positive non-small cell lung cancer (NSCLC), will be presented as an oral presentation scheduled on May 29, 2026, 14:36-14:48 local time (Abstract #8505: Lung Cancer – Non-Small Cell Metastatic). The oral presentation of these data at the prestigious ASCO annual meeting, represents another major milestone in the global development of EP0031/A400 as a next generation SRI. The data were generated in Kelun-Biotech’s Phase 2 study (NCT0

FPT Launches Flezi Foundry™, Advancing AI-Augmented Delivery for Global Enterprises22.5.2026 10:11:00 CEST | Press release

Global IT corporation FPT announced the launch of Flezi Foundry™ (FPT Digital Foundry™), an AI-augmented delivery platform for software development and IT operations. Built around a governed Service-as-a-Software model, the platform combines autonomous AI agents, human expert oversight, secure infrastructure, and outcome-based delivery mechanisms to help enterprises modernize technology delivery as AI agents become part of software engineering and IT operations. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260521235556/en/ Flezi Foundry applies Agentic Engineering, a structured delivery approach for software development and IT operations. The model brings AI agents into delivery workflows with human supervision, governance, transparency, and performance measurement built into the process. Flezi Foundry operates through two service modes: Agentic Development Lifecycle (ADLC) supports software development by using specialize

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye