Silver Tiger Metals Inc.
HALIFAX, NS / ACCESSWIRE / October 30, 2023 / Silver Tiger Metals Inc. (TSXV:SLVR)(OTCQX:SLVTF) ("Silver Tiger" or the "Corporation") is pleased to announce the filing of a Technical Report an updated Mineral Resource Estimate ("MRE") for its 100% owned, high-grade silver-gold El Tigre Project (the "Project" or "El Tigre") located in Sonora, Mexico. The Technical Report supports the scientific and technical disclosure in the Company's news release dated September 12, 2023, announcing the results of an updated Mineral Resource Estimate on the El Tigre Project. The Technical Report is available at www.sedarplus.ca under the Company's profile.
Highlights Include:
- In addition to the exploration work completed, an Exploration Target was established as follows: 7 to 9 million tonnes at 3.0 to 3.5 g/t AuEq for 675 koz to 1 Moz AuEq;
- Increase of 84% in Indicated Silver Equivalent ("AgEq") Ounces from initial September 2017 Mineral Resource, with 3% increase in AgEq grade;
- Increase of 257% in Inferred AgEq Ounces from initial September 2017 Mineral Resource, with an 13% increase in AgEq grade;
- Pit-constrained El Tigre Indicated Mineral Resources of 61.4 Million ounces (Moz) AgEq grading 44 g/t AgEq contained in 43.0 Million tonnes ("Mt");
- Pit-constrained El Tigre Inferred Mineral Resources of 20.0 Moz AgEq grading 54 g/t AgEq contained in 11.5 Mt;
- Out-of-Pit El Tigre Indicated Mineral Resources of 20.8 Moz AgEq grading 279 g/t AgEq contained in 2.3 Mt;
- Out-of-Pit El Tigre Inferred Mineral Resources of 69.8 Moz AgEq grading 235 g/t AgEq contained in 9.2 Mt;
- Out-of-Pit Indicated Mineral Resources, at a cut-off grade of 263 g/t AgEq (3.5 gpt AuEq), contains 12.8 Moz ounces AgEq grading 484 g/t AgEq within in 0.8 Mt;
- Out-of-Pit Inferred Mineral Resources, at a cut-off grade of 263 g/t AgEq (3.5 gpt AuEq), contains 32.4 Moz ounces AgEq grading 400 g/t AgEq within in 2.5 Mt; and
- The El Tigre Project Mineral Resource is amenable to both open pit and bulk underground mining methods,
Glenn Jessome, President and CEO, stated: "With the Technical Report and Mineral Resource Estimate now completed and filed, we quickly turn our attention back to El Tigre's economics and we will deliver our PEA in early November." Mr. Jessome continued: "What stands out in the filed Technical Report, not previously disclosed, is the Exploration Potential. The Technical Report establishes an Exploration Target for El Tigre of 7 to 9 million tonnes at 3.0 to 3.5 g/t AuEq for 675,000 ounces to 1 million ounces AuEq. We will immediately begin the process of drilling these significant potential additional ounces."
Indicated Mineral Resources are estimated at 46.4 Mt grading 25 g/t silver, 0.39 g/t gold, 0.01% copper, 0.03% lead, and 0.06% zinc (0.77 g/t AuEq). The Updated Mineral Resource Estimate includes Indicated Mineral Resources of 37.2 Moz of silver, 575 koz of gold, 9.4 Mlb of copper, 35.5 Mlb of lead, and 64.3 Mlb of zinc (1.1 Moz AuEq).
Inferred Mineral Resources are estimated at 20.9 Mt grading 78.4 g/t silver, 0.56 g/t gold, 0.04% copper, 0.13% lead, and 0.22% zinc (1.79 g/t AuEq). The Updated Mineral Resource Estimate includes Inferred Mineral Resources of 52.6 Moz of silver, 374 koz of gold, 18.1 Mlb of copper, 59.7 Mlb of lead, and 103.4 Mlb of zinc (1.2 Moz AuEq).
Figure 1: Isometric View of Block Model used in 2023 updated Mineral Resource Estimate.
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.Exploration Potential - El Tigre Project
In addition to the exploration work completed, an El Tigre Exploration Target was established as follows: 7 to 9 million tonnes at 3.0 to 3.5 g/t AuEq for 675 koz to 1 Moz AuEq*. The Exploration Target is shown in Figure 2.
*The potential quantities and grades of the Exploration Targets are conceptual in nature. There has been insufficient work done by a Qualified Person to define these estimates as Mineral Resources. The Company is not treating these estimates as Mineral Resources, and readers should not place undue reliance on these estimates. Even with additional work, there is no certainty that the estimates will be classified as Mineral Resources. In addition, there is no certainty that these estimates will ever prove to be economically recoverable.
Figure 2: Longitudinal Projection of Exploration Target.
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.Preliminary Economic Assessment Silver Tiger now expects to deliver its Preliminary Economic Assessment in November 2023.
Fall 2023 - Mining Conference Attendance - November 2023
Silver Tiger will conduct a busy November 2023 marketing schedule by attending the The New Orleans Investment Conference, from November 1 to 4 in New Orleans, The Red Cloud Fall Mining Showvcase on November 7 and 8 in Toronto, The Torrey Hills Capital Annual Emerging Growth Resource Conference from November 14 to 16 in Rancho Sante Fe, California and The Precious Metals Summit Zurich fron November 13 to 15.
Mineral Resource Estimate Methodology - El Tigre Project
A total of 482 drill holes (124,851 metres) and 3,160 surface and adit channel samples (6,473 metres) were used in the Mineral Resource Estimate. Historical underground chip samples from the El Tigre Mine, totaling 16,319, were used to define the vein limits only and not grade estimation.
P&E Mining Consultants Inc. ("P&E") collaborated with Silver Tiger personnel to develop the mineralization models, estimates, and reporting criteria for the Mineral Resources at El Tigre. Mineralization models were initially developed by Silver Tiger and were reviewed and modified by P&E. A total of twenty-three individual mineralized domains have been identified through drilling and surface sampling. The outlines of the halos and veins below surface from 0 to 100 m were influenced by the selection of mineralized material above 0.3 g/t AuEq, whereas 1.0 g/t AuEq was applied for the veins >100 m below surface that demonstrated lithological and structural zonal continuity along strike and down-dip.
Mineralization wireframes were used as hard boundaries for the purposes of grade estimation. A 5 m x 5 m x 5 m three-dimensional block model was used for the Mineral Resource Estimate. The block model consists of estimated Au, Ag, Cu, Pb and Zn grades, estimated bulk density, classification criteria, and a block volume inclusion percent factor. Au and Ag equivalent block grades were subsequently calculated from the estimated metal grades.
Sample assays were composited to a 1.5m standard length. Au, Ag, Cu, Pb and Zn grades were estimated using Inverse Distance Cubed weighting of between 1 and 12 composites, with a maximum of 2 composites per drill hole. Composites were capped prior to estimation by mineralization domain. Composite samples were selected within an anisotropic search ellipse oriented down the plunge of identified high grade trends.
A total of 5,699 bulk density analyses were provided in the drill hole database. The bulk density ranged from 1.6 (dump) to 3.02 t/m 3 in the mineralized wireframes.
Classification criteria were determined from observed grade and geological continuity as well as variography. Indicated Mineral Resources are informed by 2 or more drill holes within 50 m; Inferred Mineral Resources are informed by 1 or more drill holes with a search radius sufficient to populate the wireframes. No Measured Mineral Resources were calculated.
Table 2: El Tigre Project 2023 Mineral Resources Statement (1-11)
El Tigre Project - 2023 Mineral Resource Estimate (1-10) | ||||||||||||||||||
Area | Vein | Class | Cut-off | Tonnes | Au | Au | Ag | Ag | AuEq | AuEq | AgEq | AgEq | Cu | Cu | Pb | Pb | Zn | Zn |
AuEq (g/t) | (k) | (g/t) | (k oz) | (g/t) | (k oz) | (g/t) | (k oz) | (g/t) | (k oz) | (%) | (Mlb) | (%) | (Mlb) | (%) | (Mlb) | |||
Pit Constrained | Indicated | 0.14 | 43,002 | 0.39 | 535.3 | 15 | 20,049 | 0.59 | 818.4 | 44 | 61,381 | 0.00 | 1.8 | 0.01 | 7.0 | 0.02 | 14.3 | |
Inferred | 0.14 | 11,524 | 0.47 | 175.9 | 17 | 6,396 | 0.72 | 267.3 | 54 | 20,045 | 0.00 | 0.8 | 0.01 | 3.7 | 0.02 | 4.3 | ||
Out-of-pit | Indicated | 1.5 | 2,323 | 0.38 | 28.7 | 191 | 14,231 | 3.72 | 277.8 | 279 | 20,838 | 0.15 | 7.6 | 0.55 | 28.0 | 0.97 | 49.8 | |
Inferred | 1.5 | 9,229 | 0.66 | 196.6 | 155 | 45,885 | 3.14 | 930.7 | 235 | 69,801 | 0.09 | 17.3 | 0.27 | 55.9 | 0.49 | 99.0 | ||
Vein Total | Indicated | 0.14+1.5 | 45,325 | 0.39 | 564.0 | 24 | 34,279 | 0.75 | 1096.3 | 564 | 82,219 | 0.01 | 9.4 | 0.04 | 35.0 | 0.06 | 64.1 | |
Inferred | 0.14+1.5 | 20,753 | 0.56 | 372.6 | 78 | 52,282 | 1.80 | 1198.0 | 135 | 89,847 | 0.04 | 18.1 | 0.13 | 59.6 | 0.23 | 103.4 | ||
Low Grade Stockpiles | Indicated | 0.3 | 103 | 0.90 | 3.0 | 177 | 588 | 3.41 | 11.3 | 256 | 847 | 0.02 | 0.1 | 0.22 | 0.5 | 0.10 | 0.2 | |
Inferred | 0.3 | 18 | 0.46 | 0.3 | 146 | 83 | 2.52 | 1.4 | 189 | 108 | 0.02 | 0.0 | 0.17 | 0.1 | 0.09 | 0.0 | ||
Tailings | Indicated | 0.3 | 939 | 0.27 | 8.0 | 78 | 2,345 | 1.30 | 39.3 | 98 | 2,948 | |||||||
Inferred | 0.3 | 101 | 0.27 | 0.9 | 79 | 254 | 1.31 | 4.3 | 98 | 323 | ||||||||
Total (Vein+Stockpile+Tailing) | Indicated | 0.14+1.5+0.3 | 46,367 | 0.39 | 575.0 | 25 | 37,212 | 0.77 | 1146.9 | 58 | 86,014 | 0.01 | 9.4 | 0.03 | 35.5 | 0.06 | 64.3 | |
Inferred | 0.14+1.5+0.3 | 20,871 | 0.56 | 373.7 | 78 | 52,619 | 1.79 | 1203.7 | 135 | 90,277 | 0.04 | 18.1 | 0.13 | 59.7 | 0.22 | 103.4 |
- Mineral Resources which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
- The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.
- The Mineral Resources in this news release were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines (2014) prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council and CIM Best Practices (2019).
- Historically mined areas were depleted from the Mineral Resource model.
- Approximately 74.7% of the Indicated and 22.3% of the Inferred contained AgEq ounces are pit constrained, with the remainder out-of-pit. See tables 2 and 3 for details of the split between pit constrained and out-of-pit deposits.
- The pit constrained AuEq cut-off grade of 0.14 g/t was derived from US$1,800/oz Au price, US$24/oz Ag price, 80% process recovery for Ag and Au, US$5.30/tonne process cost and US$1.00/tonne G&A cost. The constraining pit optimization parameters were $1.86/t mineralized mining cost, $1.86/t waste mining cost and 50-degree pit slopes.
- The out-of-pit AuEq cut-off grade of 1.5 g/t AuEq was derived from US$1,800/oz Au price, US$24/oz Ag price, $4.00$/lb Cu, $0.95 $/lb Pb, $1.40 $/lb Zn, 85% process recovery for all metals, $50/t mining cost, US$20/tonne process and US$4 G&A cost. The out-of-pit Mineral Resource grade blocks were quantified above the 1.5 g/t AuEq cut-off, below the constraining pit shell within the constraining mineralized wireframes and exhibited sufficient continuity to be considered for cut and fill and long hole mining
- No Mineral Resources are classified as Measured.
- The tailings AuEq cut-off grade of 0.30 g/t was derived from US$1,800/oz Au price, US$24/oz Ag price, 85% process recovery for Ag and Au, US$14/t process cost and US$1.00/t G&A cost.
- AgEq and AuEq calculated at an Ag/Au ratio of 75:1.
- Totals may not agree due to rounding
Qualified Persons
Dave Duncan P. Geo., VP Exploration of Silver Tiger, Charles Spath, P. Geo., VP of Technical Services of Silver Tiger, and Eugene Puritch, P.Eng., FEC, CET, President of P&E Mining Consultants are the Qualified Persons as defined under National Instrument 43-101. Mr. Puritch is independent of Silver Tiger. Mr. Duncan, Mr. Spath and Mr. Puritch have reviewed and approved the scientific and technical information in this press release.
About Silver Tiger and the El Tigre Historic Mine District
Silver Tiger Metals Inc. is a Canadian company whose management has more than 25 years' experience discovering, financing and building large epithermal silver projects in Mexico. Silver Tiger's 100% owned 28,414 hectare Historic El Tigre Mining District is located in Sonora, Mexico. Principled environmental, social and governance practices are core priorities at Silver Tiger.
The El Tigre historic mine district is located in Sonora, Mexico and lies at the northern end of the Sierra Madre silver and gold belt which hosts many epithermal silver and gold deposits, including Dolores, Santa Elena and Las Chispas at the northern end. In 1896, gold was first discovered on the property in the Gold Hill area and mining started with the Brown Shaft in 1903. The focus soon changed to mining high-grade silver veins in the area with production coming from 3 parallel veins the El Tigre Vein, the Seitz Kelley Vein and the Sooy Vein. Underground mining on the middle El Tigre Vein extended 1,450 metres along strike and was mined on 14 levels to a depth of approximately 450 metres. The Seitz Kelley Vein was mined along strike for 1 kilometre to a depth of approximately 200 meters. The Sooy Vein was only mined along strike for 250 metres to a depth of approximately 150 metres. Mining abruptly stopped on all 3 of these veins when the price of silver collapsed to less than 20¢ per ounce with the onset of the Great Depression. By the time the mine closed in 1930, it is reported to have produced a total of 353,000 ounces of gold and 67.4 million ounces of silver from 1.87 million tons (Craig, 2012). The average grade mined during this period was over 2 kilograms silver equivalent per ton.
For further information, please contact:
Glenn Jessome
President and CEO
902 492 0298
jessome@silvertigermetals.com
CAUTIONARY STATEMENT:
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This News Release includes certain "forward-looking statements". All statements other than statements of historical fact included in this release, including, without limitation, statements regarding potential mineralization, Mineral Resources and Reserves, the ability to convert Inferred Mineral Resources to Indicated Mineral Resources, the ability to complete future drilling programs and infill sampling, the ability to extend resource blocks, the similarity of mineralization at El Tigre to Delores, Santa Elena and Chispas, exploration results, and future plans and objectives of Silver Tiger, are forward-looking statements that involve various risks and uncertainties. Forward-looking statements are frequently characterized by words such as "may", "is expected to", "anticipates", "estimates", "intends", "plans", "projection", "could", "vision", "goals", "objective" and "outlook" and other similar words. Although Silver Tiger believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Silver Tiger's expectations include risks and uncertainties related to exploration, development, operations, commodity prices and global financial volatility, risk and uncertainties of operating in a foreign jurisdiction as well as additional risks described from time to time in the filings made by Silver Tiger with securities regulators.
SOURCE: Silver Tiger Metals Inc.
View source version on accesswire.com:
https://www.accesswire.com/797191/silver-tiger-announces-filing-of-technical-report-for-updated-mineral-resource-estimate-for-the-el-tigre-silver-gold-project
To view this piece of content from www.accesswire.com, please give your consent at the top of this page.
About ACCESS Newswire
Subscribe to releases from ACCESS Newswire
Subscribe to all the latest releases from ACCESS Newswire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from ACCESS Newswire
Global Sports Brand U.S. Polo Assn. to Become Title Sponsor of the Palm Beaches Marathon28.8.2025 15:00:00 CEST | Press release
Marathon Returns December 13-14, 2025, Early Registration Now Open WEST PALM BEACH, FLORIDA / ACCESS Newswire / August 28, 2025 / U.S. Polo Assn., the official sports brand of the United States Polo Association (USPA), has agreed to a multi-year partnership as the new title sponsor of The Palm Beaches Marathon. The U.S. Polo Assn. Palm Beaches Marathon, a race owned and managed by Ken Kennerly's K2 Sports Ventures, will be held in Downtown West Palm Beach, Florida, on December 13-14, 2025. This renowned marathon event is recognized for its beautiful views of the waterfront and palm-tree-lined streets and welcomes runners from across the country and around the world to the warmth of Florida during the cold winter months. It is also a qualifier for the legendary Boston Marathon. "U.S. Polo Assn. is honored to be the Title Sponsor of The Palm Beaches Marathon, an iconic event that, like our brand, is deeply rooted in this vibrant community of Palm Beach County," said J. Michael Prince, Pr
Hydrosat Secures Major European Contract to Advance Large-Scale Water Productivity Mapping28.8.2025 13:30:00 CEST | Press release
The contract will leverage Hydrosat's AI-powered thermal data to help governments and institutions monitor and optimise agricultural water. LUXEMBOURG, LU / ACCESS Newswire / August 28, 2025 / Hydrosat, a company leveraging thermal satellite data and AI to address global challenges in food production, security, and natural resource management, announced today that it has been awarded a contract by the European Space Agency (ESA), under the LuxIMPULSE programme, to develop a large-scale water productivity tool for regional and national applications. Governments and agricultural stakeholders are under mounting pressure to optimise water use while balancing the competing demands of cities, industry, and the environment. Addressing this challenge requires accurate, crop-specific insights into water needs, usage patterns, soil moisture, and yield forecasts - all information that has historically been limited or unreliable. Hydrosat's solution will enable large-scale mapping of water availab
GA-ASI Marks Another Aviation First with YFQ-42A CCA Flight Testing27.8.2025 23:30:00 CEST | Press release
SAN DIEGO, CALIFORNIA / ACCESS Newswire / August 27, 2025 / The YFQ-42A Collaborative Combat Aircraft, designed and developed by General Atomics Aeronautical Systems, Inc. (GA-ASI), is now conducting flight testing in coordination with the U.S. Air Force. This historic achievement continues the company's rapid creation of new, jet-powered uncrewed platforms chartered by the U.S. Air Force (USAF) to achieve air dominance while being designed for rapid production, in large quantities, at an affordable price. "What a great moment for the U.S. Air Force and for GA-ASI," said GA-ASI President David R. Alexander. "It's been our collaboration that enabled us to build and fly the YFQ-42A in just over a year. It's an incredible achievement and I salute the Air Force for its vision and I salute our development team for delivering yet another historic first for our company." The YFQ-42A is GA-ASI's newest uncrewed jet, focused on air-to-air semi-autonomous operation and based on the genus-species
Telestream Global Ingest Workflow Powered by Vantage Opens the Front Door to Media Creation27.8.2025 16:55:00 CEST | Press release
Unified ingest strategy spans live, camera card, and file-based workflows with hybrid-cloud scalability and system-aware metadata: See it in action at IBC2025 NEVADA CITY, CA / ACCESS Newswire / August 27, 2025 / Telestream, a global leader in media workflow technologies, will debut its new Global Ingest strategy at IBC2025, introducing a next-generation ingest architecture that seamlessly unifies live capture, camera card ingest, and file-based workflows. Built on the proven Vantage platform, the new workflow capabilities are designed for ultimate flexibility, scalability, and efficiency, supporting on-premises, hybrid, and cloud environments. Central to the strategy is Telestream's practical use of AI. Rather than generating unstructured "metadata dumps," Telestream Global Ingest produces structured, system-aware, and standards-compliant metadata at the point of capture. This enables instant interoperability with a wide range of platforms, such as Avid, Iconik, and Mimir, acceleratin
Formerra Appointed Distributor for Italy's Epaflex TPU Lines in the UK & Ireland27.8.2025 15:00:00 CEST | Press release
Agreement combines advanced TPU portfolio with Formerra's expert compliance know-how and agile service. ROMEOVILLE, ILLINOIS / ACCESS Newswire / August 27, 2025 / Formerra, a leader in performance materials distribution, today announced an agreement with Epaflex S.r.l. that designates Formerra Europe as the preferred distributor of Epaflex's thermoplastic polyurethane (TPU) lines in the United Kingdom and Republic of Ireland. The partnership leverages Epaflex's 30-year legacy of innovation in TPU manufacturing with Formerra's deep expertise in UK/EU REACH compliance, local technical support, and agile logistics. Additionally, the collaboration ensures that process engineers and sourcing managers across cable, wire, industrial, automation, and oil & gas markets gain seamless access to high-performance TPU grades backed by responsive service and regulatory guidance. "We're proud to welcome Epaflex's industry-leading TPU portfolio into our specialist distribution network," said Ronan Kenn
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom